Professional Documents
Culture Documents
Eim NC III - Compress
Eim NC III - Compress
CONEIM408-0810 1
Electrical Installation & Maintenance NC III
CONEIM408-0810 2
Electrical Installation & Maintenance NC III
Make performance tests to ensure that work conforms to
instructions and job requirements
Record details of fault, possible cause, corrective action and
recommendation
Notify immediate supervisor upon completion of work
Identify potential hazards for prevention and select control
measures in accordance with the work plan and site procedures
Check and tighten connectors, bolts, nuts and screws according
to sizes and torque requirements
Make final check to ensure that work conforms with instructions
and to requirements*
Conduct preliminary checks/tests in line with job requirements
Dispose waste materials and hazardous substances in
accordance with environmental rules and procedures
Clean up and make work area safe in accordance with OSHA
requirements
CONEIM408-0810 3
Electrical Installation & Maintenance NC III