Analyse & reconcile price difference in the stock. & removal of this
2
(i.e. Rs. 8.0 lacs excess valuation during last month closing)
Separate Discusstion on "SFG Cost" with Mawai & HSL Team (PP, CO, FI)
Other costs are matching with actual costing & FI
Managed through KP26 once in a month for first 6 months for ease of
operations BDC required
To be covered in ACDOCA
Separate discussion for Routing & Object depandencies to be checked
through PP (ANIL Mawai)
1. Discussion with PP Team (Anil & Satish) for the Action plan
Suggestion:-
1.Separate cost center is required for Adjusting Gaps of physical v/s SAP
inventory
2. Excess material will be adjusted in parts on monthly basis
1.Contribution per hour will be calculated from ACDOCA table & PPCO Table
2.Contrbution value will be calculated from ACDOCA
Mawai to revert post internal discussion with CO consultant