Proyecto Especial de Inversión Pública: Escuelas Bicentenario
Proyecto Especial de Inversión Pública: Escuelas Bicentenario
Escuelas Bicentenario
Classification - Public
Introduction - Bicentennial Schools
• The authority responsible for the delivery of the program is the Special Public Investment
Project Bicentennial Schools, or PEIP-Bicentennial Schools, an autonomous unit of the
Peruvian Ministry of Education (MINEDU).
• The scope of the program includes the construction and equipping of 75 schools in 5
different climatic zones in Metropolitan Lima and 9 regions of the country.
Classification - Public
Koulu - Specialized Technical Consultancy
• In addition, it is the procurement agent for the program, ensuring open, fair and transparent procurement.
PEIP-Bicentenary
Schools (MINEDU)
Commercial
contract
Koulu Consortium
50/50
Mace/Gleeds
Subcontractors
Classification - Public
Procurement Process
I. Procurement for the design and construction of
the 75 schools.
Classification - Public
STAGES OF THE PROCUREMENT PROCESS
Commitment to
Integrity and Pre Qualification Invitation to
Confidentiality (PQQ) Tender (ITT)
Portal AWARD - Mandatory
Registration Undertaking
LONG LIST
Classification - Public
I. School Procurement Process Package Name N° of Schools
Package 00 Pilot
Package 01 Lima 1
• Of the 75 schools to be tendered, 21 will be
executed in various districts of Metropolitan Lima Package 02 Lima 2
and 09 in the regions of Lambayeque, La
Libertad, Cajamarca, Ucayali, Junín, Cusco and Package 03 Lima 3
Puno. Package 04 Lima 4
Package 05 Lima 5
Package 06 Central
Package 07 North
Package 08 South
Total
Classification - Public
School Packages Up for Bid
Lima 03 and Lima 04
Lima 03
25- Apr 24May 13 May 26-May 27- May 10- Jun 20- Jun 27- Jul
Lima 04
Classification - Public
Supervision Packages Close to Bidding
Packages 1 - 7 / Packages 2 and 6
Package 2 - Lima
02
5- May 31- May 23-May 2-Jun 3-Jun 13-Jun 5- Jul
Package 6 (Central
Peru)
Classification - Public
Supervision Packages Up For Bidding
Packages 3- 4/ Packages 5- 8
Lima 03
Lima 04
31- May 24-Jun 14- Jun 28- Jun 30- Jun 7-Jul 29- Jul
Lima 05
Package 8
(Peru South)
Classification - Public
The contractual system
• We have chosen from a number of standard,
internationally applicable contract templates.
• Because of their range of options, benefits and Works Services Goods
experience in the local market, NEC family contracts Risk and Risk and Risk and
were chosen. complexity complexity complexity
Unde Unde High Unde
High High
r r r
• The new edition was chosen: NEC4, published in
2017.
• From the NEC4 family, the following contracts have
been chosen:
For design and construction works - ECC
(engineering and construction contract).
For quality supervision services and SSOMA
- PSSC (short professional services contract).
• The number of changes has been reduced.
Classification - Public
NEC4 ECC (For Design and Construction)
• We have chosen two-stage contracts, using the new secondary option X22 of the NEC4.
• We have chosen pricing modalities that best meet the Client's objectives and constraints with respect to the level of
information currently available.
❑ Stage One - NEC4 Option A (LOUD SUMA) ❑ Stage Two - Option C (TARGET PRICE)
• Design of contingency schools. • Completion of detail design*.
• Construction of contingency schools*. • Demolitions of existing schools.
• Basic design of permanent schools. • Construction of the new permanent schools.
• Project planning and management. • Dismantling of contingency schools.
At the end of Stage One, once the basic design has been * Lump sum
Classification - Public
NEC4 PSSC (Quality Supervision & SSOMA)
• Simple professional services contracts. Less risks >> less contractual procedures.
• Payment per unit price (months of supervision: i. during construction and ii. during the period of one year
from Completion of the school for notification of defects).
Cronograma ECC (diseño y construcción)
Fecha de inicio
Etapa 1 (diseño y contingencia)
Fin de Etapa 1
Aviso de proceder a la Etapa 2.
Etapa 2 (construcción y desmantelimiento contingencia)
Culminación de las obras
Notificación de Defectos
Fecha de defectos.
Entrega del Certificado de Defectos
Supervisón de calidad Esc. Cont. Esc. Permanente Periodo post Culminación para notificar Defectos.
Classification - Public
THANK YOU VERY
MUCH!