MATERIAL ASSESSMENT REPORT

MATERIAL ASSESSMENT REPORT


Organization Name MIS Arabia
Type of assessment Material Verification at MIS Arabia
Assessment Team
Mr. Shamshad Ali QA/QC Manager
Mr. Anish Nair QA/QC Engineer
Mr. Afzal QA/QC Engineer
Mr. Faraz Khan QA/QC Engineer
Date of assessment 17/01/2022 & 19/01/2022
Site location Industrial area Jubail
Scope Material verification as per ASME/ASTM
requirements

Material MRV # Dimensions Remarks


1. Pipes received in the
year 2016/2017/2019
OD – 60.30mm 2. Found rusted all over
MRV-1014886-
Length – 7000mm the surface
001-01
Thickness – 8.82mm 3. Original manufacturer
trade mark/material
specification
markings are not
OD – 323.90mm available.
Pipes MRV-1016534-
Length – 9010mm 4. Only MRV Traceability
002-01
Thickness – 25.48mm handwritten with
marker.
5. Certified true copy of
MTC evident.
OD – 323mm 6. QC stamp and signature
MRV-1014732-
Length – 8070mm evident on the MTC.
006-01
Thickness – 12mm

MRV-1012011-001-01 Structural material like


(H Beam) square tubes, H beams,
round, etc. Similar MRV
Structural
MRV-1016239-006-01 traceability is followed. No
(Round Bar) Manufacturer tags are
available.
Expertise Contracting Company
Rev. Page
Business Unit Document Ref No.: Effective Date
No. No.
President & CEO Office FM-DIV00-0038 00 19th Nov 2021 2 of 6
MATERIAL ASSESSMENT REPORT

1. Plates received in the


year 2016/2017/2019
2. Found rusted all over
Width – 2000mm the surface.
MRV-1014314-
Length – 12000mm 3. Original manufacturer
001-03
Thickness – 20.80mm trade mark/material
specification markings
hard punched on the full
plates.
Plates 4. In cut pieces heat
Width – 630mm
MRV-1016573- traceability hard
Length – 4320mm
005-02 punched with MRV No.
Thickness – 16.46mm
7. Certified true copy of
MTC evident.
5. QC stamp and signature
MRV-1014556- Width – 3010mm evident on the MTC.
001-02 Length – 3010mm
Thickness – 12.66mm

1. Inspected flange is
manufactured by KOREA
MRV-1016140-
OD – 89.15, 89.10 FLANGE CO. LTD. This
009-01
Thickness – 6.02,5.99 manufacturer is
(Elbow) blacklisted by
Aramco.
2. Elbow had the original
manufacture trade mark
Flange MRV-1015487- Flange and markings.
& 001-01 Thickness – 13.6 mm 3. Elbow manufacturer
Fittings (Flange) OD – 100.50mm “BENKAN” is approved
as per Aramco AVL.
4. Certified true copy of
Flange MTC evident.
Thickness – 4060mm 5. QC stamp and signature
MRV-1014637-
OD – 380mm evident on the MTC.
008-01
(Flange)
Expertise Contracting Company
Rev. Page
Business Unit Document Ref No.: Effective Date
No. No.
President & CEO Office FM-DIV00-0038 00 19th Nov 2021 3 of 6
MATERIAL ASSESSMENT REPORT

Markings and Traceability –


Materials Photos Remarks
Pipe MRV marking

Pipes

Visual Condition

Full Plate
MRV Marking
(MRV-1014556-001-
02)

Original
Manufacturer
marking.
(MRV-1014314-001-
03)
Only MRV marking.
(MRV-1016573-005-
02)
Cut Plate
Expertise Contracting Company
Rev. Page
Business Unit Document Ref No.: Effective Date
No. No.
President & CEO Office FM-DIV00-0038 00 19th Nov 2021 4 of 6
MATERIAL ASSESSMENT REPORT

Elbow Elbow Heat


traceability and
manufacturer
marking.
(MRV-1016140-009-
01)
Flanges

KOFCO, Korea
Flanges.
(MRV-1015487-001-
01
MRV-1014637-008-
01)

Structure H Beam & Round bar


visual condition,
(MRV-1012011-001-
01
MRV-1
016239-006-01)

• Pipes – are found without original manufacturer traceability and heat


number. Only verified with the MRV number which is hand written.
• Full Plates – sweep-blasting can be done to remove rusted surface.
• Fittings – All the flanges by KOFCO, Korea has to be rejected, as the
manufacturer is blacklisted by Aramco.
• Structural material – No manufacturer tags available. Can be used
based on MRV traceability for structural fabrication.
Expertise Contracting Company
Rev. Page
Business Unit Document Ref No.: Effective Date
No. No.
President & CEO Office FM-DIV00-0038 00 19th Nov 2021 5 of 6
MATERIAL ASSESSMENT REPORT

Requirements for materials as Aramco SAMSS 32-SAMSS-004

Following below are the requirement for plates by Aramco

1. Pipes: (as per 01-SAMSS-43/01-SAMSS-35)


• All pipe materials shall comply form 175 of Aramco inspection requirement.
• Again, as describe in clause 1 there is same testing requirements to be followed for
pipes as well.
• Also, authentication letter is required from manufacturer for pipes which are
purchased by stockiest.
• Again 1/2T is mandatory & transverse testing.
• Post weld heat treatment.

Action required to use Pipe materials


1. We cannot avoid testing of materials.
2. If we want to use these pipes there will lot of testing which will be revealed later on.
3. The offered pipe itself cannot be used in Aramco jobs

Conclusion: Based on Inspection.


1. First of all, pipe material offered to us cannot be used for Aramco jobs as they in full
non-compliance to form 175 of Aramco inspection requirement. First impression is
last impression. If this is the best they have to offer I wonder what will be the worst.
2. Again, cut pipes are very difficult to get them release from Aramco inspector.
3. Manufacture after 5 to 6 years will not give authentication also.
4. Therefore, cut pipes are rejected from our end as there is no marking and it will cost
us further more in testing. And not sure whether we can get the clearance to use
material from client.

2. Plates:
• Different Aramco projects have different requirement such as, Tensile testing &
Impact testing & HIC. These are mainly done by manufacturer while we order
material.
• Tensile & impact are required at 1/2t, stockiest plate does not have these testing.
• Almost all Aramco jobs are sour service, plate need HIC testing.
• Post weld heat treatment & retest of tensile & Impact.

Action required to use Cut & Full Plate:


1. We cannot avoid testing of materials.
2. If we want to use these plates there will lot of testing requirements which
will be revealed later on.

Conclusion: Based on Inspection


1. Since there is no or lack of marking, hereby cut plates are rejected from our side.
2. Full plates can be used but as describe above there will, lot of testing.
3. MIS has transferred marking but internal stamp transfer are not accepted by client
Inspector resulting in rejection of plates.
4. Any way we cannot offer old materials for new projects it is not good for reputation.
Expertise Contracting Company
Rev. Page
Business Unit Document Ref No.: Effective Date
No. No.
President & CEO Office FM-DIV00-0038 00 19th Nov 2021 6 of 6
MATERIAL ASSESSMENT REPORT

3. Flanges & Fittings: (as per 02-SAMSS-11 & 02-SAMSS-005)


• Almost same requirement is required for flanges as well,

Action required to use flanges & fittings.


1. There is no action plan to use these materials, as destructive testing is
impossible.
2. Destructive testing will make them useless.

Conclusion:
1. We cannot use them if the MTC does not meets requirement, we will be help us and
finally they had to be scrap.
2. Also flange offered, the manufacturer of flange is black listed by Aramco. So there is
no way we can use them.
3. Further investigation is needed to segregate Korea flanges and to remove them out
of quotation.

Final Conclusion:
Material can be use or may not be use at all.
It will take at least 10 to 15 years to use these materials, even though we will not be
able to utilize them even 50%.
By this span of time they will be scrap.