You are on page 1of 9

Technical Offer Details For Pole For Steel monopole for POLES FOR 132 Prepared By SM

KV and 66KV TRANSMISSION LINES AND ASSOCIATED SUBSTATIONS IN Date 25/10/2021


SHISELWENI REGION IN KINGDOM OF ESWATINI,SWAZILAND
Client/Customer SQUIFY2122000096_kalpataru_Eswatini_Swaziland Revision 0

The preliminary design information included with this technical offer may be refined after the award of an order. Skipper’s
intent is to meet the enquiry specification with the following technical offer details, it is client responsibility to read and
understand specifications listed in technical offer details in order assure that we have correctly interpreted enquiry
requirements. Please contact Skipper’s representative for any questions / clarification; we assure that your
questions/clarifications will be addressed as quickly as possible.

Information received from the Client

1. Loading Tree
2. SLD
3. Technical Specification

Pole Design: Designs are based on the following codes/standards/documents:

ASCE/SEI 48-19, "Design of Steel Transmission Pole Structures“ Steel pole shaft consists of 12-sides shape. Double
sections is considering as per Design Requirement. All poles are Base plated in nature as per Client requirement. Under
extreme loading condition, steel pole could incur bigger deflection than lattice pole. Extra secondary bending moment and
stress due to deflection (P-∆ analysis) is included in our non-linear finite element analysis. Safety and strength of poles
are guaranteed in all loading conditions specified by design codes.

Material Grade: The following materials will be used:

Pole shaft : A572-65 or Equivalent


Base Plate : A572-65 or Equivalent
Foundation Bolts : Gr.8.8 or Equivalent
Others : A36 / E250 or Equivalent
Galvanization : ASTM-A123/A153 or Equivalent

FABRICATION & WELD SPECIFICATIONS: Tolerances and Weld specifications are in accordance with Skipper's
standard specification.

The test reports and inspection records are maintained at Skipper Manufacturing Plant location. When requested, these
can be provided to the customer no sooner than two weeks after the fabrication of the component.

SPECIFIC REQUIREMENTS FROM THE CLIENT (YES / NO) IF YES MENTION BELOW

1. Loads on poles are considered from the Load Tree provided by the client.
2. Deflection criteria of 5% of Pole Height.
3. Cross projections and other minimum dimensions are considered from Typical drawings provided by the client

REFERANCES
a. ASCE 48
b. ASCE 74
*These technical offer details must read in conjunction with the quote drawings submitted to you.