1. The document is a traffic block order for construction work between Ranikhet and mile 486/7-8 involving replacement of an existing RCC box girder.
2. Speed restrictions of 20-30 kmph will be imposed during the work which involves insertion of new RCC segments between July 7-14.
3. The work involves shifting of electric masts, insertion and removal of temporary relieving girders, excavation, welding, and multiple rounds of manual and machine packing to re-link and stabilize the track.
1. The document is a traffic block order for construction work between Ranikhet and mile 486/7-8 involving replacement of an existing RCC box girder.
2. Speed restrictions of 20-30 kmph will be imposed during the work which involves insertion of new RCC segments between July 7-14.
3. The work involves shifting of electric masts, insertion and removal of temporary relieving girders, excavation, welding, and multiple rounds of manual and machine packing to re-link and stabilize the track.
1. The document is a traffic block order for construction work between Ranikhet and mile 486/7-8 involving replacement of an existing RCC box girder.
2. Speed restrictions of 20-30 kmph will be imposed during the work which involves insertion of new RCC segments between July 7-14.
3. The work involves shifting of electric masts, insertion and removal of temporary relieving girders, excavation, welding, and multiple rounds of manual and machine packing to re-link and stabilize the track.
Restriction D-2 NIL Preparation of block. Imposition of SR 20 KMPH on Dn. & Up M/line. D-1 1Hrs each on UP & Shifting of Electric mast 20 KMPH DN Line. acting as infringement in girder insertion D 2 Block of 2 ½ Hrs Insertion of relieving 20 KMPH (UP & DN M/Line) girders on UP & DN M/Line D+1 Nil Excavation in ordinary soil 20 KMPH & soft rock D+3 5 ½ Hrs (UP & DN Reliving girders on UP & 20 KMPH M/Line) DN M/Line along with CC Crib will be removed Insertion of RCC Box on UP 20 KMPH & DN M/Line Track will be re linked 20 KMPH D+4 2 Blocks, 2:30hrs Welding work after track 20 KMPH each (UP or DN) reliving
D+5 2 Blocks, 2:30 hrs Welding work after track 20 KMPH
each (UP or DN) reliving D+6 Nil 1st round of manual 30KMPH packing. D+7 2 Block of 2hrs 1st round of machine 45KMPH each UP & DN packing. D+1 2 Block of 2hrs 2nd round of packing. 75KMPH 1 each UP & DN D+1 2 Block of 2hrs 3rd round of packing. Normal 4 each UP & DN