Professional Documents
Culture Documents
1. Data Umum
- Nama Jembatan = JEMBATAN S. FIANE
- Nama Paket = PERENCANAAN PEMBANGUNAN JEMBATAN WILAYAH II
- Lokasi = KABUPATEN MAIBRAT KM. 162+500
- Standar Acuan = Peraturan Beton Bertulang Indonesia
Peraturan Pembebanan Indonesia
Bridge Management System
- Super elevasi = 2 %
- Grade memanjang = 0 %
- Pembebanan = BM-100
a1 = 1.500 m a3
a2 = 0.850 m a1 a4 a5 a6
a2
a3 = 0.150 m
k1 1 a
a4 = 0.350 m
k2 s = Plat injak h1
a5 = 0.600 m
b
a6 = 0.300 m k3
2 h2
a7 = 0.500 m c d h3
ej f h4
k4 3 7
h1 = 0.750 m
a7
h2 = 0.300 m
4
h3 = 0.300 m
h4 = 0.000 m k5 h5
g
h5 = 0.000 m
h6 = 0.000 m
h7 = 0.700 m
Pot. 3 - 3
H = 2.050 m k6 5 h6
6 h j
k1 = 0.400 m k h7
k2 = 0.250 m Pot. b - b
k3 = 0.700 m O
b1 b2 b3
k4 = 0.000 m
k5 = 0.000 m B
k6 = 0.000 m hs
k7 = 0.700 m
t = 0.250 m (tebal wing wall)
Lebar Timb.Pilihan (Ltp) bs Ds bs
Ltp = 9.400 m
a1 a2 a3 a4 a5
L1
L = 9.900 m
b1 = 1.350 m
b2 = 0.600 m
b3 = 1.350 m
Ds
B = 3.300 m
Df = 1.000 m
L2 L
Ds
Ds = 3.000 m
bs = 0.150 m
L1 = 0.975 m
L2 = 1.950 m
t L1
B. PERHITUNGAN BEBAN ( GAYA )
1. Abutmen & Dinding Sayap
faktor Lebar Panjang Tinggi Berat Isi Berat
No. X(m) Y(m) Mx (tm) My (tm)
Pengali (m) (m) (m) ( ton/m3) (ton)
a 1.00 x 0.35 x 9.90 x 0.65 x 2.40 = 5.41 1.18 1.73 6.35 9.32
b 1.00 x 0.50 x 9.90 x 0.70 x 2.40 = 8.32 1.10 1.05 9.15 8.73
c 1.00 x 0.60 x 9.90 x 0.60 x 2.40 = 8.55 1.65 1.00 14.11 8.55
d 1.00 x 0.30 x 9.90 x 0.30 x 2.40 = 2.14 2.10 0.85 4.49 1.82
e 0.50 x 0.50 x 9.90 x 0.00 x 2.40 = 0.00 1.18 0.70 0.00 0.00
f 0.50 x 0.30 x 9.90 x 0.00 x 2.40 = 0.00 2.05 0.70 0.00 0.00
g 1.00 x 0.60 x 9.90 x 0.00 x 2.40 = 0.00 1.65 0.70 0.00 0.00
h 0.50 x 1.35 x 9.90 x 0.00 x 2.40 = 0.00 0.90 0.70 0.00 0.00
j 0.50 x 1.35 x 9.90 x 0.00 x 2.40 = 0.00 2.40 0.70 0.00 0.00
k 1.00 x 3.30 9.90 x 0.70 x 2.40 = 54.89 1.65 0.35 90.56 19.21
1 1.00 x 0.65 x 0.25 x 2.50 x 2.40 = 0.98 (0.25) 1.73 (0.24) 1.68
2 1.00 x 0.70 x 0.25 x 2.35 x 2.40 = 0.99 (0.33) 1.05 (0.32) 1.04
3 1.00 x 0.00 x 0.25 x 2.35 x 2.40 = 0.00 (0.33) 0.70 0.00 0.00
4 1.00 x 0.00 x 0.25 x 2.85 x 2.40 = 0.00 (0.08) 0.70 0.00 0.00
5 0.50 x 0.00 x 0.25 x 1.50 x 2.40 = 0.00 (0.50) 0.70 0.00 0.00
6 0.50 x 0.00 x 0.25 x 1.35 x 2.40 = 0.00 0.45 0.70 0.00 0.00
7 0.50 x 0.00 x 0.25 x 0.70 x 2.40 = 0.00 1.02 0.70 0.00 0.00
S 1.00 x 0.25 x 7.00 x 2.50 x 2.40 = 10.50 (0.25) 1.53 (2.63) 16.01
1' 1.00 x 0.65 x 0.25 x 2.50 x 2.40 = 0.98 (0.25) 1.73 (0.24) 1.68
2' 1.00 x 0.70 x 0.25 x 2.35 x 2.40 = 0.99 (0.33) 1.05 (0.32) 1.04
3' 1.00 x 0.00 x 0.25 x 2.35 x 2.40 = 0.00 (0.33) 0.70 0.00 0.00
4' 1.00 x 0.00 x 0.25 x 2.85 x 2.40 = 0.00 (0.08) 0.70 0.00 0.00
5' 0.50 x 0.00 x 0.25 x 1.50 x 2.40 = 0.00 (0.50) 0.70 0.00 0.00
6' 0.50 x 0.00 x 0.25 x 1.35 x 2.40 = 0.00 0.45 0.70 0.00 0.00
7' 0.50 x 0.00 x 0.25 x 0.70 x 2.40 = 0.00 1.02 0.70 0.00 0.00
S = pelat injak
2 1.00 x 0.85 x 9.40 x 0.70 x 1.60 = 8.95 0.43 1.05 3.80 9.40
3 1.00 x 0.85 x 9.40 x 0.00 x 1.60 = 0.00 0.43 0.70 0.00 0.00
4 1.00 x 1.35 x 9.40 x 0.00 x 1.60 = 0.00 0.68 0.70 0.00 0.00
5
6 0.50 x 1.35 9.40 x 0.00 x 1.60 = 0.00 0.45 0.70 0.00 0.00
7 0.50 x 0.50 x 9.40 x 0.00 x 1.60 = 0.00 1.02 0.70 0.00 0.00
G gp, Hg bm
Pq h
H
V tnh Hg abt
Pq v
V abt
Pag Pa h
Pa v
b1 b2 b3
dimana,
V bm = Beban mati Bangunan atas G rem = Gaya rem
V bh = Beban Hidup G gp = Gaya gesek Permukaan
V abt = Berat Sendiri Abutment Pa h = Tekanan Tanah aktif horizontal
V tnh = Berat Timb. Tanah diatas Footing Pq h = Tekanan Beban merata (q) horizontal
Pa v = Tekanan Tanah Aktif vertikal Hg bm = Beban Gempa akibat Beban Mati
Pq v = Tekanan beban merata (q) di atas tanah Hg abt = Beban Gempa akibat Beban Abutment
Pg = Beban Gempa akibat Tekanan Tanah Aktif
1. Beban Vertikal
a. Beban Mati
a.1 Struktur Atas
b Beban Hidup
q = 2.2 ton/m1 per jalur, lebar jalur = 2.75 m, maka q = 2.2 / 2.75 = 0.80 t/m2
L < 30 m
q = 8.0 Kpa = 0.80 Ton/m2 1 Kpa = 0.102 ton/m2
L > 30 m
q = 8.0 ( 0.5 + 15/L ) Kpa = 12.00 Kpa = 1.22 ton/m2
c. Beban ( berat ) tanah di atas footing (dibelakang abutment) V tnh = 8.95 Ton
2. Beban Horizontal
Beban Lalulintas ( q )
(diasumsikan ekivalen dengan 0,6 meter tanah timbunan)
H Pa
q = 0.96 Ton/M2
δ
H/3
Ka.γt.H
cos 2 ( )
Ka 2
sin( ) sin( )
cos 2 cos( ) 1
cos( ) cos( )
dimana,
β = 0 ⁰ Sudut kemiringan dinding abutment
ω = 0 ⁰ Sudut kemiringan timbunan tanah dibelakang abutment
δ = 35 ⁰ Sudut gesek dinding abutment - tanah (tidak terjadi Gempa)
δ = 0 ⁰ Sudut gesek dinding abutment - tanah (saat terjadi Gempa)
cos 2 ( )
K aG 2
sin( ) sin( )
cos 2 cos( ) 1
cos( ) cos( )
dimana,
β = 0 ⁰ Sudut kemiringan dinding abutment
ω = 0 ⁰ Sudut kemiringan timbunan tanah dibelakang abutment
δ = 0 ⁰ Sudut gesek dinding abutment - tanah (saat terjadi Gempa)
θ = Tan⁻¹. Kh ⁰
Kh = Kr . f . p . b
Tg = 0.01439 detik
sehingga,
0.15
0.13 Kh = 0.22
0.10
θ = Tan⁻¹. Kh ⁰
ZONA 1 = 12.40
0.05
0.00
0.0 0.4 0.8 1.2 1.6 2.0 2.4 2.8
Waktu Getar “T” (detik)
Sehingga, K aG = 0.40111
Jadi : P ag = 0,5. (Kag - Ka). γt. H². Lebar Abutment
= 1.87816 Ton
3.3 Tekanan tanah Akibat Beban Merata ( P q ), bekerja pada 1/2 H dari dasar abutment
P qh = Pq Cos δ
3.98544 Ton
P qv = Pq Sin δ
2.791 Ton
4. Beban Gempa
Hg.bm = Kh. Ma
= 21.2216 Ton
SFguling
M R
∑ MR = Jumlah Moment dengan titik pusat di "O" Yang Mencegah
Struktur Terguling
M O ∑ Mo = Jumlah Moment dengan titik pusat di "O" Yang Menyebabkan
Struktur Terguling
V tan 2
BLc2 Pp
B
L
=
=
3.30
9.90
Lebar Abutment (Footing) ( m )
Panjang Abutmen (Footing) ( m )
SFgeser
Ph c₂ = 0.24 Kohesi Tanah Dasar ( 0.4 C) ) ( ton/M2 )
Pp = 0.00 Tekanan Tanah Pasif ( Ton )
Ph = 10.79 Jumlah Gaya Yang Menyebabkan
Struktur Bergeser ( Ton )
SF geser = 7.1 ≥ 2.2 OK…!!
b. Tekanan ke Tanah
mak
q min
V 1 6 eks q maks = 6.069 Ton/M2
SFguling
M R
∑ MR = Jumlah Moment dengan titik pusat di "O" Yang Mencegah
Struktur Terguling
M O ∑ Mo = Jumlah Moment dengan titik pusat di "O" Yang Menyebabkan
Struktur Terguling
V tan 2
BLc2 Pp
B
L
=
=
3.30
9.90
Lebar Abutment (Footing) ( m )
Panjang Abutmen (Footing) ( m )
SFgeser
Ph c₂ = 0.28 Kohesi Tanah Dasar ( 0.4 C) ) ( ton/M2 )
Pp = 0.00 Tekanan Tanah Pasif ( Ton )
Ph = 50.26 Jumlah Gaya Yang Menyebabkan
Struktur Bergeser ( Ton )
SF geser = 4.0 ≥ 2.2 OK…!!
2.3 Daya Dukung Ijin Tanah Dasar
b. Tekanan ke Tanah
mak
q min
V 1 6 eks q maks = 10.361 Ton/M2
SFguling
M R
∑ MR = Jumlah Moment dengan titik pusat di "O" Yang Mencegah
Struktur Terguling
M O ∑ Mo = Jumlah Moment dengan titik pusat di "O" Yang Menyebabkan
Struktur Terguling
V tan 2
BLc2 Pp
B
L
=
=
3.30
9.90
Lebar Abutment (Footing) ( m )
Panjang Abutmen (Footing) ( m )
SFgeser
Ph c₂ = 0.28 Kohesi Tanah Dasar ( 0.4 C) ) ( ton/M2 )
Pp = 0.00 Tekanan Tanah Pasif ( Ton )
Ph = 52.74 Jumlah Gaya Yang Menyebabkan
Struktur Bergeser ( Ton )
SF geser = 2.72 ≥ 2.2 OK…!!
b. Tekanan ke Tanah
mak
q min
V 1 6 eks q maks = 6.121 Ton/M2
Vo = 307,066.76 KG Vo = 199,133.80 KG
Ho = 50,263.19 KG Ho = 52,738.43 KG
e = 0.06 M e = 0.00 M
Mo = Vo x e = 17,291.16 KG.M Mo = Vo x e = 455.79 KG.M
SFguling
M R
∑ MR = Jumlah Moment dengan titik pusat di "O" Yang Mencegah
Struktur Terguling
M O ∑ Mo = Jumlah Moment dengan titik pusat di "O" Yang Menyebabkan
Struktur Terguling
V tan 2
BLc2 Pp
B
L
=
=
3.30
9.90
Lebar Abutment (Footing) ( m )
Panjang Abutmen (Footing) ( m )
SFgeser
Ph c₂ = 0.28 Kohesi Tanah Dasar ( 0.4 C) ) ( ton/M2 )
Pp = 0.00 Tekanan Tanah Pasif ( Ton )
Ph = 13.58 Jumlah Gaya Yang Menyebabkan
Struktur Bergeser ( Ton )
SF geser = 7.6 ≥ 2.2 OK !
b. Tekanan ke Tanah
mak
q min
V 1 6 eks q maks = 6.887 Ton/M2
SFguling
M R
∑ MR = Jumlah Moment dengan titik pusat di "O" Yang Mencegah
Struktur Terguling
M O ∑ Mo = Jumlah Moment dengan titik pusat di "O" Yang Menyebabkan
Struktur Terguling
V tan 2
BLc2 Pp
B
L
=
=
3.30
9.90
Lebar Abutment (Footing) ( m )
Panjang Abutmen (Footing) ( m )
SFgeser
Ph c₂ = 0.28 Kohesi Tanah Dasar ( 0.4 C) ) ( ton/M2 )
Pp = 0.00 Tekanan Tanah Pasif ( Ton )
Ph = 74.89 Jumlah Gaya Yang Menyebabkan
Struktur Bergeser ( Ton )
SF geser = 4.1 ≥ 2.2 OK…!!
2.3 Daya Dukung Ijin Tanah Dasar
b. Tekanan ke Tanah
mak
q min
V 1 6 eks q maks = 21.188 Ton/M2
SFguling
M R
∑ MR = Jumlah Moment dengan titik pusat di "O" Yang Mencegah
Struktur Terguling
M O ∑ Mo = Jumlah Moment dengan titik pusat di "O" Yang Menyebabkan
Struktur Terguling
V tan 2
BLc2 Pp
B
L
=
=
3.30
9.90
Lebar Abutment (Footing) ( m )
Panjang Abutmen (Footing) ( m )
SFgeser
Ph c₂ = 0.28 Kohesi Tanah Dasar ( 0.4 C) ) ( ton/M2 )
Pp = 0.00 Tekanan Tanah Pasif ( Ton )
Ph = 52.74 Jumlah Gaya Yang Menyebabkan
Struktur Bergeser ( Ton )
SF geser = 2.72 ≥ 2.2 OK…!!
mak
q min
V 1 6 eks q maks = 8.549 Ton/M2
Vo = Vo 436,338.21 KG Vo = 199,133.80 KG
Ho = Mo74,893.79 KG Ho = 52,738.43 KG
e = Ho
-0.32 M e = -0.22 M
Mo = Vo x e = -140,728.79 KG.M Mo = Vo x e = -44,089.69 KG.M
a1 a2 a3 a4 a5 a6
h1
k1 1
a
k2 h2
Pot. 2 - 2
b Pot. 1 - 1
b Pot. 1 - 1
Pot. 2
F. PENULANGAN ABUTMEN
k3 2
h3
c
k4 d e
4 h4
3
k5 5 f h5
Pot. 3 - 3
k6 6 7 g h h6
Pot. 4 - 4
a7 j h7
k7
Df
b1 b2 b3
bs1 Ds bs
B
6 As = rxbxd
5. Tulangan Plat Injak
6. Tulangan Sumuran
1. TULANGAN BACK-WALL ( POT. 1 - 1 )
1.1 KONDISI NORMAL ( BEBAN MATI + BEBAN HIDUP )
Gaya-gaya dihitung untuk lebar abutment = 1,00 meter
∑ M di As Back-Wall pada Pot. 1 - 1
Beban Batas (ULS)
No Uraian Beban Notasi Vertikal Horizontal
X Y Vu.X Hu.Y
Vu (Ton) Hu ( Ton ) (m) (m) (Ton.M) (Ton.M)
A. Bangunan Atas
Beban Mati
Gaya Gesek perletakan
Beban Hidup Traffic ( KEL ) 7.78 0.25 1.94
Gaya Rem 5.05 1.05 5.30
B. Bangunan Bawah
Beban Mati 0.55 0.08 0.04
C. Tekanan Tanah
Akibat Beban Merata
arah Horizontal 0.08 0.53 0.04
arah Vertikal 0.06 -0.50 -0.03
Tek. Tanah Aktif
arah Horizontal 0.07 0.35 0.02
arah Vertikal 0.05 -0.50 -0.02
Beban Tnh diatas footing
arah Vertikal
Kondisi
URAIAN Satuan
Normal Gempa
* diasumsikan sebagai kolom pendek dengan penampang sbb :
h = 350 350 mm
b = ( ditinjau 1 meter lebar abutment ) 1,000 1,000 mm
d' = Lebar selimut beton ( direncanakan ) 50 50 mm
d = h - d' 300 300 mm
* data Materian / Bahan
Berton K - 250
Fc' = Kuat Tekan Beton 20.8 20.8 Mpa
Ec = 4700 √ Fc' ( dalam satuan Mpa ) 21,409.5 21,409.5 Mpa
Besi Tulangan U - 32
Fy = Kuat tekan/tarik Tulangan 320 320 Mpa
Es = Modulus Elastisitas Baja Tulangan 200,000 200,000 Mpa
* data Beban
Mu = Momen Batas Yang bekerja 73.03 1.189 KN.M
Pu = Beban Vertikal Yang bekerja 84.30 5.460 KN
e = eksentrisitas 866 218 mm
* dicoba menggunakan tulangan min. rmin = 0.0044 As = As'
sehingga :
r = As / ( b.d ) 0.0044 0.0044
As = rxbxd 1,313 1,313 mm2
digunakan tulangan : ( satu sisi )
As = 6 Ø 19 → As = 1,700 1,700 mm2
jarak tulangan = 200 200 mm
r = As / ( b.d ) 0.0057 0.0057
Pu = Ø Pn 127 1,016 KN
C. Tekanan Tanah
Akibat Beban Merata
arah Horizontal 0.27 1.03 0.27
arah Vertikal 0.19 -0.45 -0.08
Tek. Tanah Aktif
arah Horizontal 0.30 0.68 0.20
arah Vertikal 0.21 -0.45 -0.09
Beban Tnh diatas footing
arah Vertikal
C. Tekanan Tanah
Tek. Tanah Aktif
arah Horizontal 0.40 0.68 0.27
arah Vertikal
Tek. Tnh Aktif (gempa)
arah Horizontal 0.19 1.37 0.26
Beban Tnh diatas footing
arah Vertikal
Kondisi
URAIAN Satuan
Normal Gempa
* diasumsikan sebagai BALOK KANTILEVER penampang sbb :
h = 600 600 mm
b = ( ditinjau 1 meter lebar abutment ) 1,000 1,000 mm
d' = Lebar selimut beton ( direncanakan ) 100 100 mm
d = h - d' 500 500 mm
* data Materian / Bahan
Berton K - 300
Fc' = Kuat Tekan Beton 24.9 24.9 Mpa
Ec = 4700 √ Fc' ( dalam satuan Mpa ) 23,453.0 23,453.0 Mpa
Besi Tulangan U - 32
Fy = Kuat tekan/tarik Tulangan 320 320 Mpa
Es = Modulus Elastisitas Baja Tulangan 200,000 200,000 Mpa
* data Beban
Mu = Momen Batas Yang bekerja 77.61 6.85 KN.M
Pu = Beban Vertikal Yang bekerja 95.58 13.86 KN
Mn = Mu/Ø Ø = 0.8 ( sengkang ) 97.02 8.56 KN.M
rmin = 0.0044 0.0044
rmax = 0.0229 0.0229
* keadaan seimbang :
ab = 1 x Xb
= (0.003 x d) / (0.003 + Fy / Es) 326 326 mm
amax = 0.75 x ab 245 245 mm
C. Tekanan Tanah
Tek. Tanah Aktif 0.395 0.85 0.34
Tek. Tnh Aktif (gempa) 0.190 1.70 0.32
Kondisi
URAIAN Satuan
Normal Gempa
* diasumsikan sebagai kolom pendek dengan penampang sbb :
h = 600 600 mm
b = ( ditinjau 1 meter lebar abutment ) 1,000 1,000 mm
d' = Lebar selimut beton ( direncanakan ) 100 100 mm
d = h - d' 500 500 mm
* data Materian / Bahan
Berton K - 250
Fc' = Kuat Tekan Beton 20.8 20.8 Mpa
Ec = 4700 √ Fc' ( dalam satuan Mpa ) 21,409.5 21,409.5 Mpa
Besi Tulangan U - 32
Fy = Kuat tekan/tarik Tulangan 320 320 Mpa
Es = Modulus Elastisitas Baja Tulangan 200,000 200,000 Mpa
* data Beban
Mu = Momen Batas Yang bekerja -62.22 -14.048 KN.M
Pu = Beban Vertikal Yang bekerja 338.43 162.127 KN
e = eksentrisitas -184 -87 mm
* dicoba menggunakan tulangan min. rmin = 0.0044 As = As'
sehingga :
r = As / ( b.d ) 0.0044 0.0044
As = rxbxd 2,188 2,188 mm2
digunakan tulangan : ( satu sisi )
As = 6 Ø 25 → As = 2,944 2,944 mm2
jarak tulangan = 200 200 mm
r = As / ( b.d ) 0.0059 0.0059
Pu = Ø Pn 11,579 9,459 KN
L q
arah - y
L qs2
L1
4. TULANGAN FOOTING qs1 qx
Arah melintang (arah-X) ( Potongan 4 - 4 )
arah -x Ds L3
qs'2
qs'1 qx'
L2
L'3 L'3 Ds
Ds
B
SKETSA PEMBEBANAN
qs1, qs2 =Tegangan Tanah didasar Abutment
Kondisi
URAIAN Satuan
Normal Gempa
* diasumsikan sebagai BALOK penampang sbb :
h = 700 700 mm
b = ( ditinjau 1 meter lebar abutment ) 1,000 1,000 mm
d' = Lebar selimut beton ( direncanakan ) 100 100 mm
d = h - d' 600 600 mm
* data Materian / Bahan
Berton K - 300
Fc' = Kuat Tekan Beton 24.9 24.9 Mpa
Ec = 4700 √ Fc' ( dalam satuan Mpa ) 23,453.0 23,453.0 Mpa
Besi Tulangan U - 32
Fy = Kuat tekan/tarik Tulangan 320 320 Mpa
Es = Modulus Elastisitas Baja Tulangan 200,000 200,000 Mpa
* data Beban
Mu = Momen Batas Yang bekerja 8.21 7.27 KN.M
Vu = Beban Geser 107.21 92.39 KN
Mn = Mu/Ø Ø = 0.8 ( sengkang ) 10.26 9.09 KN.M
rmin = 0.0044 0.0044
rmax = 0.0229 0.0229
* keadaan seimbang :
ab = b1 x Xb
= 0.85 x (0.003 x d) / (0.003 + Fy / Es) 333 333 mm
amax = 0.75 x ab 249 249 mm
2
5. TULANGAN WING WALL
1 KONDISI NORMAL ( BEBAN MATI + BEBAN HIDUP )
Gaya-gaya dihitung untuk panjang wing wall = 1,00 meter b
1.35 m
∑ M di pada as wing-wall
Beban Batas (ULS)
No Uraian Beban Notasi Vertikal Horizontal
X Y Vu.X Hu.Y
Vu (Ton) Hu ( Ton ) (m) (m) (Ton.M) (Ton.M)
A. Bangunan Atas
Beban Mati 1.10 0.00 0.00
B. Tekanan Tanah
Akibat Beban Merata
arah Horizontal 0.68 0.68 0.46
arah Vertikal 0.48 -0.13 -0.06
Tek. Tanah Aktif
arah Horizontal 0.69 0.45 0.31
arah Vertikal 0.48 -0.13 -0.06
Kondisi
URAIAN Satuan
Normal Gempa
* diasumsikan sebagai BALOK dengan penampang sbb :
h = 250 250 mm
b = ( ditinjau 1 meter lebar abutment ) 1,000 1,000 mm
d' = Lebar selimut beton ( direncanakan ) 50 50 mm
d = h - d' 200 200 mm
* data Materian / Bahan
Berton K - 250
Fc' = Kuat Tekan Beton 20.8 20.8 Mpa
Ec = 4700 √ Fc' ( dalam satuan Mpa ) 21,409.5 21,409.5 Mpa
Besi Tulangan U - 24
Fy = Kuat tekan/tarik Tulangan 240 240 Mpa
Es = Modulus Elastisitas Baja Tulangan 200,000 200,000 Mpa
* data Beban
Mu = Momen Batas Yang bekerja 6.51 4.79 KN.M
Pu = Beban Vertikal Yang bekerja 20.58 10.97 KN
Mn = Mu/Ø Ø = 0.8 ( sengkang ) 8.14 5.98 KN.M
rmin = 0.0058 0.0058
rmax = 0.0229 0.0229
* keadaan seimbang :
ab = b1 x Xb
= (0.003 x d) / (0.003 + Fy / Es) 143 143 mm
amax = 0.75 x ab 107 107 mm
P = 10 ton
P = 10 ton
450 450
50 cm 50 cm
25 cm 25 cm
100 cm L = 150
6. TULANGAN PLAT INJAK (FRICTION SLAB)
KONDISI PEMBEBANAN