ATEX Certifacation

ATEX certification is given to equipment that has gone through rigorous testing outlined by European Union d
ATEX compliant have been proved safe to use in specific environments with explosive atmospheres, accordi
certified to be used in.

SPARE PARTS
Set of spares for all pumps, as recommended by the respective manufacturer/vendor for regular reliable operation of min
Vendor shall advise the commissioning and two years operating spares, and complete the relevant forms.

Required Documentation
Recommended control scheme/ logic diagram
_x0002_ Process manuscript for implementation in DCS
_x0002_ List of Drives ( Solenoid valves etc)
_x0002_ I/O list (DCS)
_x0002_ GA & wiring diagram of local panel.
_x0002_ Power requirement.
_x0002_ Local control panel and field instruments quality plan.
_x0002_ Local control panel & instruments data sheet.
_x0002_ JB grouping document.
_x0002_ Cable schedule and cable interconnection drawing.
_x0002_ Instrument schedule
_x0002_ Alarm Schedule
_x0002_ SOE schedule
_x0002_ Instrument hook-up diagram.
_x0002_ Mandatory spare BOQ
_x0002_ UPS load list
_x0002_ Any other document decided during detailed engineering

Insulatoin
If specified, personnel protection hot insulation shall be applied to all parts that are exposed to contact with persons durin
If specified, frost protection or wax formation protection heat tracing and insulation shall be applied to all necessary parts
Where such insulation is required, insulation shall comply with the requirements specified on the data sheet. The vendor s
Performance / Mechanical Guarantee
The VENDOR shall have the final and total responsibility for the design and performance of all equipment supplied under t
The VENDOR shall provide a mechanical and performance guarantee for the equipment. The guarantee terms are covered
fabrication/suuply contract document. In addition to these terms, the VENDOR guarantee shall cover a period of 12 month
commissioning of the completed system by the OWNER or 18 months
after shipment, whichever is longer. The guarantee shall cover both, the supply of material, design and manpower to make
defect for all equipment and components. VENDOR shall also guarantee the following: 􀁸 Supply of spares and upgrades fo
years (after sale services) 􀁸 Hardware and Software Services for at least one year after Commissioning
Pumps Parts
ined by European Union directives. Products that are Norrmal Wear parts
sive atmospheres, according to the zone/s they are
Wear rings
Inter-stage bushings
Balancing device
Throat bushing
Seal faces
Bearings
Gaskets

r reliable operation of minimum two (2) years. vendor is to develop recommended list of spare parts.

contact with persons during control and routine maintenance operations.


plied to all necessary parts to maintain all the equipment in its normal operating state when the pump is on standby.
e data sheet. The vendor shall provide sufficient stand-offs and clearance from the insulated surface throughout for pipe flanges, valve

quipment supplied under this specification.


arantee terms are covered under the
cover a period of 12 months after the

gn and manpower to make good of any


of spares and upgrades for at least 10
oning
hout for pipe flanges, valves and all instrument equipment to allow the fitment of the insulation and access for maintenance. Surface c
or maintenance. Surface coatings under insulation shall comply with the requirements specified on the data sheet