QSP-002
Waterfront Integrated Resort
Rev. No E
TABLE of CONTENTS
1.0 PURPOSE
2.0 SCOPE
3.0 DEFINITIONS
4.0 REFERENCE
5.0 RESPONSIBILITY
6.0 PROCEDURE
7.0 ATTACHMENT
Noted.
HKN will follow the
Ensure shop drawing revisions traceability is not proposed drawing
5. numbering format once -
compromised due to proposed change (level).
received the approval for
HKN-PRC-QA-
0002_Rev.E.
The disciplines are not alighted with HDCE-PRC-PM- Disciplines & work Codes
6. 15,16
0001 and current practice e.g. LE and FR. has updated.
2.0 SCOPE
2.2 All document control will be implemented in accordance with project administration
requirements.
3.0 DEFINITIONS
3.1 Document
Information and its support medium, such as HKN JV quality management plan, quality
procedure, method statement, ITP, process map, records, specification, drawing, report
and standard, etc.
The medium may be paper, electronic or optical computer disc, photograph or master
sample, or a combination thereof.
3.7 HKN JV
HYUNDAI-KEANGNAM-NAWALOKA Joint Venture
4.0 REFERENCE
4.1 HKN JV Project Quality Management Plan
4.2 Quality System Procedure QSP-006 Non Conformance Product Control
4.3 Document management Requirements of project administration requirements
4.4 Aconex Project Configuration HDEC-PRC-PM-0001
4.5 Quality System Procedure QSP-011 Shop Drawing numbering
4.6 Contract document Particular Conditions Clause 1.16 Information and Documents
Doc. No. QSP-002
Waterfront Integrated Resort
Rev. No E
5.1 The Project Director shall approve the HKN JV Project quality Management Plan.
5.3 Construction manager and safety manager also may review or approve the method
statement.
5.4 The document generating section is responsible for distributing the documents to all
section where activities essential to the effective functioning of the quality system are
performed.
5.6 The Sub-Contractor is responsible for creating documents and submitting to HKN for
review. They are also responsible for ensuring that only approved documents are being
used on site.
Doc. No. QSP-002
Waterfront Integrated Resort
Rev. No E
6.1.1 The documents affecting quality to be controlled according to this procedure are as
follows, but not limited to;
● HKN JV Project Quality Management Plan, Quality System Procedure, Method
Statement, NCRs, PCARs, ITP, checklists etc.
● Contract Documents
● Drawings & Specification
● Contractor issued document, such as submittals, RFI etc. thru ACONEX.
6.2 Identification
6.2.1 Each document shall have the title, the revision number and its date.
6.2.2 The documents to be controlled shall be identified with a unique document number on the
cover sheet.
6.2.3 Documents on the project shall be identified and numbered in accordance with HKN JV
document numbering system and project numbering system established by EMP / ENG.
6.3.1 All quality affecting documents shall be reviewed, approved and issued in accordance
with the relevant project procedures (and this procedure as supplementary) by the
relevant departments.
Doc. No. QSP-002
Waterfront Integrated Resort
Rev. No E
Status A Approved
Status B Approved with Comments
Status C Revise and Resubmit
Status D Rejected
All documents used for construction purposes should be ‘Issued For Construction’
Issued for Approval: Issuing documents that require approval from authorised project
participants.
Issued for Construction: Documents that are used for Construction purposes.
Issued for Information: Documents that are to be used for information purposes.
Issued for Review: Documents that require review by another project participant.
Issued for Tender: Documents that are to be used for tendering purposes.
6.4 Distribution
6.4.1 The approved documents and drawings shall be distributed to the relevant departments
within the HKN JV and Sub-contractors using the copy of transmittal (through Aconex)
and/or network (HKN JV Server) for application and use.
6.4.2 Upon receipt of documents, the recipient shall destroy the obsolete documents or keep
the documents with positive identification stamping (e.g. ‘VOID’).
6.4.3 Only the latest documents Issued “For Construction” shall be used for construction work.
6.4.4 Design documentation shall not be transmitted across Sri Lankan boarders in physical
form (has to be emailed, etc.)
Doc. No. QSP-002
Waterfront Integrated Resort
Rev. No E
6.5.1 Changes to the documents shall be reviewed and approved by the same organizations
that performed the original review and approval unless specifically designated otherwise.
6.5.3 All obsolete copies shall be destroyed or suitably identified as per paragraph 6.4.2 of this
procedure by the recipient to assure that the use of outdated documents is precluded.
6.5.4 The revised documents shall be distributed in the same manner as the original.
6.6.1 All documents shall be clearly identified with the relevant code, revision and type of issue.
6.6.2 Originals and copies of all project documentation (produced by the various parties) are
coded and filed according to the internal filing system which is established.
6.6.3 Records of correspondence and documentation are kept and timely updated.
6.6.4 The document issued for approval shall be maintained on a computerized database of
document numbers and identification, to avoid future duplications.
6.6.5 The respective document controller shall produce and maintain a document register in
accordance with the requirements of the contract.
Doc. No. QSP-002
Waterfront Integrated Resort
Rev. No E
※ All drawings except for vendor drawing shall include HKN JV document numbering in the
following format:
HKN - □□□ – OO - XX – 0 0 0 0 0 - A
Doc. Type :
DWG : Drawing
SPD : Shop Drawing
Etc.
Discipline:
ST – Structural
AR – Architectural
EL – Electrical
ME – Mechanical
PB – Plumbing
Etc.
Work Code :
ER : Earth
DR : Door
DW : Drywall
DT : Duct
Etc.
Serial Number :
5 (Five) digit numbering
“0 0 0 0 0”
Serial Number
Drawing Series
Building No.
Revision :
A, B, C …. Z, AA, AB ….
Doc. No. QSP-002
Waterfront Integrated Resort
Rev. No E
HKN-SPD-AR-DW-0 00 00 A1
Project Code
AconexDocument Type
Discipline
Work Code
Building No
Drawing Series
Serial Number
Rivision
HKN-SPD-FA-FC-0 A 0 000 A1
Project Code
AconexDocument Type
Discipline
Work Code
Building No
Façade Type
Drawing Series
Serial Number
Rivision
Doc. No. QSP-002
Waterfront Integrated Resort
Rev. No E
HKN-SPD-ID-FN- PL20000A1
Project Code
Aconex Document type
Discipline
Work Code
Dwg. Classification
Building
Level
Sheet Nos.
Revision
HKN-SPD-ID-FN SK01A501A1
Project Code
Aconex Document type
Discipline
Work Code
Guestroom Unit
Guestroom Variation
Drawing Classification Serial No.
Sheet Nos.
Revision
HKN-SPD-ID-FN 200000-00 A1
Project Code
Aconex Document type
Discipline
Work Code
Building
Level
Room Name/No.
Sheet Nos.
Revision
Doc. No. QSP-002
Waterfront Integrated Resort
Rev. No E
HKN-SPD-EL-CC-0 00 0000 A1
Project Code
AconexDocument Type
Discipline
Work Code
Building No
Level
Serial Number
Rivision
HKN-SPD-EX-WR-0 00 00 A1
Project Code
AconexDocument Type
Discipline
Work Code
Building No
Drawing Series
Serial Number
Rivision
Doc. No. QSP-002
Waterfront Integrated Resort
Rev. No E
HKN-Document Type (SPD)-Discipline (CD)-HKN Work Trade- 05 Digit Drawing No.Rev.No. CC Conduit Coordination SB Sub Station
Example: Combined Services Shop Drawing HKN-SPD-CD-20204, in case of services and
CP Combined Plan BB Bus Bar
box-out drawings: HKN-SPD-CD-BS-20014
Façade Drawings CT Cable Tray FF Fire Commanding Center
Format DB Single Line Diagrams CM Carbon Monoxide
HKN Document Type (SPD)-Discipline (FA)-Work Code(FC)-Building No-Facade Type-
DG Diesel Generator BW Block Wall (Conduits)
Drawing Series (0-7)-Serial No (03 digits).Rev. No.
Example: Shop Drawing Façade Construction Drawing, Building 4,Type RT, Drawing
Series (Plan),Serial (03 digit).Rev.No ML Material List (Façade) OE Outlets & Equipment
HKN-SPD-FA-FC-4RT1007 B
Façade Type
BD 5: RT,P
BD 1: D,D',P,CO CJ Plan: HKN-SPD-CN-CF-0000000 A1
BD4: RT,P
BD 2: A,A',B,C,C',E.F,G,H'I,S Block Form: HKN-SPD-CN-MS-0000000 A1
BD6: OT,P
BD3: PO,P, K,T
Drawing Series 4: Partial Elevation, Plan, Section (mixed)
0: General 5: Partial Plan or Partial Section (Each)
1: Plans 6: Section Details
2: Elevations 7: Embedment
3: Sections
Doc. No. QSP-002
Waterfront Integrated Resort
Rev. No E
HKN-ABD-AR-DW-0 00 0000 A1
Project Code
AconexDocument Type
Discipline
Work Code
Building No
Level/Façade Type
Serial Number
Rivision
※ All Documents except for vendor documents shall include HKN JV document numbering in the
following format:
Doc. Type :
MST : Method Statement
MSB : Material Approval Request
TRP : Test Report
NCR: Non-Conformance Report
Etc.
Discipline :
ST – Structural
AR – Architectural
EL – Electrical
ME – Mechanical
PB – Plumbing
CN – Construction
Etc.
Serial Number :
4(four) digit numbering
0001, 0002, 0003, ……
Doc. No. QSP-002
Waterfront Integrated Resort
Rev. No E
Year
Department Code :
AD – Administration
CNST – Construction
EL – Electrical
ME – Mechanical
ENGR – Engineering
HS – Safety
PLAN – Planning
Etc.
Doc. Type :
MST : Method Statement
MSB : Material Approval Request
Doc. No. QSP-002
Waterfront Integrated Resort
Rev. No E
Reviewed by:
Name: HKN JV
Role: *Manager
(Site Coordinator)
Signed:
Date:
Name: HKN JV
Role: *Manager
(QA/QC Manager)
Signed:
Date:
Name: HKN JV
Role: *Manager
(Site Project Manager)
Signed:
Date:
The signed original of this page is retained by the issuing team.
Version History
Version Date Status Changes Overview
Table of Contents
Form @ QSP-002
Doc. No. QSP-002
Waterfront Integrated Resort
Rev. No E
Revise Document
Use Approved
Create Document According to
Document
Comments
Check Conformance
ok ok Approved
HKN
ok
Aconex
Document reviewed
by the Engineer
Notes:
- The process depicted above is a general process, which mainly shows how the document process is used to cascade information within HKN, to Sub-contractors as well as to the Engineer.
- "HKN" mentioned above refers to the relevant department within HKN (i.e. Construction, Mechanical, Electrical, QA/QC, Planning, etc.).
- "Document" mentioned above refers to all types of documents used on this project (i.e. Drawings, Method Statements, Material Approvals, etc.).
- The department in charge of the steps checking conformance, preparation and review depend on the type of document that is being prepared.
- All quality related documents will be reviewed by the QA/QC department.
- The final step of issuing a document "For Construction" only applies to shop drawings.
Doc. No. QSP-002
Waterfront Integrated Resort
Rev. No E
Revise Drawing
Approved As
Create Drawing According to
Built Drawing
Comments
Not Ok
Not Approved
Review
for submission Comments
Ok
Drawing Status
Submission via "As Built"
sent Via Aconex
Aconex via Aconex
Ok
Engineer
Drawing Review
By the Engineer
Notes:
- The "AS Built" drawing shall be agreed/ signed by the HKN Design Manager.