You are on page 1of 1

Notes :

1. ALL WORK TO BE DONE IN ACCORDANCE


WITH ALL APPLICABLE CODES AND AGENCIES
HAVING JURISDICTION . IT IS THE
CONTRACTOR'S SOLE RESPONSIBILITY TO
FOLLOW ALL APPLICABLE SAFETY CODES AND
A B C D E 4 3 3 2 2 1 REGULATIONS DURING ALL PHASES OF
CONSTRUCTION.
2. THE CONTRACTOR SHALL VERIFY ALL
DIMENSIONS, ELEVATIONS OF DRAWINGS AND
EXISTING CONDITIONS BEFORE PROCEEDING
WITH ANY WORK.
3. THE CONTRACTOR SHALL NOTIFY THE
ARCHITECT
OF ANY CONFLICT OR DISCREPANCY
DISCOVERED BETWEEN THE DRAWINGS AND
ACTUAL CONDITIONS ENCOUNTERED ON THE
SITE.
4. CONSTRUCTION SHALL NOT PROCEED
UNTIL
CORRECTIONS HAVE BEEN MADE AND
RELATED
PLANS OR CLARIFICATIONS HAVE BEEN RE -
ISSUED. CONSTRUCTION CAN ONLY BEGIN
AFTER THE ISSUE(S) HAS BEEN RESOLVED.
5. DRAWING DIMENSIONS ARE EITHER FROM
THE FACE OF OR FROM THE CENTER OF,
MASONRY WALLS, RING BEAMS, RAFTERS AND
TRUSSES. SPECIAL ATTENTION MUST BE MADE
TO THE LOCATION OF EACH DIMENSION LINE.
THIS IS CRITICAL SINCE IT MAY VARY .
6. EXTERIOR SLABS, AND WALKWAYS WILL BE
SLOPED AT

1,000
3,230 1,430 3,730 1,214

3,500 3,330 3,500 3,230


E-A4
1:50
E-A1
1:50

Rev. Date Description


Revisions :

E D C B A 1 2 2 3 3 4 4
Client :

+9,000
Project title :

+6,000

+3,000
Building Trade :
Architectural Drawings

Drawing title :
COVER PAGE

±0
-450 Date of Issue :

07/06/2022
3,230 3,500 3,330 3,500
Drawn by:
ACS

1,214 1,000 3,730 1,430 3,230 2,410 Checked by:


LB
E-A3
1:50
E-A2 Approved by:
1:50

Scale : Paper size :


As Shown A0
Job Number : Drawing Number :

You might also like