The Ho Chi Minh Green Transport Development Project

Detailed Design Report

APPENDIX 10-5: DESIGN REPORT OF


FOOTBRIDGE NO.6

(IMPROVEMENT FOOTBRIDGE – Km 6+559)

Table of Contents

APPENDIX 10-5: DESIGN REPORT OF FOOTBRIDGE NO.6 ........ 5-1


5.1. INTRODUCTION ........................................................................................................... 5-3

5.2. DESIGN OF STAIRCASE ............................................................................................. 5-4


GEOMETRY OF STRUCTURE ............................................................................ 5-4
STRUCTURAL MODELING & ANALYSIS ........................................................ 5-5
DESIGN OF STAIR PIER ...................................................................................... 5-8
DESIGN OF STAIR BEAM ................................................................................. 5-11
DESIGN OF STAIR SLAB .................................................................................. 5-16
DESIGN OF STAIR PILE .................................................................................... 5-23

Joint Venture of MVA Hong Kong Limited and SYSTRA S.A. Page A5-1
The Ho Chi Minh Green Transport Development Project
Detailed Design Report

List of Figure
Figure 1 - Elevation view Stair ...................................................................................................................... 5-4
Figure 2 – Detail of staircase .......................................................................................................................... 5-5
Figure 3 – Structure detailling ........................................................................................................................ 5-5
Figure 4 - Interaction diagram P-M for Staircase’s Column .......................................................................... 5-8
Figure 5 - Reinforcement Details of Staircase’s Beam ................................................................................. 5-11
Figure 6 - Cross Section & Longitudinal Section of Slab ............................................................................ 5-16
Figure 7 - Cross Section of Staircase’s Pile.................................................................................................. 5-26
Figure 8 - Interaction diagram P-M for Staircase’s Piles ............................................................................. 5-26

List of Table
Table 1 - Loads Combination of Staircase’s Column at Strength Limit State ................................................ 5-6
Table 2 - Loads Combination of Staircase’s Column at Service Limit State ................................................. 5-6
Table 3 - Loads Combination of Staircase’s Beam at Strength & Service Limit State .................................. 5-6
Table 4 - Loads Combination of Staircase’s Slab at Strength & Service Limit State..................................... 5-6
Table 5 - Loads Combination of Staircase’s Piles at Strength Limit State ..................................................... 5-7
Table 6 - Loads Combination of Staircase’s Piles at Service Limit State ...................................................... 5-7
Table 7 - Calculation of Ultimate Shear Capacity of Staircase’s Column...................................................... 5-9
Table 8 - Check Crack Control ability of Staircase’s Column ..................................................................... 5-10
Table 9 - Loads Combination of Staircase’s Beams at Strength & Service Limit State ............................... 5-11
Table 10 - Calculation of Ultimate Moment Capacity of Staircase’s Beam ................................................. 5-12
Table 11 - Calculation of Ultimate Shear Capacity of Staircase’s Beam ..................................................... 5-14
Table 12 - Loads Combination of Staircase’s Slabs at Strength & Service Limit ........................................ 5-16
Table 13 - Calculation of Ultimate Moment Capacity of Staircase’s Slab (Mxx-min) ................................ 5-17
Table 14 - Calculation of Ultimate Moment Capacity of Staircase’s Slab (Mxx-max)................................ 5-19
Table 15 - Calculation of Ultimate Moment Capacity of Staircase’s Slab (Myy-max)................................ 5-21
Table 16 - Calculation of Ultimate Shear Capacity of Staircase’s Piles ....................................................... 5-27
Table 17 - Check Crack Control ability of Staircase’s Piles ........................................................................ 5-28

Joint Venture of MVA Hong Kong Limited and SYSTRA S.A. Page A5-2
The Ho Chi Minh Green Transport Development Project
Detailed Design Report

5.1. INTRODUCTION
The existing footbridge No.06 at Km 6+559 is used to access BRT Station. The works proposed for
this bridge is to construct a new staircase at the intermediate pier of the bridge to access the Station
platform. New roof will be also constructed on the bridge and new staircase at this bridge to
harmonize with the overall architectural concept of BRT project.
This report presents the detail design for the main structures of new staircase. For roof design, refer
to APPENDIX 22. DESIGN REPORT OF ROOF.

Joint Venture of MVA Hong Kong Limited and SYSTRA S.A. Page A5-3