You are on page 1of 10

E S T I M A T E

DIVISION : Zilla Parishad, Kolhapur

SUB-DIVISION : Panchayat Samiti, Karveer

FUND HEAD :

MAJOR HEAD :

MINOR HEAD :

SERVICE HEAD :

DEPARTMENTAL HEAD :

Estimate framed in the Office of the Executive Engineer(Works), Zilla Parishad,


Kolhapur for the probable expenses that will be incurred for the work of Providing
special repair work of toielt for anganwadi Gokul Shirgaon Tal-Karveer Dist-Kolhapur
(15 TH FC)

=================
Rs. 60,000.00
=================

Estimate Prepared by : DEPUTY ENGINEER

Estimate Checked by :

Technical Sanction :

Dated : / /

Administrative Approval :

Dated : / /

GENERAL DESCRIPTION

- - - As per separate sheet attached - - -

Estimate No : 001952
SIS-ETM/1481014_€ƒ‡¢£µ4.6.6
Zilla Parishad, Kolhapur Panchayat Samiti, Karveer

Name of Work : Providing special repair work of toielt for


anganwadi Gokul Shirgaon Tal-Karveer Dist-Kolhapur
(15 TH FC)

R E C A P I T U L A T I O N - S H E E T
==========================================================================================
Sub-Estimate No & Name Amount
==========================================================================================

1 Work Portion Rs. 53,339.00

Add Insurance towards Labour @ 0.50% On (A) Rs. 267.00

Add G.S.T. on Residencial Buildings @ 12.00% On (B) Rs. 6,394.00


=================
Rs. 60,000.00

Say Rs. 60,000.00


==========================================================================================

Junior/Sectional Engineer Deputy Engineer (Works)


Panchayat Samiti, Karveer Panchayat Samiti, Karveer

Estimate No : 001952
SIS-ETM/1481014_€ƒ‡¢£µ4.6.6
Zilla Parishad, Kolhapur Panchayat Samiti, Karveer

Name of Work : Providing special repair work of toielt for


anganwadi Gokul Shirgaon Tal-Karveer Dist-Kolhapur
(15 TH FC)

A B S T R A C T
==========================================================================================
Quantity Description Rate Unit Amount
==========================================================================================
ITEM NO : 1
31.860 Providing and laying vitrified mirror / glossy 1300.95 One 41448.27
Square finish tiles decorative type having size 590 Square
Metre milimetre to 605 milimetre X 590 milimetre to 605 Metre
milimetre of 8 milimetre to 10 milimetre thickness
and confirming to Indian Standard 15622-2006 (Group
BIa) of approved make, shade and pattern for
flooring in required position laid on a bed of 1:4
cement mortar including neat cement float, filling
joints, curing and cleaning, excetra complete. -
Flooring (For Ground Floor) (using ARTIFICIAL
SAND).
Rate as per R. A. No. - 1

ITEM NO : 2
8.460 Providing internal cement plaster 20 milimetre 412.00 One 3485.52
Square thick in single coat in cement mortar 1:4 without Square
Metre neeru finish to concrete, brick surface, in all Metre
positions including scaffolding and curing, excetra
complete. (For Ground Floor) (using ARTIFICIAL
SAND).
Rate as per R. A. No. - 2

ITEM NO : 3
0.970 Providing second class Burnt Brick masonry with 8665.05 One 8405.10
Cubic conventional / Indian Standard type bricks in Cubic
Metre cement mortar 1:6 superstructure including striking Metre
joints, racking out joints, watering and
scaffolding, excetra complete. (For Ground Floor)
(using ARTIFICIAL SAND).
Rate as per R. A. No. - 3

=================
53,338.89
Say Rs. 53,339.00
=================

Junior/Sectional Engineer Deputy Engineer (Works)


Panchayat Samiti, Karveer Panchayat Samiti, Karveer

Estimate No : 001952
SIS-ETM/1481014_€ƒ‡¢£µ4.6.6
Zilla Parishad, Kolhapur Panchayat Samiti, Karveer

Name of Work : Providing special repair work of toielt for


anganwadi Gokul Shirgaon Tal-Karveer Dist-Kolhapur
(15 TH FC)

M E A R S U R E M E N T
==========================================================================================
No. Length Breadth Height Quantity
==========================================================================================
ITEM NO : 1
P/L vitrified mirror / glossy finish tiles 590 to 605 X 590 to 605 X 8 to 10 mm th. -
Flooring (For Ground Floor) (using ART. SAND).

1 1.0 * 6.000 * 5.310 * --- = 31.860


===============
31.860
Square Metre
===============
ITEM NO : 2
Internal C.P. 20 mm th single coat in C.M. 1:4. (For Ground Floor) (using ART. SAND).

1 2.0 * 1.500 * --- * 2.820 = 8.460


===============
8.460
Square Metre
===============
ITEM NO : 3
IInd class B.B. masonry in C.M. 1:6 superstructure. (For Ground Floor) (using ART. SAND).

1 1.0 * 1.500 * 0.230 * 2.800 = 0.966


===============
0.970
Cubic Metre
===============

Junior/Sectional Engineer
Panchayat Samiti, Karveer

Estimate No : 001952
SIS-ETM/1481014_€ƒ‡¢£µ4.6.6
Zilla Parishad, Kolhapur Panchayat S

Name of Work : Providing special repair work of toielt for


anganwadi Gokul Shirgaon Tal-Karveer Dist-Kolhapur
(15 TH FC)

Q U A R R Y C H A R T

=========================================================================================================
Sr # Material Source Lead Break-up
=========================================================================================================
1 Cement local 5
2 Artificial Sand shiye 15
3 Flooring Tiles midc 15
4 Bricks local 5
=========================================================================================================
Zilla Parishad, Kolhapur Panchayat Samiti, Karveer

Name of Work : Providing special repair work of toielt for


anganwadi Gokul Shirgaon Tal-Karveer Dist-Kolhapur
(15 TH FC)

L E A D S T A T E M E N T
==========================================================================================
Additial Lead Charges
Sr Material Lead in Lead Initial Net Lead Source
No K. M. Charge Lead Charge
==========================================================================================
1 Cement 5.000 148.81 0.00 148.81 local
2 Artificial Sand 15.000 355.50 0.00 355.50 shiye
3 Flooring Tiles 15.000 25.24 0.00 25.24 midc
4 Bricks 5.000 0.47926 0.00000 0.47926 local
==========================================================================================

Junior/Sectional Engineer Deputy Engineer (Works)


Panchayat Samiti, Karveer Panchayat Samiti, Karveer

Estimate No : 001952
SIS-ETM/1481014_€ƒ‡¢£µ4.6.6
Zilla Parishad, Kolhapur Panchayat Samiti, Karveer

Name of Work : Providing special repair work of toielt for


anganwadi Gokul Shirgaon Tal-Karveer Dist-Kolhapur
(15 TH FC)

R A T E A N A L Y S I S
==========================================================================================
R.A. NO : 1
Providing & laying vitrified mirror / glossy finish tiles decorative type having size 590
to 605 X 590 to 605 mm of 8 to 10 mm thick & confirming to IS 15622-2006 (Group BIa) of
approved make, shade & pattern for flooring in required position laid on bed of 1:4 C.M.
including neat cement float, filling joints, curing & cleaning etc. complete. - Flooring
(For Ground Floor) (using ARTIFICIAL SAND).

Completed Item Rate as per SSR 2021-22 I/P 33.40/159 1155.00


Deduct 2.0% for Labour aminities & Cess (-2.0 / 100 * 1155.00) = -23.10
============
1131.90
Add 10.00% of Rs. 1131.90 For Hilly/Inacce. Area On DSR Rate 113.19
============
1245.09
Total Additional Charges 32.77
Add for Cement for 5.000 KM
( 148.81 - 0.00) = 148.81 * 0.010000 = 1.49
Add for Artificial Sand for 15.000 KM
( 355.50 - 0.00) = 355.50 * 0.017000 = 6.04
Add for Flooring Tiles for 15.000 KM
( 25.24 - 0.00) = 25.24 * 1.000000 = 25.24
==========
32.77
============
1277.86
Add Back 2.0% for Labour aminities & Cess (2.0 / 100 * 1155.00) = 23.10
============
1300.96
Total Rate Rs. 1,300.95
Per Square Metre
============

SIS-ETM/1481014_€ƒ‡¢£µ4.6.6
R.A. NO : 2
Providing internal C.P. 20 mm thick in single coat in C.M. 1:4 without neeru finish to
concrete, brick surface, in all positions. complete. (For Ground Floor) (using ARTIFICIAL
SAND).

Completed Item Rate as per SSR 2021-22 I/P 32.07/153 366.00


Deduct 2.0% for Labour aminities & Cess (-2.0 / 100 * 366.00) = -7.32
============
358.68
Add 10.00% of Rs. 358.68 For Hilly/Inacce. Area On DSR Rate 35.87
============
394.55
Total Additional Charges 10.15
Add for Cement for 5.000 KM
( 148.81 - 0.00) = 148.81 * 0.008500 = 1.26
Add for Artificial Sand for 15.000 KM
( 355.50 - 0.00) = 355.50 * 0.025000 = 8.89
==========
10.15
============
404.70
Add Back 2.0% for Labour aminities & Cess (2.0 / 100 * 366.00) = 7.32
============
412.02
Total Rate Rs. 412.00
Per Square Metre
============
R.A. NO : 3
Providing IInd class B.B. masonry with conventional / I.S. type bricks in C.M. 1:6
superstructure including striking joints, racking out joints, watering & scaffolding etc.
complete. (For Ground Floor) (using ARTIFICIAL SAND).

Completed Item Rate as per SSR 2021-22 I/P 27.05/144 7570.00


Deduct 2.0% for Labour aminities & Cess (-2.0 / 100 * 7570.00) = -151.40
============
7418.60
Add 10.00% of Rs. 7418.60 For Hilly/Inacce. Area On DSR Rate 741.86
============
8160.46
Total Additional Charges 353.17
Add for Cement for 5.000 KM
( 148.81 - 0.00) = 148.81 * 0.079000 = 11.76
Add for Artificial Sand for 15.000 KM
( 355.50 - 0.00) = 355.50 * 0.320000 = 113.76
Add for Bricks for 5.000 KM
( 0.47926 - 0.00000) = 0.47926 *475.000000 = 227.65
==========
353.17
============
8513.63
Add Back 2.0% for Labour aminities & Cess (2.0 / 100 * 7570.00) = 151.40
============
8665.03
Total Rate Rs. 8,665.05
Per Cubic Metre
============

Junior/Sectional Engineer Deputy Engineer (Works)


Panchayat Samiti, Karveer Panchayat Samiti, Karveer
Estimate No : 001952
SIS-ETM/1481014_€ƒ‡¢£µ4.6.6
Zilla Parishad, Kolhapur
Panchayat Samiti, Karveer

Name of Work
Providing
: special repair work of
toielt for anganwadi Gokul Shirgaon
Tal-Karveer Dist-Kolhapur (15 TH
FC)
Estimated Cost Rs. 60,000.00

SIS-ETM/1481014_€ƒ‡¢£µ4.6.6
Zilla Parishad, Kolhapur Panchayat Samiti, Karveer

Name of Work : Providing special repair work of toielt for


anganwadi Gokul Shirgaon Tal-Karveer Dist-Kolhapur
(15 TH FC)
L A B O U R C O M P O N E N T
==========================================================================================
Item Description Quantity Labour Labour
No of Item Rate Component
==========================================================================================

1 P/L vitrified mirror / glossy finish tiles 590 to 31.860 257.00 8188.02
605 X 590 to 605 X 8 to 10 mm th. - Flooring (For Sq.M.
Ground Floor) (using ART. SAND).
2 Internal C.P. 20 mm th single coat in C.M. 1:4. 8.460 238.00 2013.48
(For Ground Floor) (using ART. SAND). Sq.M.
3 IInd class B.B. masonry in C.M. 1:6 0.970 1609.00 1560.73
superstructure. (For Ground Floor) (using ART. Cu.M.
SAND).
=================
Total Labour Component 11,762.23
==========================================================================================
TOTAL LABOUR COMPONENT OF THE ESTIMATE 11,762.23
==========================================================================================

Estimate No : 001952
SIS-ETM/1481014_€ƒ‡¢£µ4.6.6