1.0 PURPOSE :
2.0 SCOPE :
o This SOP shall be used as such for “Good Chromatographic Practices” in Quality
Control Laboratory.
o To carry out the analysis and record the findings as per SOP.
o To intimate the Head QC / designee in case of any deviation from the SOP.
o Indicate on the status board, the name of product/ material, batch number / A.R.No.,
Stage, Test, Start time, and Analyst (Sign/Date) prior to starting the chromatography.
o Use always filtered degassed Chromatography (HPLC) grade solvents/ mobile phases.
o Ensure that the date and time of data acquisition appear on each chromatogram and
the chromatograms are compiled in succession.
o System suitability parameters shall be checked by the analyst before proceeding with
the sample analysis.
o All solutions shall be clear homogeneous and free from particulate matter.
o While going through change over from reverse phase to normal phase and normal
phase to reverse phase follow the changeover steps.
o Use MilliQ or any high purity water (suitable for chromatography) for the preparation of
the mobile phase.
o Never mix the aqueous phase and organic phase portion in measuring cylinder as it can
give erroneous composition.
o Column shall be washed pre and post running of the sample set.
o Flush the High-Performance Liquid Chromatography (HPLC) system with hot water
(Approx. Temp 50-600C or as per the suitability of tubing) by using union in place of
Column at least by weekly.
o If the mobile phase contains a buffer solution, first calculate the quantity of the mobile
phase required for complete analysis (including quantity required for dilution) and
prepare the buffer solution as per the procedure.
o Set the pH (If required) and do not use concentrated acid/alkali directly for pH
adjustment,
o The filter also can be done at the time of the final mobile phase composition, if
applicable.
o Measure the aliquot of buffer solution required in the mobile phase composition.
o Add to the stoppered bottle containing a buffer solution and mix well.
o Do not degas the mobile phase for a longer time containing organic solvents.
o It may alter the composition while sonication ensures that the bottle cap is loosened to
avoid the pressure built up.
o If the mobile phase is reverse-phase then rinse the filtration assembly and
o Collection vessel with water before filtration followed by the mobile phase.
o If the mobile phase is a normal phase then rinse the filtration assembly and collection
vessel with the water-miscible component of the mobile phase before filtration
followed by the mobile phase.
o Do not sonicate the buffer solution prepared by using acetate and phosphate buffer
since on sonication it forms the complex which may interfere with the analysis.
o Physically check the column intactness and then Connect the column on HPLC.
o Saturate the column with the mobile phase for about 30 minutes or more until the
baseline gets stabilized.
o The injection sequence (sample set) shall be prepared by the analyst for the respective
tests.
o The injection sequence shall contain the following but not limited to:
Vial No.
Injection volume.
Sample name (sufficient details to link each chromatogram with the sample, like
Product name, B. No./AR No., Stage).
o Before starting the sequence, the reviewer or section head shall ensure that the
sequence (sample set) parameter and respective instrument method parameters are as
per STP/GTP.
o There shall not be any trial injection run to check the suitability of the system (except
System Suitability run defined in respective STP/GTP).
Peak shape,
Retention time,
Resolution,
Asymmetry,
System pressure and theoretical plates, etc. from the system suitability run /
First run of Standard preparation and
o After satisfactory system suitability run (if applicable) inject blank (i.e. diluents, mobile
phase, etc.) standard solution, check the system suitability parameters, and if it meets
then start sequence.
o If peak splitting or broadness of peak occurs during the analysis stop the analysis, then
after proper washing of column bracketing standard injection/system suitability solution
shall be injected.
o If it meets with the system suitability then analysis shall be carried on from that sample
where peak splitting or broadness took place.
o After completion of the analysis, wash the column with an appropriate solvent for the
appropriate time (e.g. Column shall be washed with water for a long time if the buffer
concentration is more in the mobile phase and/or if the column is used for a long time),
rinse/ purge auto-injector and make necessary entry in the “Column usage log” and in
“Instrument usage logbook”.
o If the peak shape is not satisfactory system suitability parameters are not achieved as
per the limit even after making necessary modifications in the system, the column can
be changed with the following documentation.
Make entry of previously used column in the column usage log with the reason
of discontinuation and keep for washing.
Take the print of all chromatograms generated on the previous column and put
the reason for column change on the Chromatogram checklist along with the
previous column no.
o If the peak shape is not satisfactory or resolution is not achieved or the theoretical plate
and/or tailing factor is not within the limit even after making necessary modifications in
the system mobile phase can be changed with the following documentation.
Make an entry in the instrument usage logbook with the reason for
discontinuation of the mobile phase.
System suitability check is a must for every new mobile phase and column.
The mobile phase cannot be added in between the analysis of the running
mobile.
Note A) ± 10% flow rate adjustment in RT shall be considered during the analysis.
B) ± 1-minute tolerance shall be considered for retention time up to 10 minutes, ± 10% tolerance
shall be considered for retention time more than 10 minutes.
o Adjustments are permitted only when suitable standards (including Reference Standards
/ Working Standard) are available for all compounds used in the suitability test; and
o The adjustments or column change yields a chromatogram that meets all the system
suitability requirements specified in the official procedure.
o Each of the items in the following list is the maximum variation that can be considered
unless otherwise directed in the ATP.
o Multiple adjustments can have a cumulative effect on the performance of the system
and are to be considered carefully before implementation.
o In either case, changes in the chemical characteristics (“L” designation) of the stationary
phase will be considered a modification to the method and will require full validation.
o Adjustments to the composition of the mobile phase in gradient elution may cause
changes in selectivity and are not recommended.
o The adjustments are allowed only to improve the quality of the chromatography unless
otherwise directed in the respective pharmacopoeial monograph/GTP/STP.
Note: Modification in the allowable chromatographic system shall be within the raggedness
study performed during the method validation study.
o The dis-positioning of the batch/sample will be subject to the approval of this report.
o Alternate columns (Different make) can be used in case of column fails to meet the
system suitability requirement.
o But it should be defined in respective GTP/STP and also covered under AMV /
Pharmacopoeial evaluation study.
o The following are the general criteria, which provide the extent of allowable variation to
get the system suitability.
o The pH of the aqueous buffer used in the mobile phase preparation can be adjusted to
within ±2 pH units.
o Example: If the specified pH is 7.0 then the allowable limit for adjustment is 6.80 – 7.20.
o The concentration of salts used in the preparation of aqueous buffer used in the mobile
phase can be adjusted within ±10%
o (Ex.: If the specified concentration is 1.0% then the allowable limit for adjustment is 0.90
% – 1.10 %).
o (Ex.: If specified length is 25 cm then allowable limit for adjustment is 7.5 cm – 42.5 cm).
o (Ex.: If specified internal diameter is 4.6 mm then allowable limit for adjustment is 3.45
– 5.75 mm.).
o Particle size :
o Where,
o F1: Flow indicated in the monograph in ml/min,
o F2: Adjusted flow rate, in ml/min,
o L1: Length of column indicated in the monograph,
o L2: Length of column used,
o d: Column inner diameter of the column indicated in the monograph
o D: Internal diameter of the column used
o Additionally, the flow rate can be adjusted ± 50 %.
o (Ex.: If specified column temperature is 40°C then allowable limit for adjustment is 36° –
44°C).
Note: If the column temperature and sample temperature are not mentioned in the ATP/STP, or
it is mentioned to keep it “Ambient”, then in both cases the column temperature shall be set to
25°C and sample temperature to 15°C.
o Detector wavelength:
o Deviations from the wavelengths specified in the method are not permitted.
o Injection volume:
o The following adjustment limits apply to minor components of the mobile phase
(specified at 50% or less).
o However the change in any component cannot exceed + 10% of absolute (i.e. in relation
to the total mobile phase), nor can the final concentration of any component be
reduced to zero.
o Therefore, the mobile phase ratio may be adjusted only within the range of 40:60 to
60:40.
o For the second component, 30% of 35 is 10.5% absolute, which exceeds the maximum
permitted change of + 10% absolute in any component.
o Therefore the second component may be adjusted only within the range of 25% to 45%
absolute.
o In all cases, a sufficient quantity of the first component is used to give a total of 100%.
o The duplicate standard shall be applied for the Assay test (irrespective of sample
category).
o 2nd Standard shall be injected in duplicate after System suitability run (After completion
of 5/6 replicate standard injection and prior to the sample run).
o The first standard (Initial standard) shall be injected as per the above schedules, while
the second standard shall be injected in duplicate.
o The correlation between two standards shall be calculated as per the below formula.
o After every defined sample injections or after every test (Club analysis or individual
analysis) standard preparation in single shall be injected (Called as Bracketing standard
preparation).
o Bracketing Standards shall be injected after 12 injections or 3 hrs after the last standard
injection injected whichever is earlier.
o Bracketing standard can be injected other than the above conditions (Completion of
Test, After 3 Hrs, After 12 sample injection), It should be justified and documented.
o To meet the system suitability criteria of method %RSD of last five injections (including
Bracketing Standard) area to be considered,
o the average area including bracketing standard preparations shall be used in the
calculations.
o For e.g. If System suitability is established by five injections of standard injection (1 st, 2nd,
3rd, 4th, and 5th ).
o After testing the sample (A) preparations (6th and 7th ) and one bracketing standard
preparation injection (8th ) shall be injected.
o Then further sample (B) preparation injections ( 9 th and 10th ) followed by bracketing
standard (11th ).
o Standard Avg. Area = Avg. Area of std (2 nd, 3rd, 4th 5thand 8th).
o Standard Avg. Area = Avg. Area of std (3 rd,4th,5th, 8th, and 11th ).
o The analyst shall log the Lab Incident (as per the current version of SOP for Lab Incident)
and investigate the reason for failure, adopt the strategy as follows.
o If the failure in RSD is because of system instability, bracketing standard RSD shall be
considered up to last bracketing standard till it meets the criteria of system suitability
and analysis of remaining samples shall be carried after reestablishing the system
suitability as per the GTP.
o If there is a significant change in one of the injection area of bracketing standard and
analysis is continued.
o Additional injections of bracketing standard shall be done and reason for variation in the
previous injection of bracketing standard shall be justified.
o In case of vial missing/solution volume inside the vial is less than required, area variation
between replicate injection, additional peak observed, re-injection from the same vial,
or from the same solution shall be done, with proper scientific justification.
o Additional injection of the Blank-mobile phase and/or diluent, placebo preparation, and
impurity standard can be injected to verify the elution pattern and peak identification of
Blank, placebo, and impurity.
Note1: Chromatograms shall be processed within one working day from the completion of the
sequence. If exceeds, Log the Lab incident, Investigate / Justify and then process the acquired
data.
o Analysts shall ensure the peak shape and system suitability parameters for all
chromatograms in a sequence (i.e.Up to the last chromatogram) before the set up of
integration parameters.
o Set the integration parameters like width, threshold, peak area, peak height, scale are
selected appropriately for proper peak marking and detection and inhibit all others
peaks except the principal peak in all tests except for related substance test and
degradation product, Chromatography purity (but not limited to).
o Integration parameters shall be the same for all chromatograms generated in a
sequence or test.
o In case of the integration of peak is not possible by software, manual integration can be
done for the proper peak integration with justification (Only in RS test).
o In the system, suitability chromatogram identifies the peaks, its RRT, System suitability
parameters, peak shape, and report the values as applicable.
Blank-Diluent,
Placebo,
Principal peak,
Unknown impurity,
o Inhibit those peaks in the sample whose responses are similar in placebo and blank.
o In the case of the RS test, attach the overlay chromatogram of the sample, blank, and
placebo for clarity of peaks.
o The custom report shall cover the following information but not limited, which is for
information and can be modified as per the specific need.
Name of Product / Raw Material
Test performed
Data Path
Injection volume
Vial no.
Column number / ID
WaveLength.
Date of acquisition
Date processed
Acquired by /Analyst
Instrument ID
Instrument method ID
Processing method ID
o The peak table in the custom report shall cover the following data (But not Limited to),
however other data as per requirement.
Peak Name
Retention time
Area / Height
Area% / Height%
o If Degradation / Related substances are to be calculated from Assay, take the separate
print out of the first injection of each sample chromatogram by setting the width and
threshold appropriately to detect all peaks along with blank or placebo.
o Report the system suitability data (theoretical plate, tailing factor, capacity factor, etc.)
in the respective analytical template.
o In cases where reintegration is necessary, all the chromatograms from the previous
integration or multiple integrations shall be identified, assessed, justified and shall be
part of the raw data and set of chromatograms (previous Processing method print out,
audit trail (for that specific change) and the print out shall be attached with the
sequence of record).
o The analyst shall be zoomed the chromatograms on the baseline and shall check that all
the peaks are integrated and the integration of all interested peaks are properly
marked.
o The integration parameters shall set in such a way that the peak of at least half of the
disregard limit must be integrated, and shall be documented in the Chromatogram
checklist.
o The scale of chromatograms shall be set properly so that the peak shape of all
interesting peaks and their integration can be seen clearly.
o In the chromatogram peak shall be identified by RT only and other detail like peak
identification, etc. shall be part of the peak table.
o The sample chromatogram shall overlay with diluent and placebo chromatograms to
identify the interested peak properly.
o The scale of chromatogram shall be such that the response of principal peak is at least
70% of the full-scale deflection or Autoscale of the chromatograms.
o In the related substances/chromatographic purity/degradation test exclude the area of
diluent/placebo peak in the impurity calculation.
o Where disregard peak/area is mentioned in GTP (based on LOQ performed during AMV),
those peak/ peaks area shall be ignored in the calculation.
o In the calculation of impurity disregard the peak of response below 0.03% with respect
to the principal peak where LOQ is not available.
o In the calculation of known and unknown impurity disregard the peak of response below
LOQ level.
o Where,
o In the calculation of known and unknown impurity disregard the peak of response below
LOQ level.
o Where impurity standard is not injected and LOQ and RF are mentioned in
GTP/Protocol.
L x A x RF
C
o Where,
o In the case where RF is mentioned in the GTP corrected area of respective impurity shall
be used in the calculation.
o Fill the detail like Product / Sample, Test, Reference (GTP/Protocol No./Template No.),
Bach No., A.R.No., in Chromatogram checklist.
o Put the “ √ ” mark against the applicable point and ‘NA’ against the not applicable
points.
o If any parameter in the Chromatogram checklist is not complying or not carried out
writing the justification under the head “Remark” or if the deviation is filled mention the
deviation no.
o Put all chromatograms together and attach them with the relevant Batch No./ A.R.No.
Document.
o Take the print out of all generated chromatograms put the canceled on each
chromatogram with proper justification and attaches with the relevant document.
General Guideline and instructions for Chromatography:
o Chromatographic systems shall be reviewed by the reviewer for events, such as,
Unprocessed chromatograms,
Single injections,
o Which are not part of the original sequences on a weekly basis and
o Document the review observations as per the current version of SOP for Analytical Data
Review.
o Any of the above events are observed, log the lab incident as per the current version of
the SOP-Lab Incident.
o For any chromatographic run incident, such as incomplete run, discontinued run or run
for system suitability check (or for any other reason ) and not considered for evaluation
shall be marked as “Not Used” with proper justification, signature, date, and shall be
made part of main sample sequence set attached with the batch analytical
documentation.
o “Printed on date and time” of chromatograms shall be part of the chromatogram report
format.
o Chromatograms shall be processed within one working day from the completion of the
sequence.
o QC head shall identify instruments that are not in compliance with 21 CFR part 11.
o Derive an action plan with a timeline to make all such instrument compliant (refer
current version of SOP for Data Integrity
o All the activities performed by the service technician shall be recorded in the report and
the same shall be reviewed and approved as per respective report approval procedure.
o For related substances test / Degradation product, New cleaned vial shall be used.
o In case of specific impurity analysis, run the chromatogram about 5 minutes extra after
the principal peak elution is over and the peak is properly integrated.
o In case the HPLC system is running in the mobile phase (subject to sufficient mobile
phase volume available) and the further sample is supposed to inject,
If the time gap is 2 hrs. or less further samples can be injected directly.
o Calculate the RSD of bracketing standard (i.e. last two injections of initial system
suitability standard and injections of bracketing standard made after time gap) and if
this is satisfactory further sample analysis shall be continued.
o In the end of the sample sequence a different method for “D2 lamp off and flow rate
change to 0.2ml/min (or suitable)” shall be submitted to keep the system stabilize in the
mobile phase.
o If any carryover in the chromatogram is not affecting the interested peak analysis shall
be considered after proper justification and authorization.
o The concentration of any unknown peak in assay, dissolution, and content uniformity
test, shall not be more than the concentration of unknown impurity peak in related
substances test. (As related substances unknown impurity limit is derived based on ICH
daily dose criteria.)
o Additional injection of placebo solution and impurity solution with or without spiking
can be made where ever necessary with proper justification.
o In case, if during analysis any failure in established system suitability, peak splitting, area
variation shall be rectified on line by altering the same sequence with justification.
o In the case of the sample if any abnormality is observed during analysis then a freshly
prepared sample can be injected with proper justification.
o At the verification stage during raw data review by comparing the chromatogram
against specimen chromatograms, the laboratory shall maintain a file of “Specimen
Chromatograms “for each HPLC test ( product wise).
o To prepare the specimen chromatogram and ensure its usage the below procedure to
be followed.
Peak shape
Retention time
Scale of chromatogram
Additional peak
Blank (diluent),
Resolution solution,
Standard solution,
Placebo solution,
o File all the “ Specimen chromatograms” product and test wise for the comparison of all
future analyses.
o During routine analysis, the analyst shall verify the chromatogram against Specimen
Chromatograms.
o QC-Head or designee shall suggest an analyst for allowable modification to get the
chromatography that is comparable with the “ Specimen chromatogram”.
o During raw data review, the reviewer shall verify the chromatograms against the
“specimen chromatogram”, in case of any abnormality observed.
o Whenever there is any change in method of analysis, the impact on the “Specimen
chromatogram” shall be evaluated.
o Cancellation of Chromatograms :
o Section head shall put the canceled stamp on each canceled chromatograms with
proper justification with sign and date.
o Keep all tubing reservoirs in the bottle containing HPLC water/Solvent (degassed) and
proceed following steps.
o Take 100 % HPLC water in Mobile phase reservoirs, and execute the dry prime 5 minutes
individually for each channel (line) at flow rate 5ml/minutes during the dry prime outlet
valve shall be opened.
o Execute the wet prime 3 minutes individually for each channel (line) at flow rate
5ml/minutes during the dry prime outlet valve shall be opened.
o Perform these activities for the time as per default settings subsequently.
o Step 5:
o Flush the HPLC system for 20 minutes by gradually increase the flow 1ml/minute to
5ml/minute, 25% flow from each channel / Pump (line).
o Step 6 :
o Repeat wet prime, needle wash, seal wash, and injector wash as per procedure
mentioned above in steps 2, 3, and 4 by using 100% HPLC grade methanol.
o Step 7 :
o Repeat wet prime, needle wash, seal wash, and injector wash as per procedure
mentioned above in step 2, 3, and 4 by using 100 %HPLC grade IPA.
o Step 8 :
o Use 100% IPA or other non-polar solvents as per GTP or template for seal wash or
needle wash during the analysis.
o Keep all tubing reservoirs in the bottle containing HPLC water /solvent (degassed) and
proceed following steps.
o Take 100 % Isopropyl Alcohol (IPA) in Mobile phase reservoirs, and execute the dry
prime 5 minutes individually for each channel (line) at flow rate 5ml/minutes during the
dry prime outlet valve shall be opened.
o Execute the wet prime 3 minutes individually for each channel (line) at flow rate
5ml/minutes during the dry prime outlet valve shall be opened.
o Perform these activities for the time as per default settings subsequently.
o Step 5:
o Flush the HPLC system for 20 minutes by gradually increase the flow 1ml/minute to
5ml/minute, 25% flow from each channel (line).
o Step 6:
o Repeat wet prime, needle wash, seal wash, and injector wash as per procedure
mentioned above in step 2, 3, and 4 by using 100% HPLC grade methanol.
o Step 7:
o Repeat wet prime, needle wash, seal wash, and injector wash as per procedure
mentioned above in step 2, 3, and 4 by using 100 %HPLC grade water.
o Step 8:
o Flush the HPLC system for 20 minutes by gradually increase the flow rate 1 ml/min to 5
ml/minutes, 25% flow from each channel (line), (In case of the Quaternary pump).
o References :
o 21 CFR Part 11: Electronic Records ; Electronic Signatures