Erection Sheet -1

Component: Draft Tube (DT)


Unit :I
Center point :

SN Dimension As per. Dwg. Measured Deviations Remarks


1 X-X
2 Y-Y
3 1042.21

*** The marked with cross sign are measurement locations


during erection
*** Referred drawings are
SN Work Start date Duration
1 Lowering of bottom ring ; alignment 20-Jan 4
Lowering of guide vanes; top cover ;alignment; gap 7
2 checking and adjustment; dowelling 25-Jan
3 Removing of SN2 2-Feb 1 Lowering of guide vanes; top cover
4 Lowering LGB ; alignment 3-Feb 3
5 Lowering stator ; alignment 6-Feb 5
6 Lowering UGB ; alignment ; Dowelling 11-Feb 5
7 Rotor transferring to service bay 16-Feb 1
8 Bearing pad scarapping 17-Feb 4

44581.00
Chart Title
20-Jan 30-Jan 9-Feb 19-Feb 1-Mar
Lowering of bottom ring ; alignment

Lowering of guide vanes; top cover ;alignment; gap checking and adjustment; dowelling

Removing of SN2 Start date


Duration
Lowering LGB ; alignment

Lowering stator ; alignment

Lowering UGB ; alignment ; Dowelling

Rotor transferring to service bay

Bearing pad scarapping


X Y
7 8 1 2 3 4 5 6 7 1 2 3 4 5 6
UGB 0 -1 -1 -1 0 0 0.5 0.5 0 0 0 0 0 0.5 1
LGB 0 1 3 3 1 1 -2 -2 0 0 -2.5 -3.5 -5 -6 -7
0 2 4 4 1 1 -2.5 -3 0 0 -2.5 -3.5 -5 -6.5 -8
Y
7 8 1
1 0 0
-7 -5 -2
-8 -5 -2