[RIH TCR bit from 3561 m upto 3606 m . Clean down hole upto 3618 m ( BP top). Circulated well . P/out TCR bit with mud motor upto 1909 m and shut
RG-E 25-02-2022
well.]
KLN013 (CA) 132
Next Well : SLM014(WDC)-R/NHK011
[P/out tapered mill sgl by sgl from 2610 m to 1523 m [Shut in well at 18:00 hrs due to bandh called by local people ci ng noise related issue.]]
BHEL-A 22-07-2021
Next Well : NHK107(5)-R/NHK191(ABD)-R/NHK621(ABD)/JRN020(ABD)/NHK360 (ABD)/NHK440(ABD)/ NHK441(ABD)/JRN032(ABD)
MDK003(WI) (CA) 470
[POOH Rotovert + J nipple from 2253 m. RIH safety string and shut well. Well kept ready for wireline job for casing communica on iden fica on.]
BHEL-C 30-04-2022
Next well: JRN005(ABD)/ NHK239(ABD)-R/DRI001(ABD)/ JRN027/BGP007-R / NHK131(Ench-Statics)-R/ NHK232(ABD)/ NHK593/NHK150(ABD)-R
NHK576 (CA) 40
[R/in drill pipe with FBM. Started milling from the depth of 13.25 m and milled down to the 23.05 m with continuous circulation and rotary on.
M-1 27-04-2022
Cummula ve hole cleaned = 16.56 m. Shut in the well.]
NHK250 (CA) 24
Next Well : NHK143(ABD)R/JRN-12(5)
DM-1 23-11-2021 [P/out 9.5/8" Rotovert from 1681 m upto 124 m.]
NHK496 (CA) 201 Next Well : NHK235(5)/NHK296(15000)-R/NHK115(ABD)-R/NHK196(Approach)/ NHK087(ABD)
DM-2 [General rig down is in progress.]
NHK166 (WA) Next Well: NHK302(20)/NHK378(5)/NHK447(ABD)-R/ WDW(NHK192)
DM-3 [Rig up job in fwd loc NHK448 is in progress.]
NHK459 (CA) Next Well : NHK448 (ABD)-R/ NHK007(5000)/ WBT001-(ABD)
[WLD unit rigged up & Lowered 2-1/8" Dummy/GR/CCL upto 2880 m. Again, lowered 2-1/8" TTP/CCL & perforated in the range 2841-2847 m. No
DM-4 27-01-2022
immediate pressure built up observed. Shut in well.]
NHK246 (WA) 176
Next Well: NHK114(5)-R/DRI-4(ABD)/DRI003-R/ NHK247(ABD)-R/ NHK104(ABD)
Continued forward circulation with 2 % Nacl & found crude Oil mix solution in return. Pumped 155 bbl kill fluid & got same weight solution. Circulated
CH-1 15-05-2022 for 1 hr. Observed well for 30 mins. No activity seen. Attempted to clean down hole without success. POOH rotovert from 2362.33 m. RIH FBM+ mud
JRN039 (CA) 16 motor upto 960 m.
Next well: NHK553(10)/NHK195 (WI-Stk PKR)
R/in Impression Block from 498 m to 2224 m. Circulated prior to taking impression. Took impression by slacking 8000 lbs. P/out Impression block sgl by
CH-2 18-02-2022
sgl upto 629 m.
HJN054 (EA) 180
Next well: HJN039-R/NHK542-R
WLD made JB trip which got held-up at 3980.6 m and recorded CBL-VDL-CAST log in the range 3980-3850 m which showed channeling across the range
CH-3 23-04-2022
recorded. Interpreta on of pipe inspec on mode is in progress.
BRK011 (EA) 60
Next Well : HJN016(10)-R/HJN057-R/BRK013(ABD)-R /NHK253-R (WI)
CH-4 Rig up job is in progress. To carry out Pre WO safety audit today.
BHJ003 (EA) Next Well: BHJ002/KRJ001/ SCM003-R(SPF)
Continued milling fish top with concave mill from 1349 m down to 1349.45 m. Observed fine metal cuttings in returns. Tried to mill down further but
CH-5 02-05-2022 with no progress. Circulated out metal cuttings. POOH concave mill with junk- busket from 1349 m. R/in I/Block with D/pipe down to 214 m and is in
BGP006 (EA) 42 progress.
Next Well: NHK592(30,000)-R/HJN014-R(WI)/NHK563(LHDP)/BMR006-R(*DIQ)/BMR008(ABD)-R(*DIQ)
Baker Hughes rigged up logging gears & recorded Temp-GR-CCL log in the range 4000-4200 m. R/dn logging gears. Took injectivity in presence of M/S
SLB representa ve @ 2000 psi & recorded as Nil (400 psi decline in 15 min). P/out string with Re-entry guide up to 437 m from 3950 m & is in progress.
CH-6 16-05-2022
Next Well : BMR04(HF)/MRN024 (WI)-R / MRN108-R(ESP)/MRN025(15000)/DKP03(ABD)-
BMR003 (WA) 14
R/MRN089(ABD)/MRN074(ABD)/MRN08(ABD)/MRN06/MRN071
CH-11 03-03-2022 Rig down CTU. General rig down is in progress for fowd loc BRK030.
NMK001 (EA) 160 Next well: BRK030/ STL002/NHK481(5) /NHK471(5)/NHK375(15000)
CH-12 Completed ILM from WDW150. General Rig up in progress.
CBA016 (CA) Next Well : CBA019(15) /CBA018(5)/CBA06(5)/ NHK 499(ABD)/NHK466-R/BGN004-R
Applied 03 nos gas shots and unloaded 01 bbls of well fluid . (Cum. unloaded =284 bbls.) CTU rigged up. Released casing pressure. Shut in well. Sample
CH-13 07-02-2022
analysis as on 22.05.2022 at 01.20 PM : Oil- Nil, Water: 100%; (pH: 7.5, Sal : 1400 ppm, CO3 : nil; HCO3 :2745 ppm).
TNL010 (WA) 204
Next Well: NHK128(5)-R/SLM013-R(*LHDP)/ BGP005-R (SRP)/NHK561-R
WLD Mast
() Next Well : EKJ01/MKM069/BGN026
[General rig-up of acid setup completed. Pressure tested surface lines and fittings upto 750 psi, found okay. R/circulated one (01) hole volume. Kept the
Prod Set-up 21-05-2022
well shut. To start backwashing job on Monday.]
WDW201 (WA) 1
Next well:
Hooked up of acid pumping unit to the well-head completed. Pressure tested S/lines and fittings up to 3000 psi & found ok. R/circulated one (01) hole
S.Mark Setup 22-05-2022
volume. Kept the well shut. To carry out tubing integrity test today.
KMT005 (CA) 1
Next Well : WDW122/WDW200/WDW149
Note: MMC crew deployed in RG-A , RG-B, RG-C, RG-D, RG-E, BHEL A, BHEL C & DM-4