Plant start-up Pre-Checklist Page 1

SECTION: GRINDING Date: __________

INSPECTED BY: SHIFT: __________


ENGINEER: (name and signature) SECTION INCHARGE: H.O.D:

EQUIPMENT’S OIL GREASE COMMENTS / REMARKS


LEVEL LEVEL
Y = Up to standard (adequate), N = Below standard (action required), NA =
Not Applicable
1. ROLLER PRESS HYDRAULIC SYSTEM(521HY110)

2. ROLLER PRESS BEARING LUBE(521LQ120)

3. ROLLER PRESS GEAR BOX

4. BALL MILL TRUNION INLET

5. BALL MIL TRUNION OUTLET

6. BALL MILL MAIN DRIVE GEAR BOX(531MD140)

7. BALL MILL GIRTH GEAR GREASE BARREL

8. SEPERATOR DRIVE GEAR BOX(521MD302)

9. SEPERATOR GREASE BOX

10. RC FAN D.E BEARING

11. RC FAN N.D.E BEARING

Actions: (include person responsible and target completion date)

Other Comments: