SPECIFICATION NO.

2014

January, 2014

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

SPECIAL CONDITIONS OF CONTRACT,

TECHNICAL SPECIFICATIONS AND SCHEDULE OF QUANTITIES

FOR

HVAC WORK

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Architect :
TABLE OF CONTENTS

S. NO. DESCRIPTION SECTION NO. PAGE NO.

1. Special Conditions of Contract -- SC-1


2. System Design Data (Section – 1) S-1
3. Water Cooled chilling Units (Screw Type) (Section – 2) S-10
4. Water Circulating Equipment (Multistage Pumping) (Section – 3) S-18
5. Ventilation System (Section – 4) S-24
6. Air Handling Units (Special High Static – Sectional Type) (Section – 5) S-31
7. Air Handling Units (Unitary Vertical Type) (Section – 6) S-36
8. Air Handling Units (Sectional Type) (Section – 7) S-40
9. Air Handling Units (Unicom Vertical Type) (Section – 8) S-44
10. Air Handling Units (Ceiling Suspended Type) (Section – 9) S-49
11. Treated Fresh Air Unit (Section – 10) S-53
12. Fan Coil Units (Section – 11) S-58
13. Heat Recovery Unit (Section – 12) S-61
14. Hot Water Boiler (Electric) (Section – 13) S-64
15. Filters (Section – 14) S-66
16. Electric Controls (Section – 15) S-71
17. Control Panel, Motors and Switchgears (Section – 16) S-80
18. Duct Works And Outlets (Section – 17) S-85
19. Duct Accessories (Section – 18) S-95
20. Pipe Work (Section – 19) S-103
21. Insulation (Section – 20) S-106
22. Electric Cabling (Section – 21) S-112
23. Testing and Commissioning (Section – 22) S-116
24. Mode of Measurements (Section – 23) S-121
25. Test Performa (Section – 24) S-123
26. Safety Codes (Section – 25) S-129
27. Schedule of Equipment Proposed (Section – 26) S-137
28. Technical Data (Section – 27) S-141
29. List of Approved Makes (Section – 28) S-144
30. Data Confirmation Sheet (Section – 29) S-144
31. List of Drawings (Section – 30) S-144
32. Schedule of Quantities -- BOQ-1

**********