cover to protect against weather conditions

and ingress of water (on all sides)

covered with planks


Drawing will not be recalled in case of revisions .

15°
All rights reserved .

protection against
ingress of surface water
ground
level

1)
≥ 2,00

arrangement of joint according


to drawing of joint bay dimensions

inside width of joint bay installation level


> 0,80

ground covered with planks or


concrete layer type C 12/15
Für diese Zeichng. behalten wir uns alle Rechte vor .
Zeichnung wird bei Änderungen nicht eingezogen .

pump sump
for dewatering
1) Reinforcement:
Apart from the reinforcements at the head sides, two displaceable
reinforcements in the working area of the joint bay are allowed.

Ladder or stairs for safe entrance to be provided.


This schematic drawing shows the requirements of nkt cables.
Further technical and safety requirements are to be fulfilled by the civil contractor.
Details concerning jointing works are to be agreed upon with nkt cables.

EHP 9322/2d
Maßst./Scale :
Preparation of Joint Bay 1 : 15 (A4)
Gez./Drawn : 09.10.00 Ah
cables
Gepr./Check.: 03.02.14 HPM
Änder./Rev. : 03.02.14 WE