Professional Documents
Culture Documents
QSP-003
Waterfront Integrated Resort
Rev. No. 0
FOR
TRAINING
Initial Release
0 Oct.31, 2013 S. Y. Yi S. Y. Yi J. W. Ko
( Issued for Approval )
REV.
REV. DATE REVISED PAGE DESCRIPTIONS OF REVISION
NO.
0 Oct. 31, 2013 All Pages Initial Release (Issued for Approval)
Doc. No. QSP-003
Waterfront Integrated Resort
Rev. No. 0
TABLE of CONTENTS
1.0 PURPOSE
2.0 DEFINITIONS
3.0 REFERENCE
4.0 RESPONSIBILITY
5.0 PROCEDURE
6.0 ATTACHMENT
Doc. No. QSP-003
Waterfront Integrated Resort
Rev. No. 0
This procedure describes the requirements for training of all personnel performing activities
affecting quality.
2.0 DEFINITIONS
2.2 HKN JV
Hyundai-Keangnam-NAWALOKA Joint Venture
2.3 Owner
Waterfront Properties Ltd./Balmond-Studio
3.0 REFERENCE
4.0 RESPONSIBILITY
5.0 PROCEDURE
5.1 General
5.1.1 Training shall be implemented in accordance with Quality assurance and audit plan.
5.1.2 Appropriate records of training shall be maintained in accordance with quality system
procedure QSP-009 Quality Record Control Procedure.
5.2 Planning
5.2.1 Annual Training Schedule(This procedure QSP-003, QSP-003-01) shall be established based
on the following.
● Increase of individual responsibility/job engagement.
● Implementation of new regulations/policies.
● Major changes are introduced into the Quality Systems.
● New Technology, Machinery/Equipment are introduced.
● New Recruitment
● Request from Owner, If necessary.
5.3 Training
5.3.1 QC Personnel responsible for inspection, examination and testing shall be sufficiently trained
in the following areas to assure their competence in performing the assigned works.
● Quality elements that are to be employed.
● Technical objectives of the project and code & standards that are to be used.
● On-the-job experience through actual performance of processes and inspection.
● General employee training.
● Document control and records management.
● Measuring and test equipment.
● Cleanliness and housekeeping inspection.
● Certification, that required training has been completed, will be provided for each
QC staff
5.3.2 The work methods, quality system procedures and project quality management plan may be
used during the orientation as a training manual.
5.4 Documentation
Doc. No. QSP-003
Waterfront Integrated Resort
Rev. No. 0
5.4.1 All the records related to the training of all staff and workers shall be documented and
maintained on file at respective office.
5.4.2 Training Attendance Roster (This procedure QSP-003, QSP-003-02) will be used whenever
the training is performed.
5.5.1 Persons performing the specific tasks affecting quality (e.g. Quality Auditor, Welders) shall be
qualified in accordance with the requirements specified in the relevant project specification and
procedures.
5.5.2 Qualification process shall be witnessed by Customer and the relevant documents shall be
submitted to Customer for review or approval.
6.0 ATTACHMENT
1 2 3 4 5 6 7 8 9 10 11 12
TITLE : Quality System Procedure for Training
Waterfront Integrated Resort
HYUNDAI-Keangnam-NAWALOKA JV
Rev. No.
Doc. No.
Sheet No.
Prepared by : Approved by :
0
Sh. 7 of 8
Form QSP-003-01
Doc. No. QSP-003
Waterfront Integrated Resort
Rev. No. 0
Form QSP-003-02