Project Information
The necessary machines, equipment’s, tools, materials services, manual and information are given.
There for a level three certification is a perquisite Total Time allotted 4:30hours.
Another engine ready for your final check and release the documents are already on your table for your signature.
You also have one concern, one disassembled engine is still on the work bench for a Week and now you are already 2day
behind the schedule .because the delivered overhauling Gasket is not according to the engine specifications.
As the section head your appropriate section is necessary in order to accuracy above mentioned work shop situation
1
WORKSHEET A
ACTION PLAN
Actions to be done Person Responsible Remark
(According to your priority)
Perform a final check & make Mechanics X
ready the vehicle for delivery/
/releasing /by putting ur’
signature.
Reassembling the engine by Mechanics Y
using appropriate engine gasket
according to specification.
Install the engine to the vehicle Mechanics Z
& make final check.
2
Assessment work sheet - B
Project title 2: carry out engine inspection diagnosis - Diesel (none turbo
Charged). Prepare job order and coast estimation
Time allotted: 1:30 hour
Situation: Car A has a diesel engine and the complain noted and the stop
1. Smoke is coming out of the engine compartment through the
Manifold to Tailpipe connection.
2. Abnormal whizzing noise in the engine
3. Oil leak is observed on the side of the block just below the cylinder
You are going to verify and recommend corrections on the above competency
You are also to perform trouble shooting and fault finding to check it on are
working properly.
List down the engine systems you diagnose on the worksheet provide
together with your finding & possible corrections.
3
WORKSHEET B1
INSPECTION AND DIAGNOISISE WORK SHEET
Name of
component /parts inspected Observation /findings Recommendation/
and diagnose Correction
Manifold to tail pipe Damaged manifold to tail Replace the bolt
connection bolt pipe connection bolt with new
according to
specification
Manifold to tail pipe gasket Damaged gasket Replace the
gasket with
new according
to specification
Crankshaft thrust clearance Excessively wear thrust Replace thrust
washer washer with new
according to
specification
Crankshaft front seal Damaged crankshaft front Replace the
seal seal with new
according to
specification
Prepare a job order and cost estimation on the above car (project B) Use the Forbelow
4
WORKSHEET B2
Ones the trouble is identified and corrected the check engine lamp should stop
6
Name of Observational Recommendation/
Systems/components/parts findings Remark
Checked and diagnosed
--D-- 6. Which of the the following is not future of air suspension on system
8
A. self-damping B. Improve Ride Comfort and Greater Satisfice of the load
--C-- 14. Indicate how much income should be received from specific operations of
activities.
9
A. Complete B. brood c. simple D. Wide
C. immobilization D. windows
--D-- 23. In automatic transmission the shifting range is according to the shift
10
A. P-parking B. R-reverse C. N-neutral D. A-automatic
--B-- 26. Conducting air suspension system balance adjustment primarily deals With.
---- 29. Which is not feature the data bus transmission in motor vehicle?
11
--D-- 31. Electronic control of automatic gear selection is depends on except
A. Engine torque B. throttle valve or air mass C. vehicle road speed D. None
--B-- 34. Immobilizer is designed to prevent vehicle theft by disabling the engine, mostly
found on.
A. Knock sensor B. steering sensor C. air flow sensor D. coolant temp sensor
--C-- 38. The following is the most impact in any work place activity to create a good
12
B. Adapt ……?
C. Adapts existing mechanical system
D. Demanding or modifying electro mechanical system
A B
13
---n--1.Model of product A. hand sign
---c--2.Customer satisfaction B. liquid and gas
---p--3.Plan and schedule work activity C. time management strategy
---q--4.Implementation work plan D. quality product and service
---m--5.Clean up E. Power Transmission through cable
---l-- 6.Diagnosis of automotive vehicle F. visual (physical) inspection
---h-- 7.New technology G. Power and energy
---i-- 8.Feedback H. Upgrade technology skill
---f-- 9.Quality check I. Survey questioner interview & meting
---g--10.Resource J. transmission
---c--11.Develop effective work habit K. power transmission through gear shift
---e--12.Electrical L. Scan tool
---k--13.Mechanical M. work station read out next
---b--14.Fluid power N. proto type
---a--15.Communication include O. work method practice & activity
P. Resources are allocated as pair
Requirement activity.
Q . cover budget operation
R. plan
14
A B
---------1. Temperature sensor actually A. diode
---------2. A faulty electrical connection B. detonation sensor
---------3. Directly measure engine load C. transistor
---------4. Interval of time each injection D. refrigerant
---------5. It used a piezoelectric crystal E. inbox
---------6. One way check valve for electric current F. controlling
---------7. Female connector G. observation /oral
---------8. Base, emitter & collector H. BVI symbol
---------9. Air conditioning media I. strategic plan
--------10. Brake system J. alarm
--------11. Male connector K. retarder
--------12. Brake switch & wheel speed sensor L. thermistor
--------13. Security component M. 2 illustration
--------14. Wire to wire connector symbol N. higher than normal resistance
--------15. Quantities of materials are found O. 1 illustration
--------16. Method of assessment P. MAP sensor
--------17. Cover long term operation Q. input for ABS
R. pulse width
Oral question
SECURITY
QUALITU CONTROL
FINACE
RECEPTION
DELIEVERY /CUSTOMER/
2 . traction control will intervene to maintain stability of the vehicles and the
3 . which of the following is not included in the plan of electrical section head
A . it was wondering if you could do the job B . would you mind giving me a hand
C . would you like to attend the conference D . please have this box deliver
7 . desirable treat that will help the worker to be successful in the job
8 . when you encounter a difficult customer in a work shop the following are the
appropriate thing to do except one
C . send them out if they don’t listen to you D . keep the friendly face
9 . the three basic taste an automotive technician should be before confirm needed
A . the system will go in to back up mode B . the engine will not run
18
13 . during evaluating worker performance as a work shop manager
B . you should gather and use all the information chat you have recorded about
The worker
14 . objective
17 . one of the following cannot be feedback in planning and organizing work activity
19
B . colleagues and specialist resource managers D . A and B
19 . Contingency plans
service performance
23 . one of the following information is not needed to estimate the service job coast
25 . the people you deal with either face to face or over the telephone who buy
Match column B to A
A B
Problems, locates, isolate and perform activity P . kick down switch relay
C . send them out if they don’t listen to you D . keep a friendly face
3 . one of the list is not appropriate in dealing with some one who is trying
C . tell your superior that you have a problem and someone is causing trouble
A . learn to work well with other and do your own share of the work
5 . A desirable trait that will help the worker to be successful in the job
7 . A skill is ;-
C . potentiometer D . thermistor
for purchase ?
15 . you are given that, intake valve open 20 in exhaust stroke and close 30 in
For how much degree of crankshaft do intake and exhaust valve stay open
Respectively ?
The rotary injection pump located at the left hand side of the engine looking
From the front of the engine ( pulley side ). The injection pump and engine
25
Rotations are clockwise looking from the front on timing check he found that
A . Turning the pump’s housing toward the engine block until the timing
B . Turning the pump’s housing away from the engine block until the timing
Match column B to A
A B
3 . damps engine sound and has catalytic convertor C . used to set dynamic timing
P . thermistor
S . NOx
Turn signal lens, front wind shield mirror front bumper are broken
27
Calculates the coast and show the net profile of the component
= 16330
Labor coast
Task 2 ;- assume that customer bring his car which is doesn’t have air conditioning
Show the steps from receiving customer car up to delivering the car
28
Customer request
Customer needs air conditioning on his car
Drive the car to technical adviser technician data take that is possible to fays air
Conditioning
Yes
No
Company
Company manager port manager
29
Service manager part compactor
Reception
Service director
Service adviser
Shops Forman