DISEÑO DE COLUMNAS DE CONCRETO ARMADO

Dimensiones de columna
H= 100 Cm
B= 25 Cm
Materiales
fc= 210 Kg/cm2
Fy= 4200 Kg/cm2

Numero de pisos edificio: 10


W ( Peso por unidad de area) 0.9 Tn/m2
Area Tributaria: 16.36 m2
n= 0.45 Columna central
Carga total en la columna (1.25 Ps): 184.05 Tn
Carga axial resistente: 236.25 OK

Estribo: 3/8 10.34


400
Refuerzo: 13.29
Fila n di F Area 350
1 2 3.49 3/4 5.700
2 2 16.78 5/8 3.959 300
3 2 30.07 5/8 3.959
4 2 43.36 5/8 3.959 250
5
6
P(Tn) 200
7 2 56.64 5/8 3.959
8 2 69.93 5/8 3.959
150
9 2 83.22 5/8 3.959
10 2 96.51 3/4 5.700
Area Total: 35.153 cm2 100

Area bruta Columna: 2500 Cm2 50


r= 0.01406113
r≥0.01 OK 0
Condicion Concentrica: P= 593.892 Tn 0 10 20
ey= 0.0021 Cb= 56.769 Cm
-6.95
1.3
-8.25
0.35 Columna en esquina
0.35 Columna lateral
0.45 Columna central

400

350 19.9088535
66.4275974
300 119.029602
171.631607
250 0 Cp=
0
224.233611
200
276.835616
Iteraccion Factorado
329.437621
Cargas
150
550.13706
1757.64157
100

50

0
0 10 20 30 40 50 60 70
M (tn-m)
50
Cb= 56.769117647059 d= 96.51 Cm
ey= 0.0021
Falla Fragil E= 2000000 Kg/Cm2

56.77 5.67691176

C C d1
1 0 0
1 5.67691176 5.6769117647059
3 11.3538235 11.353823529412
4 17.0307353 17.030735294118
5 22.7076471 22.707647058824
6 28.3845588 28.384558823529
7 34.0614706 34.061470588235
8 39.7383824 39.738382352941
9 45.4152941 45.415294117647
10 51.0922059 51.092205882353
11 56.7691176 56.769117647059

Centro plastico:
C= 5.677
Acero:
di Ai e si F brazo
1 3.49 5.70 -0.001154 -2,308.73 -13,160.84 46.51
2 16.78 3.96 0.005868 4,200.00 16,626.34 33.22
3 30.07 3.96 0.012890 4,200.00 16,626.34 19.93
4 43.36 3.96 0.019912 4,200.00 16,626.34 6.64
5 0.00 0.00 -0.003000 -4,200.00 0.00 50.00
6 0.00 0.00 -0.003000 -4,200.00 0.00 50.00
7 56.64 3.96 0.026934 4,200.00 16,626.34 -6.64
8 69.93 3.96 0.033956 4,200.00 16,626.34 -19.93
9 83.22 3.96 0.040978 4,200.00 16,626.34 -33.22
10 96.51 5.70 0.048000 4,200.00 23,941.93 -46.51
110,539.13
Concreto: a= 4.825375 cm
b= 25 cm
fc= 210 Kg/cm2 brazo=
Pc= -21,533.24 M=

P= 89,005.89 M= -2,750,265.60
-89.01 M= 27.50

C= 11.354
Acero:
di Ai e si F brazo
3.49 5.70 -0.002077 -4,154.37 -23,681.80 46.51
16.78 3.96 0.001434 2,867.69 11,352.17 33.22
30.07 3.96 0.004945 4,200.00 16,626.34 19.93
43.36 3.96 0.008456 4,200.00 16,626.34 6.64
0.00 0.00 -0.003000 -4,200.00 0.00 50.00
0.00 0.00 -0.003000 -4,200.00 0.00 50.00
56.64 3.96 0.011967 4,200.00 16,626.34 -6.64
69.93 3.96 0.015478 4,200.00 16,626.34 -19.93
83.22 3.96 0.018989 4,200.00 16,626.34 -33.22
96.51 5.70 0.022500 4,200.00 23,941.93 -46.51
94,744.00
Concreto: a= 9.65075 cm
b= 25 cm
fc= 210 Kg/cm2 brazo=
Pc= -43,066.47 M=

P= 51,677.53 M= -4,335,577.99
-51.68 M= 43.36

C= 17.031
Acero:
di Ai e si F brazo
3.49 5.70 -0.002385 -4,200.00 -23,941.93 46.51
16.78 3.96 -0.000044 -88.21 -349.19 33.22
30.07 3.96 0.002297 4,200.00 16,626.34 19.93
43.36 3.96 0.004637 4,200.00 16,626.34 6.64
0.00 0.00 -0.003000 -4,200.00 0.00 50.00
0.00 0.00 -0.003000 -4,200.00 0.00 50.00
56.64 3.96 0.006978 4,200.00 16,626.34 -6.64
69.93 3.96 0.009319 4,200.00 16,626.34 -19.93
83.22 3.96 0.011659 4,200.00 16,626.34 -33.22
96.51 5.70 0.014000 4,200.00 23,941.93 -46.51
82,782.51
Concreto: a= 14.476125 cm
b= 25 cm
fc= 210 Kg/cm2 brazo=
Pc= -64,599.71 M=

P= 18,182.80 M= -5,553,288.15
-18.18 M= 55.53

C= 22.708
Acero:
di Ai e si F brazo
3.49 5.70 -0.002539 -4,200.00 -23,941.93 46.51
16.78 3.96 -0.000783 -1,566.16 -6,199.87 33.22
30.07 3.96 0.000972 1,944.87 7,699.06 19.93
43.36 3.96 0.002728 4,200.00 16,626.34 6.64
0.00 0.00 -0.003000 -4,200.00 0.00 50.00
0.00 0.00 -0.003000 -4,200.00 0.00 50.00
56.64 3.96 0.004483 4,200.00 16,626.34 -6.64
69.93 3.96 0.006239 4,200.00 16,626.34 -19.93
83.22 3.96 0.007994 4,200.00 16,626.34 -33.22
96.51 5.70 0.009750 4,200.00 23,941.93 -46.51
68,004.55
Concreto: a= 19.3015 cm
b= 25 cm
fc= 210 Kg/cm2 brazo=
Pc= -86,132.94 M=

P= -18,128.40 M= -6,638,573.29
18.13 M= 66.39

C= 28.385
Acero:
di Ai e si F brazo
3.49 5.70 -0.002631 -4,200.00 -23,941.93 46.51
16.78 3.96 -0.001226 -2,452.93 -9,710.28 33.22
30.07 3.96 0.000178 355.90 1,408.87 19.93
43.36 3.96 0.001582 3,164.72 12,528.01 6.64
0.00 0.00 -0.003000 -4,200.00 0.00 50.00
0.00 0.00 -0.003000 -4,200.00 0.00 50.00
56.64 3.96 0.002987 4,200.00 16,626.34 -6.64
69.93 3.96 0.004391 4,200.00 16,626.34 -19.93
83.22 3.96 0.005796 4,200.00 16,626.34 -33.22
96.51 5.70 0.007200 4,200.00 23,941.93 -46.51
54,105.62
Concreto: a= 24.126875 cm
b= 25 cm
fc= 210 Kg/cm2 brazo=
Pc= -107,666.18 M=

P= -53,560.56 M= -7,516,876.69
53.56 M= 75.17

C= 34.061
Acero:
di Ai e si F brazo
3.49 5.70 -0.002692 -4,200.00 -23,941.93 46.51
16.78 3.96 -0.001522 -3,044.10 -12,050.55 33.22
30.07 3.96 -0.000352 -703.42 -2,784.60 19.93
43.36 3.96 0.000819 1,637.26 6,481.36 6.64
0.00 0.00 -0.003000 -4,200.00 0.00 50.00
0.00 0.00 -0.003000 -4,200.00 0.00 50.00
56.64 3.96 0.001989 3,977.95 15,747.31 -6.64
69.93 3.96 0.003159 4,200.00 16,626.34 -19.93
83.22 3.96 0.004330 4,200.00 16,626.34 -33.22
96.51 5.70 0.005500 4,200.00 23,941.93 -46.51
40,646.20
Concreto: a= 28.95225 cm
b= 25 cm
fc= 210 Kg/cm2 brazo=
Pc= -129,199.42 M=

P= -88,553.22 M= -8,217,715.39
88.55 M= 82.18

C= 39.738
Acero:
di Ai e si F brazo
3.49 5.70 -0.002736 -4,200.00 -23,941.93 46.51
16.78 3.96 -0.001733 -3,466.38 -13,722.17 33.22
30.07 3.96 -0.000730 -1,460.07 -5,779.93 19.93
43.36 3.96 0.000273 546.23 2,162.32 6.64
0.00 0.00 -0.003000 -4,200.00 0.00 50.00
0.00 0.00 -0.003000 -4,200.00 0.00 50.00
56.64 3.96 0.001276 2,552.53 10,104.56 -6.64
69.93 3.96 0.002279 4,200.00 16,626.34 -19.93
83.22 3.96 0.003283 4,200.00 16,626.34 -33.22
96.51 5.70 0.004286 4,200.00 23,941.93 -46.51
26,017.46
Concreto: a= 33.777625 cm
b= 25 cm
fc= 210 Kg/cm2 brazo=
Pc= -150,732.65 M=

P= -124,715.19 M= -8,725,426.98
124.72 M= 87.25

C= 45.415
Acero:
di Ai e si F brazo
3.49 5.70 -0.002769 -4,200.00 -23,941.93 46.51
16.78 3.96 -0.001892 -3,783.08 -14,975.89 33.22
30.07 3.96 -0.001014 -2,027.57 -8,026.43 19.93
43.36 3.96 -0.000136 -272.05 -1,076.96 6.64
0.00 0.00 -0.003000 -4,200.00 0.00 50.00
0.00 0.00 -0.003000 -4,200.00 0.00 50.00
56.64 3.96 0.000742 1,483.46 5,872.51 -6.64
69.93 3.96 0.001619 3,238.97 12,821.97 -19.93
83.22 3.96 0.002497 4,200.00 16,626.34 -33.22
96.51 5.70 0.003375 4,200.00 23,941.93 -46.51
11,241.54
Concreto: a= 38.603 cm
b= 25 cm
fc= 210 Kg/cm2 brazo=
Pc= -172,265.89 M=

P= -161,024.35 M= -9,026,795.18
161.02 M= 90.27

C= 51.092
Acero:
di Ai e si F brazo
3.49 5.70 -0.002795 -4,200.00 -23,941.93 46.51
16.78 3.96 -0.002015 -4,029.40 -15,951.01 33.22
30.07 3.96 -0.001234 -2,468.95 -9,773.70 19.93
43.36 3.96 -0.000454 -908.49 -3,596.40 6.64
0.00 0.00 -0.003000 -4,200.00 0.00 50.00
0.00 0.00 -0.003000 -4,200.00 0.00 50.00
56.64 3.96 0.000326 651.97 2,580.90 -6.64
69.93 3.96 0.001106 2,212.42 8,758.21 -19.93
83.22 3.96 0.001886 3,772.88 14,935.51 -33.22
96.51 5.70 0.002667 4,200.00 23,941.93 -46.51
-3,046.49
Concreto: a= 43.428375 cm
b= 25 cm
fc= 210 Kg/cm2 brazo=
Pc= -193,799.12 M=

P= -196,845.61 M= -9,145,178.69
196.85 M= 91.45

C= 56.769
Acero:
di Ai e si F brazo
3.49 5.70 -0.002815 -4,200.00 -23,941.93 46.51
16.78 3.96 -0.002113 -4,200.00 -16,626.34 33.22
30.07 3.96 -0.001411 -2,822.05 -11,171.52 19.93
43.36 3.96 -0.000709 -1,417.64 -5,611.95 6.64
0.00 0.00 -0.003000 -4,200.00 0.00 50.00
0.00 0.00 -0.003000 -4,200.00 0.00 50.00
56.64 3.96 -0.000007 -13.23 -52.38 -6.64
69.93 3.96 0.000696 1,391.18 5,507.19 -19.93
83.22 3.96 0.001398 2,795.59 11,066.77 -33.22
96.51 5.70 0.002100 4,200.00 23,941.93 -46.51
-16,888.23
Concreto: a= 48.25375 cm
b= 25 cm
fc= 210 Kg/cm2 brazo=
Pc= -215,332.36 M=

P= -232,220.59 M= -9,087,608.63
232.22 M= 90.88
50

momento
-612,077.54
552,321.05
331,392.63
110,464.21
0.00
0.00
-110,464.21
-331,392.63
-552,321.05
-1,113,479.23
-1,725,556.78

47.5873125
-1,024,708.83

momento
-1,101,381.08
377,115.09
331,392.63
110,464.21
0.00
0.00
-110,464.21
-331,392.63
-552,321.05
-1,113,479.23
-2,390,066.27

45.174625
-1,945,511.72

momento
-1,113,479.23
-11,599.96
331,392.63
110,464.21
0.00
0.00
-110,464.21
-331,392.63
-552,321.05
-1,113,479.23
-2,790,879.48

42.7619375
-2,762,408.67

momento
-1,113,479.23
-205,957.49
153,456.03
110,464.21
0.00
0.00
-110,464.21
-331,392.63
-552,321.05
-1,113,479.23
-3,163,173.61

40.34925
-3,475,399.68

momento
-1,113,479.23
-322,572.01
28,081.21
83,235.21
0.00
0.00
-110,464.21
-331,392.63
-552,321.05
-1,113,479.23
-3,432,391.94

37.9365625
-4,084,484.75

momento
-1,113,479.23
-400,315.02
-55,502.00
43,061.67
0.00
0.00
-104,624.01
-331,392.63
-552,321.05
-1,113,479.23
-3,628,051.50

35.523875
-4,589,663.89

momento
-1,113,479.23
-455,845.74
-115,204.29
14,366.29
0.00
0.00
-67,134.01
-331,392.63
-552,321.05
-1,113,479.23
-3,734,489.89

33.1111875
-4,990,937.09

momento
-1,113,479.23
-497,493.78
-159,981.01
-7,155.25
0.00
0.00
-39,016.50
-255,564.78
-552,321.05
-1,113,479.23
-3,738,490.83

30.6985
-5,288,304.35

momento
-1,113,479.23
-529,886.70
-194,807.34
-23,894.22
0.00
0.00
-17,147.34
-174,566.68
-496,152.27
-1,113,479.23
-3,663,413.03

28.2858125
-5,481,765.67

momento
-1,113,479.23
-552,321.05
-222,668.41
-37,285.40
0.00
0.00
348.00
-109,768.21
-367,634.03
-1,113,479.23
-3,516,287.58

25.873125
-5,571,321.05
Cb= 56.769117647059 d= 96.51 Cm
ey= 0.0021
Falla Fragil E= 2000000 Kg/Cm2

39.74 3.97383824

C C d1
1 0 0
1 3.97383824 60.742955882353
3 7.94767647 64.716794117647
4 11.9215147 68.690632352941
5 15.8953529 72.664470588235
6 19.8691912 76.638308823529
7 23.8430294 80.612147058824
8 27.8168676 84.585985294118
9 31.7907059 88.559823529412
10 35.7645441 92.533661764706
11 39.7383824 96.5075

Centro plastico:
C= 60.743
Acero:
di Ai e si F brazo
1 3.49 5.70 -0.002828 -4,200.00 -23,941.93 46.51
2 16.78 3.96 -0.002171 -4,200.00 -16,626.34 33.22
3 30.07 3.96 -0.001515 -3,029.96 -11,994.54 19.93
4 43.36 3.96 -0.000859 -1,717.42 -6,798.68 6.64
5 0.00 0.00 -0.003000 -4,200.00 0.00 50.00
6 0.00 0.00 -0.003000 -4,200.00 0.00 50.00
7 56.64 3.96 -0.000202 -404.89 -1,602.82 -6.64
8 69.93 3.96 0.000454 907.64 3,593.05 -19.93
9 83.22 3.96 0.001110 2,220.18 8,788.91 -33.22
10 96.51 5.70 0.001766 3,532.71 20,138.07 -46.51
-28,444.27
Concreto: a= 51.6315125 cm
b= 25 cm
fc= 210 Kg/cm2 brazo=
Pc= -230,405.62 M=

P= -258,849.90 M= -8,811,731.18
258.85 M= 88.12

C= 64.717
Acero:
di Ai e si F brazo
3.49 5.70 -0.002838 -4,200.00 -23,941.93 46.51
16.78 3.96 -0.002222 -4,200.00 -16,626.34 33.22
30.07 3.96 -0.001606 -3,212.33 -12,716.48 19.93
43.36 3.96 -0.000990 -1,980.39 -7,839.67 6.64
0.00 0.00 -0.003000 -4,200.00 0.00 50.00
0.00 0.00 -0.003000 -4,200.00 0.00 50.00
56.64 3.96 -0.000374 -748.45 -2,962.85 -6.64
69.93 3.96 0.000242 483.49 1,913.97 -19.93
83.22 3.96 0.000858 1,715.43 6,790.79 -33.22
96.51 5.70 0.001474 2,947.37 16,801.35 -46.51
-38,581.15
Concreto: a= 55.009275 cm
b= 25 cm
fc= 210 Kg/cm2 brazo=
Pc= -245,478.89 M=

P= -284,060.04 M= -8,518,925.70
284.06 M= 85.19

C= 68.691
Acero:
di Ai e si F brazo
3.49 5.70 -0.002847 -4,200.00 -23,941.93 46.51
16.78 3.96 -0.002267 -4,200.00 -16,626.34 33.22
30.07 3.96 -0.001687 -3,373.60 -13,354.90 19.93
43.36 3.96 -0.001106 -2,212.93 -8,760.21 6.64
0.00 0.00 -0.003000 -4,200.00 0.00 50.00
0.00 0.00 -0.003000 -4,200.00 0.00 50.00
56.64 3.96 -0.000526 -1,052.26 -4,165.52 -6.64
69.93 3.96 0.000054 108.41 429.17 -19.93
83.22 3.96 0.000635 1,269.08 5,023.86 -33.22
96.51 5.70 0.001215 2,429.75 13,850.70 -46.51
-47,545.17
Concreto: a= 58.3870375 cm
b= 25 cm
fc= 210 Kg/cm2 brazo=
Pc= -260,552.15 M=

P= -308,097.32 M= -8,203,293.82
308.10 M= 82.03

C= 72.664
Acero:
di Ai e si F brazo
3.49 5.70 -0.002856 -4,200.00 -23,941.93 46.51
16.78 3.96 -0.002307 -4,200.00 -16,626.34 33.22
30.07 3.96 -0.001759 -3,517.23 -13,923.48 19.93
43.36 3.96 -0.001210 -2,420.03 -9,580.07 6.64
0.00 0.00 -0.003000 -4,200.00 0.00 50.00
0.00 0.00 -0.003000 -4,200.00 0.00 50.00
56.64 3.96 -0.000661 -1,322.84 -5,236.65 -6.64
69.93 3.96 -0.000113 -225.64 -893.24 -19.93
83.22 3.96 0.000436 871.55 3,450.18 -33.22
96.51 5.70 0.000984 1,968.75 11,222.78 -46.51
-55,528.75
Concreto: a= 61.7648 cm
b= 25 cm
fc= 210 Kg/cm2 brazo=
Pc= -275,625.42 M=

P= -331,154.17 M= -7,860,227.43
331.15 M= 78.60

C= 76.638
Acero:
di Ai e si F brazo
3.49 5.70 -0.002863 -4,200.00 -23,941.93 46.51
16.78 3.96 -0.002343 -4,200.00 -16,626.34 33.22
30.07 3.96 -0.001823 -3,645.96 -14,433.11 19.93
43.36 3.96 -0.001303 -2,605.66 -10,314.90 6.64
0.00 0.00 -0.003000 -4,200.00 0.00 50.00
0.00 0.00 -0.003000 -4,200.00 0.00 50.00
56.64 3.96 -0.000783 -1,565.36 -6,196.70 -6.64
69.93 3.96 -0.000263 -525.05 -2,078.50 -19.93
83.22 3.96 0.000258 515.25 2,039.70 -33.22
96.51 5.70 0.000778 1,555.56 8,867.38 -46.51
-62,684.40
Concreto: a= 65.1425625 cm
b= 25 cm
fc= 210 Kg/cm2 brazo=
Pc= -290,698.69 M=

P= -353,383.08 M= -7,486,074.17
353.38 M= 74.86

C= 80.612
Acero:
di Ai e si F brazo
3.49 5.70 -0.002870 -4,200.00 -23,941.93 46.51
16.78 3.96 -0.002376 -4,200.00 -16,626.34 33.22
30.07 3.96 -0.001881 -3,762.01 -14,892.48 19.93
43.36 3.96 -0.001386 -2,772.99 -10,977.29 6.64
0.00 0.00 -0.003000 -4,200.00 0.00 50.00
0.00 0.00 -0.003000 -4,200.00 0.00 50.00
56.64 3.96 -0.000892 -1,783.97 -7,062.10 -6.64
69.93 3.96 -0.000397 -794.94 -3,146.91 -19.93
83.22 3.96 0.000097 194.08 768.28 -33.22
96.51 5.70 0.000592 1,183.10 6,744.21 -46.51
-69,134.56
Concreto: a= 68.520325 cm
b= 25 cm
fc= 210 Kg/cm2 brazo=
Pc= -305,771.95 M=

P= -374,906.51 M= -7,077,901.89
374.91 M= 70.78

C= 84.586
Acero:
di Ai e si F brazo
3.49 5.70 -0.002876 -4,200.00 -23,941.93 46.51
16.78 3.96 -0.002405 -4,200.00 -16,626.34 33.22
30.07 3.96 -0.001934 -3,867.15 -15,308.70 19.93
43.36 3.96 -0.001462 -2,924.59 -11,577.44 6.64
0.00 0.00 -0.003000 -4,200.00 0.00 50.00
0.00 0.00 -0.003000 -4,200.00 0.00 50.00
56.64 3.96 -0.000991 -1,982.03 -7,846.19 -6.64
69.93 3.96 -0.000520 -1,039.48 -4,114.93 -19.93
83.22 3.96 -0.000048 -96.92 -383.67 -33.22
96.51 5.70 0.000423 845.64 4,820.52 -46.51
-74,978.67
Concreto: a= 71.8980875 cm
b= 25 cm
fc= 210 Kg/cm2 brazo=
Pc= -320,845.22 M=

P= -395,823.89 M= -6,633,329.42
395.82 M= 66.33

C= 88.560
Acero:
di Ai e si F brazo
3.49 5.70 -0.002882 -4,200.00 -23,941.93 46.51
16.78 3.96 -0.002432 -4,200.00 -16,626.34 33.22
30.07 3.96 -0.001981 -3,962.85 -15,687.56 19.93
43.36 3.96 -0.001531 -3,062.59 -12,123.73 6.64
0.00 0.00 -0.003000 -4,200.00 0.00 50.00
0.00 0.00 -0.003000 -4,200.00 0.00 50.00
56.64 3.96 -0.001081 -2,162.33 -8,559.90 -6.64
69.93 3.96 -0.000631 -1,262.06 -4,996.08 -19.93
83.22 3.96 -0.000181 -361.80 -1,432.25 -33.22
96.51 5.70 0.000269 538.46 3,069.48 -46.51
-80,298.31
Concreto: a= 75.27585 cm
b= 25 cm
fc= 210 Kg/cm2 brazo=
Pc= -335,918.48 M=

P= -416,216.79 M= -6,150,402.99
416.22 M= 61.50

C= 92.534
Acero:
di Ai e si F brazo
3.49 5.70 -0.002887 -4,200.00 -23,941.93 46.51
16.78 3.96 -0.002456 -4,200.00 -16,626.34 33.22
30.07 3.96 -0.002025 -4,050.34 -16,033.88 19.93
43.36 3.96 -0.001594 -3,188.74 -12,623.10 6.64
0.00 0.00 -0.003000 -4,200.00 0.00 50.00
0.00 0.00 -0.003000 -4,200.00 0.00 50.00
56.64 3.96 -0.001164 -2,327.14 -9,212.32 -6.64
69.93 3.96 -0.000733 -1,465.53 -5,801.54 -19.93
83.22 3.96 -0.000302 -603.93 -2,390.76 -33.22
96.51 5.70 0.000129 257.67 1,468.83 -46.51
-85,161.04
Concreto: a= 78.6536125 cm
b= 25 cm
fc= 210 Kg/cm2 brazo=
Pc= -350,991.75 M=

P= -436,152.79 M= -5,627,504.44
436.15 M= 56.28

C= 96.508
Acero:
di Ai e si F brazo
3.49 5.70 -0.002891 -4,200.00 -23,941.93 46.51
16.78 3.96 -0.002478 -4,200.00 -16,626.34 33.22
30.07 3.96 -0.002065 -4,130.62 -16,351.68 19.93
43.36 3.96 -0.001652 -3,304.50 -13,081.35 6.64
0.00 0.00 -0.003000 -4,200.00 0.00 50.00
0.00 0.00 -0.003000 -4,200.00 0.00 50.00
56.64 3.96 -0.001239 -2,478.37 -9,811.01 -6.64
69.93 3.96 -0.000826 -1,652.25 -6,540.67 -19.93
83.22 3.96 -0.000413 -826.12 -3,270.34 -33.22
96.51 5.70 0.000000 0.00 0.00 -46.51
-89,623.32
Concreto: a= 82.031375 cm
b= 25 cm
fc= 210 Kg/cm2 brazo=
Pc= -366,065.01 M=

P= -455,688.33 M= -5,063,282.16
455.69 M= 50.63
50

momento
-1,113,479.23
-552,321.05
-239,072.60
-45,169.93
0.00
0.00
10,648.99
-71,615.84
-291,964.42
-936,571.32
-3,239,545.39

24.18424375
-5,572,185.79
momento
-1,113,479.23
-552,321.05
-253,462.23
-52,086.18
0.00
0.00
19,684.95
-38,148.85
-225,587.57
-781,388.94
-2,996,789.09

22.4953625
-5,522,136.61

momento
-1,113,479.23
-552,321.05
-266,186.94
-58,202.20
0.00
0.00
27,675.42
-8,554.07
-166,890.68
-644,161.54
-2,782,120.29

20.80648125
-5,421,173.52

momento
-1,113,479.23
-552,321.05
-277,519.90
-63,649.29
0.00
0.00
34,791.94
17,803.78
-114,613.76
-521,943.39
-2,590,930.90

19.1176
-5,269,296.53

momento
-1,113,479.23
-552,321.05
-287,677.58
-68,531.49
0.00
0.00
41,170.45
41,428.22
-67,758.16
-412,399.72
-2,419,568.55

17.42871875
-5,066,505.62

momento
-1,113,479.23
-552,321.05
-296,833.80
-72,932.34
0.00
0.00
46,920.09
62,723.50
-25,522.12
-313,656.12
-2,265,101.08

15.7398375
-4,812,800.81

momento
-1,113,479.23
-552,321.05
-305,129.70
-76,919.70
0.00
0.00
52,129.49
82,017.87
12,745.44
-224,190.45
-2,125,147.33

14.05095625
-4,508,182.09

momento
-1,113,479.23
-552,321.05
-312,681.10
-80,549.21
0.00
0.00
56,871.39
99,580.70
47,578.72
-142,753.75
-1,997,753.53

12.362075
-4,152,649.45

momento
-1,113,479.23
-552,321.05
-319,583.91
-83,866.99
0.00
0.00
61,206.00
115,635.06
79,420.19
-68,311.61
-1,881,301.54

10.67319375
-3,746,202.91

momento
-1,113,479.23
-552,321.05
-325,918.26
-86,911.54
0.00
0.00
65,183.65
130,367.30
108,639.42
0.00
-1,774,439.70

8.9843125
-3,288,842.45
Cb= 56.769117647059 d= 96.51 Cm
ey= 0.0021
Falla Fragil E= 2000000 Kg/Cm2

39.74 3.97383824

C C d1
1 0 0
1 3.97383824 60.742955882353
3 7.94767647 64.716794117647
4 11.9215147 68.690632352941
5 15.8953529 72.664470588235
6 19.8691912 76.638308823529
7 23.8430294 80.612147058824
8 27.8168676 84.585985294118
9 31.7907059 88.559823529412
10 35.7645441 92.533661764706
11 39.7383824 96.5075

Centro plastico:
C= 56.769
Acero:
di Ai e si F brazo
1 3.49 5.70 -0.002815 -4,200.00 -23,941.93 46.51
2 16.78 3.96 -0.002113 -4,200.00 -16,626.34 33.22
3 30.07 3.96 -0.001411 -2,822.05 -11,171.52 19.93
4 43.36 3.96 -0.000709 -1,417.64 -5,611.95 6.64
5 0.00 0.00 -0.003000 -4,200.00 0.00 50.00
6 0.00 0.00 -0.003000 -4,200.00 0.00 50.00
7 56.64 3.96 -0.000007 -13.23 -52.38 -6.64
8 69.93 3.96 0.000696 1,391.18 5,507.19 -19.93
9 83.22 3.96 0.001398 2,795.59 11,066.77 -33.22
10 96.51 5.70 0.002100 4,200.00 23,941.93 -46.51
-16,888.23
Concreto: a= 48.25375 cm
b= 25 cm
fc= 210 Kg/cm2 brazo=
Pc= -215,332.36 M=

P= -232,220.59 M= -9,087,608.63
232.22 M= 90.88
50

momento
-1,113,479.23
-552,321.05
-222,668.41
-37,285.40
0.00
0.00
348.00
-109,768.21
-367,634.03
-1,113,479.23
-3,516,287.58

25.873125
-5,571,321.05
TABAL RESUMEN 353.365676
400
M P P FM FP
0 593.891892 593.891892 0 415.724324 353.365676
10 350 50.63 455.69 455.68833 35.4429751 318.981831 318.981831
9 56.28 436.15 436.15279 39.3925311 305.306953 305.306953
8 61.50 416.22 416.216789 43.0528209 291.351752 291.351752
7 66.33 395.82 395.823886 46.4333059 277.07672 277.07672
300
6 70.78 374.91 374.906513 49.5453132 262.434559 262.434559
5 74.86 353.38 353.383083 52.4025192 247.368158 247.368158
4 78.60 331.15 331.154167 55.021592 231.807917 231.807917
250
3 82.03 308.10 308.097324 57.4230567 215.668127 215.668127
2 85.19 284.06 284.060042 59.6324799 198.84203 198.84203
1 88.12 258.85 258.849898 61.6821183 181.194929 181.194929
200
P(Tn)

B 90.88 232.22 232.220591 63.6132604 162.554414 162.554414


9 91.45 196.85 196.845613 64.0162509 137.791929 137.791929
8 90.27 161.02 161.024351 63.1875663 112.717046 112.717046
7 150 87.25 124.72 124.715193 61.0779889 87.3006348 87.3006348
6 82.18 88.55 88.5532177 57.5240077 61.9872524 61.9872524
5 75.17 53.56 53.5605644 52.6181368 37.4923951 37.4923951
4 100 66.39 18.13 18.1283971 46.470013 12.689878 12.689878
3 55.53 -18.18 0 38.873017 0 0
2 43.36 -51.68 0 30.3490459 0 0
1 50 27.50 -89.01 0 19.2518592 0 0
cierre 0 0 0 0 0

0
Lnea 0 10 20 30 40 50 60 70
0 0
63.6132604 162.554414 M (tn-m)
CURVA de ITERACCION

Iteraccion Factorado
Linea

60 70
Story Story Pier Load Loc P
SEMOSOTANSOTANO1 P20 COMB1 Top -277.4
SEMOSOTANSOTANO1 P20 COMB1 Bottom -279.47
SEMOSOTANSOTANO1 P20 COMB2 MAXTop -229.62
SEMOSOTANSOTANO1 P20 COMB2 MAXBottom -231.46
SEMOSOTANSOTANO1 P20 COMB2 MIN Top -244.83
SEMOSOTANSOTANO1 P20 COMB2 MIN Bottom -246.68
SEMOSOTANSOTANO1 P20 COMB3 MAXTop -231.77
SEMOSOTANSOTANO1 P20 COMB3 MAXBottom -233.62
SEMOSOTANSOTANO1 P20 COMB3 MIN Top -242.68
SEMOSOTANSOTANO1 P20 COMB3 MIN Bottom -244.52
SEMOSOTANSOTANO1 P20 COMB4 MAXTop -130.23
SEMOSOTANSOTANO1 P20 COMB4 MAXBottom -131.56
SEMOSOTANSOTANO1 P20 COMB4 MIN Top -141.13
SEMOSOTANSOTANO1 P20 COMB4 MIN Bottom -142.46
SEMOSOTANSOTANO1 P20 COMB5 MAXTop -122.62
SEMOSOTANSOTANO1 P20 COMB5 MAXBottom -123.95
SEMOSOTANSOTANO1 P20 COMB5 MIN Top -148.74
SEMOSOTANSOTANO1 P20 COMB5 MIN Bottom -150.07
SOTANO1
SOTANO1
SOTANO1
SOTANO1
SOTANO1
SOTANO1
SOTANO1
SOTANO1
SOTANO1
SOTANO1
SOTANO1
SOTANO1
SOTANO1
SOTANO1
SOTANO1
SOTANO1
SOTANO1
SOTANO1
SOTANO2
SOTANO2
SOTANO2
SOTANO2
SOTANO2
SOTANO2
SOTANO2
SOTANO2
SOTANO2
SOTANO2
SOTANO2
SOTANO2
SOTANO2
SOTANO2
SOTANO2
SOTANO2
SOTANO2
SOTANO2
V2 V3 T M2 M3 M P
20.65 -0.86 0.069 1.252 -28.633 28.633 277.4
20.65 -0.86 0.069 -1.334 33.323 33.323 279.47
31.3 -0.66 0.067 1.173 -3.173 3.173 229.62
31.3 -0.66 0.067 -0.989 48.344 48.344 231.46
3.87 -0.82 0.051 0.976 -45.546 45.546 244.83
3.87 -0.82 0.051 -1.296 8.448 8.448 246.68
18.3 -0.56 0.06 1.357 -23.202 23.202 231.77
18.3 -0.56 0.06 -0.883 29.375 29.375 233.62
16.87 -0.92 0.058 0.792 -25.517 25.517 242.68
16.87 -0.92 0.058 -1.403 27.417 27.417 244.52
10.5 -0.25 0.034 0.909 -12.328 12.328 130.23
10.5 -0.25 0.034 -0.401 16.865 16.865 131.56
9.08 -0.61 0.032 0.345 -14.643 14.643 141.13
9.08 -0.61 0.032 -0.921 14.907 14.907 142.46
24.21 -0.16 0.043 1.008 8.859 8.859 122.62
24.21 -0.16 0.043 -0.247 36.813 36.813 123.95
-4.63 -0.69 0.024 0.246 -35.829 35.829 148.74
-4.63 -0.69 0.024 -1.075 -5.041 5.041 150.07
HOJA DE METRADOS DE ESTRUCTURAS

Proyecto PIP MAYOR MEJORAMIENTO DE LOS SERVICIOS DE CULTURA, DEPORTE Y RECREACIÓN


EN EL PARQUE ZONAL HUÁSCAR DEL DISTRITO DE VILLA EL SALVADOR-LIMA
INFRAESTRUCTURA DEPORTIVA EN EL PARQUE ZONAL HUASCAR
Propietario MUNICIPALIDAD METROPOLITANA DE LIMA
SERVICIO DE PARQUES-SERPAR
Ubicación

Partida 04.00 CONCRETO ARMADO

04.01 Zapata
Descripción. Cant. Concreto m3 Encofrado m2

Largo Ancho Altura Subtotal. Cant Largo Alt/Anch.

100 25.00

65 20.00
a b c
24.00 65 10.00

a b c
65.00 65 10.00

120 25.00

100 25.00

85 20.00
a b c
40.00 85 10.00

a b c
85.00 85 10.00

120 25.00
Total m3 214.00 m2

04.02 Muro de contension


Descripción. Cant. Concreto m3 Encofrado m2

Largo Ancho Altura Subtotal. Cant Largo Alt/Anch.

1-1 1 37.56 0.25 3.05 28.64 2 37.56 3.05

2-2 1 50.44 0.20 3.70 37.33 2 50.44 3.05

Total m3 65.97 m2

04.03 Columnas
Descripción. Cant. Concreto m3 Encofrado m2

Largo Ancho Altura Subtotal. Cant Largo Alt/Anch.

C-1 14 3.24 0.25 0.35 3.97 14 3.24 1.20


14
14

C-2 14 6.70 0.25 0.35 8.21 14 6.70 1.20


14
14

Total m3 12.18 m2

04.04 Vigas
Descripción. Cant. Concreto m3 Encofrado m2
Largo Ancho Altura Subtotal. Cant Largo Alt/Anch.

PORTICO-1 14 Area: 3.38 0.30 14.20 3.38 2.00 0.30


14
14
14

Viga Vd 1 50.44 0.33 0.65 10.82 50.44 2.25


1 50.44 0.77 0.15 5.83
1
1

Total m3 30.84 m2

04.05 Galerias
Descripción. Cant. Concreto m3 Encofrado m2

Largo Ancho Altura Subtotal. Cant Largo Alt/Anch.

4 60 0.65 0.25 39 60 5.57


4 60 0.2 0.5 24

Total m3 63.00 m2
Acero Pieza Long Long Factor
total
Kg
Sub total. x elem. x pieza Total 1/4''

150.00 3/4'' 12 1.50 18 2.26 40.68

105.00 1/2'' 7 1.05 7.35 1.02 7.50

198.00 3/8'' 7 1.98 13.86 0.60 8.32

280.00 3/8'' 8 2.80 22.4 0.60 13.44

170.00 3/8'' 12 1.70 20.4 0.60 12.24

150.00 3/4'' 12 1.50 18 2.26 40.68

125.00 1/2'' 7 1.25 8.75 1.02 8.93

270.00 3/8'' 7 2.70 18.9 0.60 11.34

360.00 3/8'' 7 3.60 25.2 0.60 15.12

170.00 3/8'' 12 1.70 20.4 0.60 12.24


1,978.00 Kg 170.48 -

Acero Pieza Long Long Factor


total
Kg
Sub total. x elem. x pieza Total 1/4''

229.12 5/8'' 187.8 3.95 741.81 1.65 1,223.99


1/2'' 187.8 3.95 741.81 1.02 756.65
1/2'' 26 38.06 989.56 1.02 1,009.35

307.68 1/2'' 252.2 4.50 1134.9 1.02 1,157.60


1/2'' 252.2 4.50 1134.9 1.02 1,157.60
3/8'' 30 50.94 1528.2 0.60 916.92

536.80 Kg 6,222.10 0.00

Acero Pieza Long Long Factor


total
Kg
Sub total. x elem. x pieza Total 1/4''

54.43 1/2'' 6 4.22 354.48 1.02 361.57


3/8'' 26 0.70 254.8 0.60 152.88
3/8'' 26 0.70 254.8 0.60 152.88

112.56 1/2'' 6 7.56 635.04 1.02 647.74


3/8'' 52 0.70 509.6 0.60 305.76
3/8'' 52 0.70 509.6 0.60 305.76

166.99 Kg 1,926.59 -

Acero Pieza Long Long Factor


total
Kg
Sub total. x elem. x pieza Total 1/4''

111.44 1/2'' 2 5.76 161.28 1.02 164.51


1/2'' 2 5.76 161.28 1.02 164.51
3/8'' 40 1.20 672 0.60 403.20
3/8'' 5 2.35 164.5 0.60 98.70

113.49 5/8'' 4 50.94 203.76 1.65 336.20


3/8'' 8 50.94 407.52 0.60 244.51
3/8'' 336.266666666667 1.70 571.65333333333 0.60 342.99
3/8'' 336.266666666667 2.31 776.776 0.60 466.07

224.93 Kg 2,220.68 0.00

Acero Pieza Long Long Factor


total
Kg
Sub total. x elem. x pieza Total 1/4''

334.2 5/8'' 16.00 60.25 964.00 1.65 1,590.60


3/8'' 34.00 60.25 2,048.50 0.60 1,229.10
3/8'' 400.00 1.60 640.00 0.60 384.00
1/4'' 400.00 2.15 860.00 0.25 215.00 215.00

334.20 Kg 3,418.70 215.00


3/8'' 1/2'' 5/8'' 3/4'' 1 ''

40.68

7.50

8.32

12.24

40.68

8.93

11.34

15.12

12.24
59.26 16.42 - 81.36 - 157.04 0.73

3/8'' 1/2'' 5/8'' 3/4'' 1 ''

1,223.99
756.65
1,009.35

1,157.60
1,157.60
916.92

916.92 4,081.19 1,223.99 0.00 0.00 6,222.10 94.32

3/8'' 1/2'' 5/8'' 3/4'' 1 ''

361.57
152.88
152.88

647.74
305.76
305.76

917.28 1,009.31 - - - 1,926.59 158.22


3/8'' 1/2'' 5/8'' 3/4'' 1 ''

164.51
164.51
403.20
98.70

336.20
244.51
342.99
466.07

1,555.47 329.01 336.20 0.00 0.00 2,220.68 72.003839020531

3/8'' 1/2'' 5/8'' 3/4'' 1 ''

1,590.60
1,229.10
384.00

1,613.10 - 1,590.60 - - 3,418.70 54.265079365079