RENCANA PRODUKSI SPINNING 1

JML. SPEED PROD/MSN/HARI PROD/HARI KEB.


NO BAGIAN JALUR LINE RPM ἀ GRAIN NE TPI Rkp DLV JAM EFF
MSN m/mnt Kg Bale Kg Bale DRUM
1 Blowing

2 Carding LINE A 10 145 480 0.104 1 24 0.92 1089.525 6.00 10895.248 60.05
LINE B 10 140 480 0.104 1 24 0.92 1051.955 5.80 10519.550 57.98

3 Draw. Breaker LINE A 3 395 405 0.1235 6 1 24 0.66 1795.751 9.90 5387.253 29.69
LINE B 3 395 405 0.1235 6 1 24 0.66 1795.751 9.90 5387.253 29.69

4 Draw. Finisher LINE A 3 700 365 0.137 6 1 24 0.82 3563.320 19.64 10689.959 58.92
LINE B 3 700 365 0.137 6 1 24 0.82 3563.320 19.64 10689.959 58.92

5 Flyer LINE A 4 950 215 1.1628 0.695 132 24 0.79 2647.842 14.59 10591.367 58.37
LINE B 4 950 215 1.1628 0.695 132 24 0.79 2647.842 14.59 10591.367 58.37

6 Ring Frame
31 15500 22.88 3.14 30 17.21 516 24 0.945 316.202 1.74 9802.267 54.02 IBR
Tr 17 13250 22.05 2.79 20 15.26 516 24 0.9 435.489 2.40 7403.315 40.80
Tr 5 16300 20.33 3.72 40 8:52 516 24 0.9 200.670 1.11 1003.350 5.53
Tr 0 17500 19.55 4.15 45 22.74 516 24 0.95 181.077 1.00 0.000 0.00 APR
Tr 0 17500 19.55 4.15 45 22.74 516 24 0.95 181.077 1.00 0.000 0.00 MAY
Tr

7 Winding
Tr 1500 30 24 0.75 31.89 0.176 9802.267 54.02 307
Tr 1250 20 24 0.72 38.27 0.211 7403.315 40.80 193
Tr 1300 20 24 0.72 39.80 0.219 1003.350 5.53 25
Tr 1400 45 24 0.8 21.17 0.117 211.680 1.17 10
Tr 1400 45 24 0.8 21.17 0.117 317.520 1.75 15
Tr
18420.612 101.52

Kebutuhan bahan baku :


1. Polyester
2. Rayon
Produksi/Hari Eff 100%
Total
Kg Bale

10372.769 57.169 311183.080


8225.906 45.337 164518.113
1114.834 6.144 44593.343
0.000 0.000 0.000
0.000 0.000 0.000

Total Drum Actual Sisa

648 551 97
19713.509 520294.535
26.39
Ne rata rata