Classification: PUBLIC Use

Preliminary Acceptance Test

PAT for Business Switch


ATN910C HUAWEI

Issued: 28-Feb-2022
Version: 2.1

PAT Reference

ERICSSON OUTDOOR
SED No.: W-3462-ATN-01-EXP(REL)-01 Rack Location:
CABINET
Project Name / No.: Saudi Mobily Intelligent Transport Network Project 2018
W-3462-ATN-01-
Job No.: District: West City: Makkah
EXP(REL)-01
Site No.: WR_3462 Site Coordinates: 39.860200 , 21.423900

Mobily TAG No.: 1831870

Shelf Serial No.: 2102350TKK10L4006824

PAT {ATN910C} {Huawei} Page 1 of 41

PUBLIC
Classification: PUBLIC Use

Document Control Reference

Version Date Comments Author


1.0 17-Sep-2018 Initial Song Wei

1.1 17-Feb-2019 Modified OIL sheets for Field and NOC Rehan Amjad
Updated the 4.1.2 ATN910C Router VRP Software
1.2 11-Jul-2019 Version (NOC)
Rehan Amjad

1.3 17-Nov-2019 Add BIDI SFP Rehan Amjad


Updated the 4.1.2 ATN910C Router VRP Software
1.4 26-Nov-2019 Version (NOC)
Rehan Amjad

1.5 08-Dec-2019 Add BIDI sensitivity test and new SFP types Rehan Amjad

1.6 10-Dec-2019 Update process for BIDI sensitivity test Rehan Amjad

1.7 24-Dec-2019 3.7 test case updated for POP site RX test Rehan Amjad

1.8 24-Feb-2020 Added TAG numbers Rehan Amjad

1.9 09-Feb-2021 Update new ATN model ATN910C-G Edward

2.0 03-Oct-2021 Update new ATN model ATN910C-M Edward

2.1 28-Feb-2022 Update 4.1.8 V-shape switchover testing Edward

Document Approval Reference

Name Designation Department Signature Date


Transport Products & IoT
Turki H. Al-Mutairi Technical Solutions 28-Feb-2022
Senior Specialist Manager

Adnan Farid Chief Engineer Technical Solutions 28-Feb-2022

PAT {ATN910C} {Huawei} Page 2 of 41

PUBLIC
Classification: PUBLIC Use

Project Name: Saudi Mobily ITN Project SED No: W-3462-ATN-01-EXP(REL)-01 City/District:
Makkah/West
Site Code: WR_3462 Job No.: W-3462-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3462-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A

Contents
1. INTRODUCTION ...............................................................................................................................4
1.1 SCOPE ..............................................................................................................................................4
1.2 EQUIPMENT, SUB-RACKS AND FIRMWARE ................................................................................5
1.3 LIST OF TEST EQUIPMENT’S USED DURING THIS PAT .............................................................5
2. LIST OF TEST CASES .....................................................................................................................6
Detail Test description ...........................................................................................................................6
3. HARDWARE ACCEPTANCE TEST .................................................................................................7
3.1 ATN910C PANEL .............................................................................................................................7
3.2 SITE ACCEPTANCE QUALITY CHECK LIST .................................................................................9
3.3 BILL OF QUANTITIES AVAILABLE AS PER SITE ......................................................................14
3.4 POWER MODULE REDUNDANCY TEST (FIELD) .......................................................................15
3.5 DC VOLTAGE AND GROUNDING TEST (FIELD).........................................................................16
3.6 INTERFACE TRANSCEIVER TX POWER VERIFICATION (FIELD) ............................................17
3.7 INTERFACE TRANSCEIVER RX POWER VERIFICATION (FIELD) ............................................19
3.8 OPTICAL MODULE RECEIVER SENSITIVITY TEST (FIELD) .....................................................21
3.9 BIDI OPTICAL MODULE RECEIVER SENSITIVITY TEST UPLINK (FIELD) ...............................23
3.10 SYSTEM REBOOT BY POWER OFF (FIELD) ...........................................................................25
4. SOFTWARE ACCEPTANCE TEST ................................................................................................26
4.1 SOFTWARE AND DEVICE STATUS .............................................................................................26
4.1.1 ATN910C CONFIGURATION VERIFICATION (NOC) ...............................................................26
4.1.2 ATN910C SWITCH VRP SOFTWARE VERSION (NOC) ...........................................................27
4.1.3 ATN910C DEVICE STATUS (NOC) ............................................................................................28
4.1.4 ATN910C SYSTEM CONFIGURATION CHECK (NOC) ............................................................29
4.1.5 ATN910C GATEWAY REACHABILITY TEST (NOC) ................................................................30
4.1.6 ATN910C SSH AND SECURITY TEST (NOC) ...........................................................................31
4.1.7 MBSS VERIFICATION (NOC) .....................................................................................................32
4.1.8 V-SHAPE PRIMARY/BACKUP SWITCHOVER TEST (NOC) ....................................................33
5. TEST RESULTS PARTICIPATION REFERENCE .........................................................................34
6. ACCEPTANCE TEST REPORT (FIELD) .......................................................................................35
7. OUTSTANDING ISSUES LIST (FIELD) .........................................................................................36
8. ACCEPTANCE TEST REPORT (NOC) ..........................................................................................37
9. OUTSTANDING ISSUES LIST (NOC) ............................................................................................38
10. TEST RESULTS SUMMARY ..........................................................................................................39
11. ABBREVIATIONS ...........................................................................................................................40

PAT {ATN910C} {Huawei} Page 3 of 41

PUBLIC
Classification: PUBLIC Use

Project Name: Saudi Mobily ITN Project SED No: W-3462-ATN-01-EXP(REL)-01 City/District:
Makkah/West
Site Code: WR_3462 Job No.: W-3462-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3462-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A

1. Introduction

1.1 Scope
This document presents the Preliminary Acceptance Test prerequisites, test procedure according to Mobily
and Huawei Tech. Inv. Saudi Arabia standards. The following diagram shows the topology of ATN.

PAT {ATN910C} {Huawei} Page 4 of 41

PUBLIC
Classification: PUBLIC Use

Project Name: Saudi Mobily ITN Project SED No: W-3462-ATN-01-EXP(REL)-01 City/District:
Makkah/West
Site Code: WR_3462 Job No.: W-3462-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3462-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A

1.2 Equipment, Sub-racks and Firmware

Name Version Quantity

ATN910C-B V300R005C10 1

ATN910C-G V300R006C10

ATN910C-M V300R021C00

1.3 List of Test Equipment’s used during this PAT


The analyzers that will be used during the test are listed below:

Brand
Test Equipment Model No Serial No Calibration Date
Name

Optical Power Meter JDSU OLP-35 AY-386 2020-02-28(3 Year)

Variable attenuator FAL KZJ-147 1472583 2020-02-28(3 Year)

PAT {ATN910C} {Huawei} Page 5 of 41

PUBLIC
Classification: PUBLIC Use

Project Name: Saudi Mobily ITN Project SED No: W-3462-ATN-01-EXP(REL)-01 City/District:
Makkah/West
Site Code: WR_3462 Job No.: W-3462-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3462-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A

2. List of Test Cases


Detail Test description

Test Categorization
Test Descriptions
No (SA/NSA)

3.2 Site Acceptance Quality Check List See QCC list


SA (exemption: accessories
3.3 Bill of Quantities Available As Per Site
e.g. grounding strap..etc.)
3.4 Power Module Redundancy Test SA

3.5 DC Voltage and Grounding Test (Field) SA

3.6 Interface Transceiver Tx Power Verification (Field) SA

3.7 Interface Transceiver Rx Power Verification (Field) SA

3.8 Optical Module Receiver Sensitivity Test (Field) SA

3.9 BIDI Optical Module Receiver Sensitivity Test uplink (Field) SA

3.10 System reboot by Power off (Field) SA

4.1.1 ATN910C Configuration Verification SA

4.1.2 ATN910C Switch VRP Software Version SA

4.1.3 ATN910C Device Status SA

4.1.4 ATN910C System Configuration Check SA

4.1.5 ATN910C Gateway Reachability Test SA

4.1.6 ATN910C SSH and Security Test SA

4.1.7 MBSS Verification SA

4.1.8 V-Shape Primary/Backup Switchover Test SA

PAT {ATN910C} {Huawei} Page 6 of 41

PUBLIC
Classification: PUBLIC Use

Project Name: Saudi Mobily ITN Project SED No: W-3462-ATN-01-EXP(REL)-01 City/District:
Makkah/West
Site Code: WR_3462 Job No.: W-3462-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3462-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A

3. Hardware Acceptance Test


3.1 ATN910C Panel
ATN910C DC Model

ATN910C AC Model

ATN910C-G DC Model

ATN910C-G AC Model

ATN910C-M DC Model

PAT {ATN910C} {Huawei} Page 7 of 41

PUBLIC
Classification: PUBLIC Use

Project Name: Saudi Mobily ITN Project SED No: W-3462-ATN-01-EXP(REL)-01 City/District:
Makkah/West
Site Code: WR_3462 Job No.: W-3462-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3462-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A

ATN910C-M DC Model

Equipment Inventory

Site Name List of Equipment Quantity SN#


OSX001002.Optical Transceiver(SFP+,1310nm,10Gb/s,-
2
EM195300030583
8.2~0.5dBm,-12.6dBm,LC,SM,10km)
MB20321060463

W3462-IASW-HU01

PAT {ATN910C} {Huawei} Page 8 of 41

PUBLIC
Classification: PUBLIC Use

Project Name: Saudi Mobily ITN Project SED No: W-3462-ATN-01-EXP(REL)-01 City/District:
Makkah/West
Site Code: WR_3462 Job No.: W-3462-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3462-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A

3.2 Site Acceptance Quality Check List

Mechanical Installation Verification.


Objective: Hardware installation, rack, cable and fiber labeling is complete and to Vendors and customer
standards.
Item Result Categorization Issue
Topic Check content Reference
No Pass Fail NA (SA/NSA) Description
The installation position of racks,
subrack/chassis, ODF and DDF is
according to the site engineering design Approved Floor
1
and the vertical errors of the racks Plan
SA
should be less than 3mm. (vertical
slope).
The assembly of subracks, shelves, air
ramps, FPP, (chassis) are reliable and air
space is as per installation manual Installation
2
available for equipment sub racks (3 inch manual
SA
air space if not stated on the installation
A. Cabinet or Rack Installation

manual).
Racks fixed
All of the expansion bolts used to fix properly from
support (or foot) should be installed top and
firmly. Fixing screws and nuts (bolt) bottom
3 should be installed by the correct order. (according to SA
The installation holes of the support (or the installation
foot) are matched with expansion bolts manual/ITFM
perfectly. installation
guidelines)
The mechanical accessories of cabinet Installation
4
should be installed correctly manual
NSA
The movable accessories of the cabinet
should work normally. Doors locks, Fan Installation
5
tray, The cabinet key has to be attached Manual
NSA
and working well.
All connecting bolts in the cabinet are Installation
6
installed correctly and firmly Manual
NSA
The racks, sub racks or part of the racks
are not scratched or smeared or
7
distorted. This may be affecting the
NSA
equipment appearance.
The boards can be plugged and
unplugged smoothly (cards ejectors are
Installation
8 working normally). Its panel screws
Manual
SA
should have appropriate tightness if they
exist.

PAT {ATN910C} {Huawei} Page 9 of 41

PUBLIC
Classification: PUBLIC Use

Project Name: Saudi Mobily ITN Project SED No: W-3462-ATN-01-EXP(REL)-01 City/District:
Makkah/West
Site Code: WR_3462 Job No.: W-3462-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3462-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A

Item Result Categorization Issue


Topic Check content Reference
No Pass Fail NA (SA/NSA) Description
All of the inlet/outlet cable holes of the Reference
cabinet should be blocked out. The Manual,
width of gap should be less than 1.8 cm. Approved
9 The side of plastic inlet/outlet cable hole materials & NSA
A. Cabinet or Rack Installation

should be cut properly. Tidy and ITFM


Insulating and fireproof materials should Installation
be used. Guidelines
The antistatic wrist strap is existed &
10 inserted into the antistatic installation NSA
hole in the cabinet.
All of dummy plates (filler card) and
11 panels should be installed according to SED NSA
requirements & per the SED.
The sundries of redundant cable ties and Best Practice &
screws and other things should not exist ITFM
12
inside, or at the bottom, or on the top of Installation
NSA
the cabinet. Guidelines
As per the
The row and column labels of the approved
cabinet should be stuck in a clear and material,
13 tidy way. If there has a dashed box on Labeling NSA
the cabinet, labels should be stuck within Format & ITFM
it. Installation
Guidelines
Signals cables should be properly routed
without crossing the equipment Installation
14
ventilation holes, fan trays and power manual
SA
modules.
No breakage or rupture and
15 intermediate connector is found on the Best Practice SA
B. Installation of Signal Cables

signal cable or connectors


Cables should be tied with uniform
spacing and moderate tightness. Cable Installation
16 ties should be tied in a tidy way. Their manual &Best NSA
redundant/excess parts should be cut Practice
from their bottom.
Distribution of cables outside cabinet:
1. The cables should be distributed
without any crossing and bending.
2. Arranged and organized in the cable
tray without bending, and cables are not
overflow the tray.
3. When using the cable ladder, they
should be tied in rectangular beams. Installation
17 When the spacing between the cable Manual ,SED, SA
ladder and the top of the cabinet is more Best Practice
than 0.6 m, a cable ladder should be
added on the top of cabinet.
4. When several layers of cables are
distributed under the floor in an
overlapped way, their height should not
exceed 1/2 of the height of the space
below the raised floor.

PAT {ATN910C} {Huawei} Page 10 of 41

PUBLIC
Classification: PUBLIC Use

Project Name: Saudi Mobily ITN Project SED No: W-3462-ATN-01-EXP(REL)-01 City/District:
Makkah/West
Site Code: WR_3462 Job No.: W-3462-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3462-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A

Item Result Categorization Issue


Topic Check content Reference
No Pass Fail NA (SA/NSA) Description
If cables should be peeled off at the
position where they would be led out
18
from the sub-rack, they should be peeled
Best Practice SA
off in an orderly and proper way.
When the fiber is outside the cabinet, it
must be protected with Spiral Wrap,
routed away from the rack using proper
19 tie- down bar along the rack. Best Practice SA
Spiral/"hook-and-loop fasteners"
(Velcro) to be used inside the rack for
fibers.
When laying patch cords out site cabinet
fiber guides/trunk should be used and
SA
B. Installation of Signal Cables

20 Best Practice
the patch cords should be organized
properly inside the facility.
Fibers jumpers (FPP-to-FPP/ODF) are
Installation
routed using the right side of the cable
21
management facilities and fiber guides in
manual & Best SA
Practice
tidy and organized manner.
The “left side” of the ODF cable
Installation
management should be used for all
22
equipment termination (Equipment-to-
manual & Best SA
Practice
FPP/ODF)
Proper patch cords length should be
used to avoid fiber coils inside a cabinet
(should be coiled into a circle of more
than 8 cm before it is fixed if it is a must).
23
1meter is the maximum allowed excess
Best Practice SA
length and this should be properly
routed/coiled to avoid blocking airflow
or over utilizing space.
The patch cords connector should be
clean without any dust. The unused
24 optical fiber head and board optical port Best Practice NSA
should be covered with protection caps
(dust caps).
The cable labels are filled in and pasted
As per the
correctly and reliably. Their positions are
Approved
25 orderly and in the same uniform. Cable
Format &
NSA
labels should be stuck at the place 2cm
Materials
away from their connector.

For POP (UPE/CSG) physical connectivity


26
verification between OSP FPP to POP FPP
As per SED SA

PAT {ATN910C} {Huawei} Page 11 of 41

PUBLIC
Classification: PUBLIC Use

Project Name: Saudi Mobily ITN Project SED No: W-3462-ATN-01-EXP(REL)-01 City/District:
Makkah/West
Site Code: WR_3462 Job No.: W-3462-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3462-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A

Item Result Categorization Issue


Topic Check content Reference
No Pass Fail NA (SA/NSA) Description
DC Distribution Panel and the Fuse Unit is Installation
installed with correct rating, undamaged Manual/
27 & labeled. All installed fuses are functional approved SA
& its protection rating as per designated materials
load requirement. &format

The cable route of the power cable or


ground cable should be distributed and Installation
28 manual & Best SA
tied tidily, and should be connected in a Practice
correct and reliable way.
The diameter of the power cable, ground
Equipment
cable or equipment potential cable
29
between cabinets should meet the power
reference SA
manual
distribution requirement of equipment.
The power cable and grounding cable
applicable
30 must be without any connector in SA
C. Power and Ground Cabling

standards
between.
When the grounding cable and power Installation
cable is connected to the distribution box manual, F40,
31
or PDU/TRU/PDP, its redundant/excess F42 Guidelines
SA
part should be cut and cannot be coiled. & Best Practice
The power cable/ground cable should be
Installation
routed away from the signal cable outside
32
the cabinet at least it should be more than
manual & Best NSA
Practice
3 cm.
The color of power cables and ground
cables should be specified according to
the standard The –48V power cable is applicable
33
blue; the GND (BGND) ground cable is standards
SA
black (red), and the PGND protection
cable is yellowish green or yellow.
The bending position of the power cable
34
and ground cable should be smooth.
Best Practice NSA
When making lugs for the power and
ground cables, the lugs should be
Installation
soldered or crimped firmly. Lugs edge
manual, F40,
35 should touch the cable insulation, copper
F42 Guidelines
SA
shouldn't be visible and then crimped
& Best Practice
point should be covered with shrinking
tube.
The protection grounding cable of DDF
Installation
and ODF should be connected firmly.
36
Those between adjacent frames should be
manual & Best NSA
Practice
interconnected.(6mm2)
The ground cable of cabinet door should Installation
37 be connected in a correct and reliable manual & Best NSA
way。 Practice

PAT {ATN910C} {Huawei} Page 12 of 41

PUBLIC
Classification: PUBLIC Use

Project Name: Saudi Mobily ITN Project SED No: W-3462-ATN-01-EXP(REL)-01 City/District:
Makkah/West
Site Code: WR_3462 Job No.: W-3462-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3462-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A

Item Result Categorization Issue


Topic Check content Reference
No Pass Fail NA (SA/NSA) Description
D. General Environment of the site / C. Power and Ground

The power cable labels are filled in and


pasted correctly and reliably. Their
As per the
Cabling

positions are orderly and in the same


approved
38 uniform. Cable labels should be stuck at
material
NSA
the place 2cm away from their
&format
connector.(according the approved
material and format)

The floor gaps or tiles around the rack


Best Practice
should be blocked up. Discarded cable
39
ties, screws and other sundries should not
and ITFM NSA
Guidelines
be found under the floor.
Equipment Room

The equipment room should be clean and


40 tidy. Discarded packing materials should Best Practice NSA
be cleaned.

Loop patch cords, punching tools or other


41 O&M tools should be available in secured Best Practice NSA
area

Acceptance Engineer
Signature: Date:
Vendor:
Witnessing Project
Signature: Date:
Engineer Mobily:

Witnessing Engineer
Signature: Date:
O&M MNS/Mobily:

Remarks:

PAT {ATN910C} {Huawei} Page 13 of 41

PUBLIC
Classification: PUBLIC Use

Project Name: Saudi Mobily ITN Project SED No: W-3462-ATN-01-EXP(REL)-01 City/District:
Makkah/West
Site Code: WR_3462 Job No.: W-3462-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3462-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A

3.3 Bill of Quantities Available as Per Site

Bill Of Quantities Verification


Site: w3462-IASW-HU01 System ATN910C Software V300R005C10 (ATN910C-B)
V300R006C10 (ATN910C-G)
V300R0021C00(ATN910C-M)
Item Descriptions Item code Quantity TAG Numbers
Item Description Item Code Qty. TAG Numbers

OSX001002.Optical Transceiver(SFP+,1310nm,10Gb/s,- 1831870


OSX001002 2
8.2~0.5dBm,-12.6dBm,LC,SM,10km)

Acceptance Engineer
Signature: Date:
Vendor:
Witnessing Project
Signature: Date:
Engineer Mobily:

Witnessing Engineer
Signature: Date:
O&M MNS/Mobily:

Remarks:

PAT {ATN910C} {Huawei} Page 14 of 41

PUBLIC
Classification: PUBLIC Use

Project Name: Saudi Mobily ITN Project SED No: W-3462-ATN-01-EXP(REL)-01 City/District:
Makkah/West
Site Code: WR_3462 Job No.: W-3462-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3462-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A

3.4 Power Module Redundancy Test (Field)

Purpose To verify that the Switch has redundant power module and verify the actual redundancy
capability.
Setup
1. The switch provides redundancy backup for the power module.

Procedure 1. Turn off one power module or disconnect the power input
2. Observe the working status of the Switch.
3. Repeat the steps for another power module

Expected The redundant power module should take over the work of the primary power module
Results and the Switch should run stably.

Results Pass / Fail

Acceptance Engineer
Signature: Date:
Vendor:
Witnessing Project
Signature: Date:
Engineer Mobily:

Witnessing Engineer
Signature: Date:
O&M MNS/Mobily:

Remarks:

PAT {ATN910C} {Huawei} Page 15 of 41

PUBLIC
Classification: PUBLIC Use

Project Name: Saudi Mobily ITN Project SED No: W-3462-ATN-01-EXP(REL)-01 City/District:
Makkah/West
Site Code: WR_3462 Job No.: W-3462-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3462-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A

3.5 DC Voltage and Grounding Test (Field)

Purpose Confirm received normal power voltage and Grounding is healthy.

Setup None
Procedure 1. Use the multi-meter to connect the positive and negative terminal of the Power
Module to check the voltage value.
2. Before power on, check the grounding connectivity, including chassis to rack and
rack to grounding bus bar.

Expected 1. The voltage range is -38.4V DC ~ -72V DC, 100V to 240V AC


Results 2. Check the grounding connectivity status

Results See Tables 1: Power module voltage result.


See Tables 2: Grounding connectivity result.

Table 1: Power module voltage result

PEM Measured Voltage(V) Pass/Fail


Power Module 1
Power Module 2

Tables 2: Grounding connectivity result.

Grounding Connectivity Result


Between
(YES/NO)
Chassis to Rack
Rack to Grounding bus bar

Acceptance Engineer
Signature: Date:
Vendor:
Witnessing Project
Signature: Date:
Engineer Mobily:

Witnessing Engineer
Signature: Date:
O&M MNS/Mobily:

Remarks:

PAT {ATN910C} {Huawei} Page 16 of 41

PUBLIC
Classification: PUBLIC Use

Project Name: Saudi Mobily ITN Project SED No: W-3462-ATN-01-EXP(REL)-01 City/District:
Makkah/West
Site Code: WR_3462 Job No.: W-3462-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3462-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A

3.6 Interface Transceiver Tx Power Verification (Field)

Purpose Confirm the interface transceiver Power is within normal range.

Setup None

Procedure 1. Connect one end of the fiber patchcords to the TX optical interface of the optical
board/module to be tested through the assigned ODF/FPP(if ODF/FPP available)
and the other end to the test input port of the optical power meter (Note: Set
wavelength according to SFP module type).
2. Read the stable optical power value from the Optical Power Meter.
3. Record the result on Table 4: TX Power result.
4. The Expected Results show the reference value for Tx power.

Expected The actual TX power is within the normal range shown by detailed.
Results
SFP Transmit Power Range Model No.
10G-LC-SM-10KM -8.2 to +0.5 dBm OSX001002
10G-LC-SM-40KM -4.7 to +4 dBm OMXD30002
10G-LC-SM-80KM 0 to +4 dBm OSX080N04
10G-LC-MM-0.3KM -7.3 to -1 dBm OSX040N03
1G-LC-SM-10KM -9 to -3 dBm OSG010N05
1G-LC-SM-40KM -5 to 0 dBm OSG040002
1G-LC-SM-80KM -2 to +5 dBm Zx/FC100
1G-LC-MM-0.5KM -9.5 to 0 dBm Sx/FC200 MM
40G-LC-SM-10KM -7 to +2.3 dBm OSM010C02
100G-LC-SM-10KM 0 to +10.5 dBm OSN010N09
10G-LC-SM-10KM (BIDI) -8.5 to +0.4 dBm OSX010B10
10G-LC-SM-10KM (BIDI) -8.5 to +0.4 dBm OSX010B11
10G-LC-SM-40KM (BIDI) 0 to +5 dBm OSX040B02
10G-LC-SM-40KM (BIDI) 0 to +5 dBm OSX040B03
100G-LC-SM-30-40KM +3.5dBm to +8.9dBm OSN030N05
100G-LC-SM-10KM +1.7dBm to +10.5dBm OSN010N24
1G-LC-SM-40KM -2dBm to +3dBm OGEBIDI40

Note:
A. Not Applicable for collocated connections (NE to NE connection).

That means the test will be not be performed for the following:
1. Ports which are assigned as locally (collocated) or terminated to other
Router/Switch (locally connected).
2. Ports which are connected to Router/Switch installed on remote POPs via
collocated transmission equipment.
Results
See Table 4: TX Power Result.

PAT {ATN910C} {Huawei} Page 17 of 41

PUBLIC
Classification: PUBLIC Use

Project Name: Saudi Mobily ITN Project SED No: W-3462-ATN-01-EXP(REL)-01 City/District:
Makkah/West
Site Code: WR_3462 Job No.: W-3462-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3462-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A

Table 4: Tx Power Result:

Interface SFP type Expected value Measured value Pass/Fail


0/2/1 10G-LC-SM-10KM -8.2 to +0.5 dBm
0/2/3 10G-LC-SM-10KM -8.2 to +0.5 dBm

Acceptance Engineer
Signature: Date:
Vendor:
Witnessing Project
Signature: Date:
Engineer Mobily:

Witnessing Engineer
Signature: Date:
O&M MNS/Mobily:

Remarks:

PAT {ATN910C} {Huawei} Page 18 of 41

PUBLIC
Classification: PUBLIC Use

Project Name: Saudi Mobily ITN Project SED No: W-3462-ATN-01-EXP(REL)-01 City/District:
Makkah/West
Site Code: WR_3462 Job No.: W-3462-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3462-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A

3.7 Interface Transceiver Rx Power Verification (Field)

Purpose Confirm the Interface Transceiver Power is within normal range.

Setup None
Procedure Optical Ports connected to other equipment:

1. Remove the fiber patchcords to the RX optical interface of the optical board to be
tested and measure the input RX port using the optical power meter.
2. Read the stable optical power value from the Optical Power Meter.
3. Record the result on Table 5: RX Power result.
4. The Expected Results show the reference value for Rx power.

Expected
Results The Actual Rx measurement should be 3db greater than the minimum RX threshold.
SFP Received Power Range Model No.
10G-LC-SM-10KM -14.4 to +0.5 dBm OSX001002
10G-LC-SM-40KM -15.8 to -1 dBm OMXD30002
10G-LC-SM-80KM -24 to -7 dBm OSX080N04
10G-LC-MM-0.3KM -9.9 to -1 dBm OSX040N03
1G-LC-SM-10KM -20 to -3 dBm OSG010N05
1G-LC-SM-40KM -23 to -3 dBm OSG040002
1G-LC-SM-80KM -23 to -3 dBm Zx/FC100
1G-LC-MM-0.5KM -17 to 0 dBm Sx/FC200 MM
40G-LC-SM-10KM -13.7 to 2.3 dBm OSM010C02
100G-LC-SM-10KM -4 to +10.5 dBm OSN010N09
10G-LC-SM-10KM (BIDI) -14.4 to +0.5 dBm OSX010B10
10G-LC-SM-10KM (BIDI) -14.4 to +0.5 dBm OSX010B11
10G-LC-SM-40KM (BIDI) -18 to -9 dBm OSX040B02
10G-LC-SM-40KM (BIDI) -18 to -9 dBm OSX040B03
100G-LC-SM-30-40KM -15.4dBm to +2.5dBm OSN030N05
100G-LC-SM-10KM -2.6dBm to +10.5dBm OSN010N24
1G-LC-SM-40KM -23dBm to -3dBm OGEBIDI40

Note:

• Need to check RX power with power meter on POP site up till FPP once FTTM
ATN connected to UPE/CSG.

A. Not Applicable for collocated connections (NE to NE connection).

That means the test will be not be performed for the following:
1. Ports which are assigned as locally (collocated) or terminated to other
routers/Switch (locally connected).
2. Ports which are connected to routers/Switch installed on remote POPs via
collocated transmission equipment.

PAT {ATN910C} {Huawei} Page 19 of 41

PUBLIC
Classification: PUBLIC Use

Project Name: Saudi Mobily ITN Project SED No: W-3462-ATN-01-EXP(REL)-01 City/District:
Makkah/West
Site Code: WR_3462 Job No.: W-3462-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3462-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A

Results
Please refer to Table 5: RX Power Result.

Table 5: Rx Power Result:

Interface SFP type Expected value Measured value Pass/Fail


0/2/1 10G-LC-SM-10KM -14.4 to +0.5 dBm
0/2/3 10G-LC-SM-10KM -14.4 to +0.5 dBm

Acceptance Engineer
Signature: Date:
Vendor:
Witnessing Project
Signature: Date:
Engineer Mobily:

Witnessing Engineer
Signature: Date:
O&M MNS/Mobily:

Remarks:

PAT {ATN910C} {Huawei} Page 20 of 41

PUBLIC
Classification: PUBLIC Use

Project Name: Saudi Mobily ITN Project SED No: W-3462-ATN-01-EXP(REL)-01 City/District:
Makkah/West
Site Code: WR_3462 Job No.: W-3462-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3462-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A

3.8 Optical Module Receiver Sensitivity Test (Field)

Purpose Ensure all optical modules have optimal performance under low optical power input.

Setup

Procedure 1. Connect the tester (VOA) to Switch optical port through assigned ODF/FPP(if
ODF/FPP available) as shown above.
2. Increase the optical attenuation gradually (VOA) till the port go to down state.
3. Measure and record the optical power value on Table 6: RX Sensitivity Result.
4. Test all the port one by one and record the result.

Expected The port of Switch should not go down as per below receive power range.
Results
SFP Received Power Range Model No.
10G-LC-SM-10KM Less than -14.4 dBm OSX001002
10G-LC-SM-40KM Less than -15.8 dBm OMXD30002
10G-LC-SM-80KM Less than -24 dBm OSX080N04
10G-LC-MM-0.3KM Less than -9.9 dBm OSX040N03
1G-LC-SM-10KM Less than -20 dBm OSG010N05
1G-LC-SM-40KM Less than -17 dBm OSG040002
1G-LC-SM-80KM Less than -23 dBm Zx/FC100
1G-LC-MM-0.5KM Less than -17 dBm Sx/FC200 MM
40G-LC-SM-10KM Less than -13.7 dBm OSM010C02
100G-LC-SM-10KM Less than -4 dBm OSN010N09
100G-LC-SM-30-40KM Less than -15.4 OSN030N05
100G-LC-SM-10KM Less than -2.6 OSN010N24
1G-LC-SM-40KM Less than -23 OGEBIDI40

Note:

A. Not Applicable for collocated connections (NE to NE connection).

That means the sensitivity test will be not be performed for the following:
1. Ports which are assigned as locally (collocated) or terminated to other
routers/Switch (locally connected).
2. Ports which are connected to routers/Switch installed on remote POPs via
collocated transmission equipment.

PAT {ATN910C} {Huawei} Page 21 of 41

PUBLIC
Classification: PUBLIC Use

Project Name: Saudi Mobily ITN Project SED No: W-3462-ATN-01-EXP(REL)-01 City/District:
Makkah/West
Site Code: WR_3462 Job No.: W-3462-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3462-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A

Results
See Table 6: Rx Sensitivity Result.

Table 6: Rx Sensitivity Result:

Interface SFP type Expected value Measured value Pass/Fail

0/2/1 10G-LC-SM-10KM Less than -14.4 dBm


0/2/3 10G-LC-SM-10KM Less than -14.4 dBm

Acceptance Engineer
Signature: Date:
Vendor:
Witnessing Project
Signature: Date:
Engineer Mobily:

Witnessing Engineer
Signature: Date:
O&M MNS/Mobily:

Remarks:

PAT {ATN910C} {Huawei} Page 22 of 41

PUBLIC
Classification: PUBLIC Use

Project Name: Saudi Mobily ITN Project SED No: W-3462-ATN-01-EXP(REL)-01 City/District:
Makkah/West
Site Code: WR_3462 Job No.: W-3462-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3462-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A

3.9 BIDI Optical Module Receiver Sensitivity Test uplink (Field)

Purpose Ensure all optical modules on ATN have optimal performance under low optical power
input.
Setup

Procedure
1. Ensure ATN is online first and working on normal status.
2. Adjust the optical attenuator, and gradually increase the attenuation, when reach the
critical point of ATN online and offline. Make sure that the adjustment is stable and slow.
3. Measure and record the optical power value on Table 7.
4. BIDI connectivity on ATN to CSG/UPE will be in pair.
Pair 10KM = (OSX010B11 - OSX010B10)
Pair 40KM = (OSX040B02 - OSX040B03)

Expected The port of Switch should not go down as per below receive power range.
Results
SFP Received Power Range Model No.
10G-LC-SM-10KM (BIDI) Less than -14.4 dBm OSX010B10
10G-LC-SM-10KM (BIDI) Less than -14.4 dBm OSX010B11
10G-LC-SM-40KM (BIDI) Less than -18 dBm OSX040B02
10G-LC-SM-40KM (BIDI) Less than -18 dBm OSX040B03

Note:

A. Not Applicable for collocated connections (NE to NE connection).

That means the sensitivity test will be not be performed for the following:
1. Ports which are assigned as locally (collocated) or terminated to other
routers/Switch (locally connected).
2. Ports which are connected to routers/Switch installed on remote POPs via
collocated transmission equipment.

Results
See Table 7: Rx Sensitivity Result.

PAT {ATN910C} {Huawei} Page 23 of 41

PUBLIC
Classification: PUBLIC Use

Project Name: Saudi Mobily ITN Project SED No: W-3462-ATN-01-EXP(REL)-01 City/District:
Makkah/West
Site Code: WR_3462 Job No.: W-3462-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3462-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A

Table 7: Rx Sensitivity Result:

Interface SFP type Expected value Measured value Pass/Fail

Acceptance Engineer
Signature: Date:
Vendor:
Witnessing Project
Signature: Date:
Engineer Mobily:

Witnessing Engineer
Signature: Date:
O&M MNS/Mobily:

Remarks:

PAT {ATN910C} {Huawei} Page 24 of 41

PUBLIC
Classification: PUBLIC Use

Project Name: Saudi Mobily ITN Project SED No: W-3462-ATN-01-EXP(REL)-01 City/District:
Makkah/West
Site Code: WR_3462 Job No.: W-3462-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3462-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A

3.10 System reboot by Power off (Field)

Purpose Confirm the ATN can recover after hard reboot.

Setup None
Procedure 1. Keep pinging the ATN loopback address
2. Use command line to record the configuration, logs, CPU/memory, alarms,
interface status, card register status.
Display current-configuration
Display logbuffer
Display alarm all
Display device
Display device pic
Display health
Display interface brief
3. Turn off the power.
4. After 5 min, turn on the power again.
5. Check the configuration/status after reboot and compare with file before reboot.
Display current-configuration
Display logbuffer
Display alarm all
Display device
Display device pic
Display health
Display interface brief

Expected After hard reboot, no configuration is lost.


Results
Results Pass / Fail

Acceptance Engineer
Signature: Date:
Vendor:
Witnessing Project
Signature: Date:
Engineer Mobily:

Witnessing Engineer
Signature: Date:
O&M MNS/Mobily:

Remarks:

PAT {ATN910C} {Huawei} Page 25 of 41

PUBLIC
Classification: PUBLIC Use

Project Name: Saudi Mobily ITN Project SED No: W-3462-ATN-01-EXP(REL)-01 City/District:
Makkah/West
Site Code: WR_3462 Job No.: W-3462-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3462-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A

4. Software Acceptance Test


4.1 Software and Device Status

4.1.1 ATN910C Configuration Verification (NOC)

Purpose Verify the ATN configuration, including Node IP, Node name.

Setup None.

Procedure 1. Login to the ATN910C, the node name is displayed before the “#” prompt.
2. Use command “display ip interface brief” to check the node IP.
3. Use command “display current-configuration”
4. Verify the node name and IP.
5. Save the configuration.
Expected The Node name and IP is as per SED.
Results Node name OAM IP
W3462-IASW-HU01 10.142.228.9
Results Pass / Fail

Acceptance Engineer
Signature: Date:
Vendor:
Witnessing Project
Signature: Date:
Engineer Mobily:

Witnessing Engineer
Signature: Date:
O&M MNS/Mobily:

Remarks:

PAT {ATN910C} {Huawei} Page 26 of 41

PUBLIC
Classification: PUBLIC Use

Project Name: Saudi Mobily ITN Project SED No: W-3462-ATN-01-EXP(REL)-01 City/District:
Makkah/West
Site Code: WR_3462 Job No.: W-3462-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3462-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A

4.1.2 ATN910C Switch VRP Software Version (NOC)

Purpose Confirm the ATN910C Software is the same as mentioned.

Setup None.

Procedure 1. Use command “display version”.

Expected The “display version” command shows that the version is


Results
o V300R005C10 for ATN910C-B

o V300R006C10 for ATN910C-G

Results Pass / Fail

Acceptance Engineer
Signature: Date:
Vendor:
Witnessing Project
Signature: Date:
Engineer Mobily:

Witnessing Engineer
Signature: Date:
O&M MNS/Mobily:

Remarks:

PAT {ATN910C} {Huawei} Page 27 of 41

PUBLIC
Classification: PUBLIC Use

Project Name: Saudi Mobily ITN Project SED No: W-3462-ATN-01-EXP(REL)-01 City/District:
Makkah/West
Site Code: WR_3462 Job No.: W-3462-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3462-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A

4.1.3 ATN910C Device Status (NOC)

Purpose Confirm the ATN910C Status is healthy.

Setup None

Procedure 1. Use command “display device”.


2. Use command “display temperature”.
3. Use command “display alarm active”.
4. Use command “display fan”.

Expected 1. The device status is “normal”.


Results 2. The temperature show normal status.
3. The active alarm list is empty.
4. The fan Present status is “YES”, Registered is “YES”
Results Pass / Fail

Acceptance Engineer
Signature: Date:
Vendor:
Witnessing Project
Signature: Date:
Engineer Mobily:

Witnessing Engineer
Signature: Date:
O&M MNS/Mobily:

Remarks:

PAT {ATN910C} {Huawei} Page 28 of 41

PUBLIC
Classification: PUBLIC Use

Project Name: Saudi Mobily ITN Project SED No: W-3462-ATN-01-EXP(REL)-01 City/District:
Makkah/West
Site Code: WR_3462 Job No.: W-3462-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3462-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A

4.1.4 ATN910C System Configuration Check (NOC)

Purpose Ensure that the system

Setup
None

Procedure
1. Synchronise NE configuration data on U2000
2. Backup NE data on U2000
3. Open Device Panel on U2000

Expected 1. Synchronization should be successful


Results 2. NE Backup is successful
3. Device panel display correct panel information
Results Pass / Fail

Acceptance Engineer
Signature: Date:
Vendor:
Witnessing Project
Signature: Date:
Engineer Mobily:

Witnessing Engineer
Signature: Date:
O&M MNS/Mobily:

Remarks:

PAT {ATN910C} {Huawei} Page 29 of 41

PUBLIC
Classification: PUBLIC Use

Project Name: Saudi Mobily ITN Project SED No: W-3462-ATN-01-EXP(REL)-01 City/District:
Makkah/West
Site Code: WR_3462 Job No.: W-3462-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3462-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A

4.1.5 ATN910C Gateway Reachability Test (NOC)

Purpose Ensure that the ATN can reach to the gateway

Setup
None

Procedure
1. Ping ATN gateway with below command
“ping x.x.x.x”.
2. In case there is redundant uplink, shutdown the primary uplink and verify
reachability

Expected 1. ATN is able to ping the GW IP.


Results 2. ATN still can ping the GW IP

Results Pass / Fail

Acceptance Engineer
Signature: Date:
Vendor:
Witnessing Project
Signature: Date:
Engineer Mobily:

Witnessing Engineer
Signature: Date:
O&M MNS/Mobily:

Remarks:

PAT {ATN910C} {Huawei} Page 30 of 41

PUBLIC
Classification: PUBLIC Use

Project Name: Saudi Mobily ITN Project SED No: W-3462-ATN-01-EXP(REL)-01 City/District:
Makkah/West
Site Code: WR_3462 Job No.: W-3462-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3462-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A

4.1.6 ATN910C SSH and Security Test (NOC)

Purpose Confirm the ATN910C SSH and security.

Setup None

Procedure 1. Stelnet from IP included in configured ssh access-list


2. Stelnet from any IP not included in configured ssh access-list
3. Display telnet server
4. Display ftp server
5. Display current-configuration configuration aaa

Expected 1. Login is succesfull


Results 2. Login is fail
3. Telnet server is disabled
4. ftp server is disabled
5. only Mobily authorized local users is configured

Results Pass / Fail

Acceptance Engineer
Signature: Date:
Vendor:
Witnessing Project
Signature: Date:
Engineer Mobily:

Witnessing Engineer
Signature: Date:
O&M MNS/Mobily:

Remarks:

PAT {ATN910C} {Huawei} Page 31 of 41

PUBLIC
Classification: PUBLIC Use

Project Name: Saudi Mobily ITN Project SED No: W-3462-ATN-01-EXP(REL)-01 City/District:
Makkah/West
Site Code: WR_3462 Job No.: W-3462-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3462-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A

4.1.7 MBSS Verification (NOC)

Purpose MBSS requirement verification

Setup None

Procedure 1. display current-configuration configuration aaa


2. display current-configuration configuration radius
3. display telnet server
display ftp-server
4. display current-configuration configuration user-interface
5. display current-configuration configuration ntp
6. display ssh server status
7. display info-center
8. display logbuffer
9. display clock
Expected 1.local-user password should be irreversible-cipher
Results authentication scheme should be RADIUS

2.there should be two remote radius service for the authentication (IP1: 10.64.165.67, IP2:
10.14.65.65)
The shared-key of radius server should be encrypted.

3.The telnet server shows disable


The FTP server state is disabled

4. Console interface authentication mode should be password, the password should be


encrypted.
VTY interface authentication mode should be aaa, and the protocol is SSH only.

5. NTP service should be with authentication and password is encrypted.

6. SSH version is 2.0, authentication timeout 60 seconds, retry times 3.


SSH login is with ACL restrained

7. Primary and backup log server are configured for the logs backup.

8. Recent log should be showing normally with correct timestamp.

9. The Switch should be configured with the correct timezone and time is correct.

Results Pass / Fail

Acceptance Engineer
Signature: Date:
Vendor:
Witnessing Project
Signature: Date:
Engineer Mobily:

Witnessing Engineer
Signature: Date:
O&M MNS/Mobily:

Remarks:

PAT {ATN910C} {Huawei} Page 32 of 41

PUBLIC
Classification: PUBLIC Use

Project Name: Saudi Mobily ITN Project SED No: W-3462-ATN-01-EXP(REL)-01 City/District:
Makkah/West
Site Code: WR_3462 Job No.: W-3462-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3462-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A

4.1.8 V-Shape Primary/Backup Switchover Test (NOC)

Purpose To verify the Primary / Backup switchover test after V-shaping transformation
(this case is specifically for V-shape transformation only)
Setup

Procedure 1. Disconnect or shutdown the Primary link port between ATN to UPE1.
2. After confirm service/status normal, re-connect or undo shutdown the primary link
port between ATN to UPE1.
3. Disconnect/shutdown the backup link port between ATN-UPE2.
4. Recover the backup link fiber/port.

Expected For procedure 1, backup link will become active and primary link will be standby.
Results After procedure 2&3, primary/backup link will be recovered to original status.

Results
Result example:

Acceptance Engineer
Signature: Date:
Vendor:
Witnessing Project
Signature: Date:
Engineer Mobily:

Witnessing Engineer
Signature: Date:
O&M MNS/Mobily:

Remarks:

PAT {ATN910C} {Huawei} Page 33 of 41

PUBLIC
Classification: PUBLIC Use

Project Name: Saudi Mobily ITN Project SED No: W-3462-ATN-01-EXP(REL)-01 City/District:
Makkah/West
Site Code: WR_3462 Job No.: W-3462-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3462-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A

5. Test Results Participation Reference

Mobily Project Mobily Project Mobily Project


Representative Representative Representative PAT Date
Name Designation Signature

Vendor Project Vendor Project Vendor Project


Representative Representative Representative PAT Date
Name Designation Signature

Mobily O&M Mobily O&M Mobily O&M


Representative Representative Representative PAT Date
Name Designation Signature

Vendor MNS Vendor MNS Vendor MNS


Representative Representative Representative PAT Date
Name Designation Signature

PAT {ATN910C} {Huawei} Page 34 of 41

PUBLIC
Classification: PUBLIC Use

Project Name: Saudi Mobily ITN Project SED No: W-3462-ATN-01-EXP(REL)-01 City/District:
Makkah/West
Site Code: WR_3462 Job No.: W-3462-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3462-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A

6. ACCEPTANCE TEST REPORT (Field)

PROVISIONAL ACCEPTANCE FIELD TEST REPORT

a. Work without Outstanding Items

Work with Non-Service Affecting Items


b.
See the list(s) of Outstanding Items attached (pages ___to ___)

Work with Service Affecting Items


c.
See the list(s) of Outstanding Items attached (pages ___to ___)

Only Local PAT (special circumstances)


d.
See the list(s) of Outstanding Items attached (pages ___to ___)

PAT Start Date (DD/MM/YY): _________________

PAT Completion Date (DD/MM/YY): _________________

Mobily Project Vendor Project Mobily O&M Mobily MNS


Representative Representative Representative Representative
Signature: Signature: Signature: Signature:

Name: Name: Name: Name:


Phone#: Phone#: Phone#: Phone#:
Date: Date: Date: Date:

PAT {ATN910C} {Huawei} Page 35 of 41

PUBLIC
Classification: PUBLIC Use

Project Name: Saudi Mobily ITN Project SED No: W-3462-ATN-01-EXP(REL)-01 City/District:
Makkah/West
Site Code: WR_3462 Job No.: W-3462-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3462-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A

7. Outstanding Issues List (Field)

The below items have been noted during PAT and shall be cleared within
Clearance
three (3) months from the Preliminary Acceptance Date
Categorization Verified by
Item Date
Description of Outstanding Items Rectified
No.
SA NSA Vendor Mobily

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

Outstanding Items List


Mobily Project Vendor Project Mobily O&M Mobily MNS
Representative Representative Representative Representative
Signature: Signature: Signature: Signature:
Name: Name: Name: Name:
Phone#: Phone#: Phone#: Phone#:

Date: Date: Date: Date:

Clearance
Mobily Project Vendor Project Mobily O&M Mobily MNS
Representative Representative Representative Representative
Signature: Signature: Signature: Signature:

Name: Name: Name: Name:


Phone#: Phone#: Phone#: Phone#:
Date: Date: Date: Date:

PAT {ATN910C} {Huawei} Page 36 of 41

PUBLIC
Classification: PUBLIC Use

Project Name: Saudi Mobily ITN Project SED No: W-3462-ATN-01-EXP(REL)-01 City/District:
Makkah/West
Site Code: WR_3462 Job No.: W-3462-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3462-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A

8. ACCEPTANCE TEST REPORT (NOC)

PROVISIONAL ACCEPTANCE FIELD TEST REPORT

a. Work without Outstanding Items

Work with Non-Service Affecting Items


b.
See the list(s) of Outstanding Items attached (pages ___to ___)

Work with Service Affecting Items


c.
See the list(s) of Outstanding Items attached (pages ___to ___)

Only Local PAT (special circumstances)


d.
See the list(s) of Outstanding Items attached (pages ___to ___)

PAT Start Date (DD/MM/YY): _________________

PAT Completion Date (DD/MM/YY): _________________

Mobily Project Vendor Project Mobily O&M Mobily MNS


Representative Representative Representative Representative
Signature: Signature: Signature: Signature:
Name: Name: Name: Name:
Phone#: Phone#: Phone#: Phone#:

Date: Date: Date: Date:

PAT {ATN910C} {Huawei} Page 37 of 41

PUBLIC
Classification: PUBLIC Use

Project Name: Saudi Mobily ITN Project SED No: W-3462-ATN-01-EXP(REL)-01 City/District:
Makkah/West
Site Code: WR_3462 Job No.: W-3462-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3462-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A

9. Outstanding Issues List (NOC)

The below items have been noted during PAT and shall be cleared within
Clearance
three (3) months from the Preliminary Acceptance Date
Categorization Verified by
Item Date
Description of Outstanding Items Rectified
No.
SA NSA Vendor Mobily

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

Outstanding Items List


Mobily Project Vendor Project Mobily O&M Mobily MNS
Representative Representative Representative Representative
Signature: Signature: Signature: Signature:

Name: Name: Name: Name:


Phone#: Phone#: Phone#: Phone#:
Date: Date: Date: Date:

Clearance
Mobily Project Vendor Project Mobily O&M Mobily MNS
Representative Representative Representative Representative
Signature: Signature: Signature: Signature:
Name: Name: Name: Name:

Phone#: Phone#: Phone#: Phone#:


Date: Date: Date: Date:

PAT {ATN910C} {Huawei} Page 38 of 41

PUBLIC
Classification: PUBLIC Use

Project Name: Saudi Mobily ITN Project SED No: W-3462-ATN-01-EXP(REL)-01 City/District:
Makkah/West
Site Code: WR_3462 Job No.: W-3462-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3462-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A

10. Test Results Summary


Test
Test Description Passed: Failed NA Remarks
No
3.2 Site Acceptance Quality Check List

3.3 Bill of Quantities Available As Per Site

3.4 Power Module Redundancy Test

3.5 DC Voltage and Grounding Test (Field)


Interface Transceiver Tx Power Verification
3.6
(Field)
Interface Transceiver Rx Power Verification
3.7
(Field)
3.8 Optical Module Receiver Sensitivity Test (Field)
BIDI Optical Module Receiver Sensitivity Test
3.9
uplink (Field)
3.10 System reboot by Power off (Field)

4.1.1 ATN910C Configuration Verification

4.1.2 ATN910C Switch VRP Software Version

4.1.3 ATN910C Device Status

4.1.4 ATN910C System Configuration Check

4.1.5 ATN910C Gateway Reachability Test

4.1.6 ATN910C SSH and Security Test

4.1.7 MBSS Verification

4.1.8 V-Shape Primary/Backup Switchover Test

Mobily Project Representative Vendor Project Representative

Name: Date: Name: Date:

Signature: Signature:

Mobily O&M Representative Vendor MNS Representative

Name: Date: Name: Date:

Signature: Signature:

PAT {ATN910C} {Huawei} Page 39 of 41

PUBLIC
Classification: PUBLIC Use

Project Name: Saudi Mobily ITN Project SED No: W-3462-ATN-01-EXP(REL)-01 City/District:
Makkah/West
Site Code: WR_3462 Job No.: W-3462-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3462-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A

11. Abbreviations

Abbreviations Description
ASG Aggregation Site Gateway
BFD Bidirectional Forwarding Detection
BGP Border Gateway Protocol
BSC Base Station Controller
CLI Command Line Interface
CPU Central Process Unit
CRC Cyclic Redundancy Check
CSG Cell Site Gateway
DC Direct Current
DDF Digital Distribution Frame
DWDM Dense Wavelength Division Multiplexing
EPC Evolved Packet Core
FTTX Fiber to the X
IGP Interior Gateway protocol
LAN Local Area Network
LDP Label Distribution Protocol
LPU Line Process Unit
MNS Management Network Service
MPU Main Process unit
MW Microwave
NEG Negative
NTP Network Time Protocol
ODF Optical Distribution Frame
PAT Preliminary Acceptance Test
PEM
Remote-LFA Remote Loop Free Alternative
RNC Radio Network Controller
RTN
SDH Synchronize Digital Hierarchy
SDRAM Synchronous Dynamic Random Access Memory
SED Site Engineering Design
SFP
SFU Switch Fabric unit
SNMP Simple Network Management Protocol
SSH Secure Shell
VRP Versatile Routing Platform
WAN Wide Area Network

PAT {ATN910C} {Huawei} Page 40 of 41

PUBLIC
Classification: PUBLIC Use

Project Name: Saudi Mobily ITN Project SED No: W-3462-ATN-01-EXP(REL)-01 City/District:
Makkah/West
Site Code: WR_3462 Job No.: W-3462-ATN-01-EXP(REL)-01 Ring No.:NA
NE Name: W3462-IASW-HU01 Rack Location: ERICSSON OUTDOOR CABINET Shelf Location: P01A

END OF THE DOCUMENT

PAT {ATN910C} {Huawei} Page 41 of 41

PUBLIC
Technical Document
Customer Name: WR_3462

SED Number: W-3462-ATN-01-EXP(REL)-01

Customer Type: Ericsson Outdoor Cabinet (Monopole Tower)

Customer Location: MAKKAH


Version 1.0

Project ID: WR_3462


Project Title: WR_3462 ATN Project
Project Sponsor: MOBILY

Project Manager: Saeed Bamhimoud

Version: 1.0

Issue Date: 14-02-2019

Document Change Record


Date Author Name Version Change Reference
2-06-2022 Anas 1.0
Document Reviewers
Name Position Signature Date

FME
Contents

1.0 Document Objective………………………………………………………..……………………….………………….….……

2.0 Network Design …………………………………………………………………………………………………………………....

2.0.1. Brief Description………………………………………………………………………………………………..………….………

2.1 Customer Location……………………………………………………………………..………..……..……………….……...

2.2 Schematic Diagram ………….……………………………………………………………………….…………………….…...

2.3 Installation Snapshots...………………………………………………………………………..……….…….…….………..

2.4 Logical Diagram…………………………………………………………………………………………….……….…….………

2.5 Physical Diagram…………………………………………………………………………………………….………..….………

3.0 Connectivity Detail…………………………………………………………………………………….….….………………….

3.1. Hardware Provided….……………………………………………………………………………………………….………….

3.2. IOS Image and Switch Serial Number……………………………………………………………………….…...…....

3.3 Hostname Convention……………………………………………………………………………………..…………...……..

4.0 IP Addresses………………………………………………………………………………………………………..………….......

5.0 Note…………..………………………………………………………………………………………………………..………….......

6.0 Configuration Template………………………………………….……………………………………………..…………….


1.0 Document Objective
This document purpose is to describe end to end connectivity details of ATN910C-B integrated at WR_3462 which include
logical and physical design specification.

2.0 Network Design

2.0.1 Brief Description


One ATN910C-B installed at Customer Site WR_3462 which is connected to MAK5-IUPE-HU01

Expansion Scope: (W-3462-ATN-01-EXP-01)

Under this expansion 1x 10G SFPs (10G-LC-SM-10KM) will be installed in slot/port 0/2/2 to serve as
down-link connection under Rise Project –Rise 56A07GZ

Expansion Scope: (W-3462-ATN-01-EXP(REL)-01)

Under this expansion 2x 10G SFPs (10G-LC-SM-10KM) will be installed in slot/port 0/2/1 & 0/2/3 to serve
as down-link connection under ITN Project

Below are the SFP Details which are Relocated from the Site WR_2399

# Item Description From Site Slot To Site Slot SN

Optical Transceiver
1 W2399-ICSG-HU01 0/4/1 W3462-ICSG-HU01 0/2/1
(SFP+,1310nm,10Gb/s,-8.2~0.5dBm,- EM195300030583
12.6dBm,LC,SM,10km)
Optical Transceiver
2
(SFP+,1310nm,10Gb/s,-8.2~0.5dBm,-
W2399-ICSG-HU01
0/2/8
W3462-ICSG-HU01 0/2/3 MB20321060463
12.6dBm,LC,SM,10km)
Etihad Etisalat
Data Network Department

Customer Location
WR_3462 located in MAKKAH. Co-ordinates and Escalation Matrix are as below.

City Customer name Coordinates Switch Location Customer Contact

21.423900 ERICSSON Ericsson Outdoor Cabinet


MAKKAH WR_3462 OUTDOOR
39.860200 CABINET Open Access
Etihad Etisalat
Data Network Department

2.1 Schematic Diagram for WR_3462

Mobily DN 5
Etihad Etisalat
Data Network Department

2.2 Installations Snapshots

Mobily DN 6
Etihad Etisalat
Data Network Department

Mobily DN 7
Etihad Etisalat
Data Network Department

Mobily DN 8
Etihad Etisalat
Data Network Department

Mobily DN 9
Etihad Etisalat
Data Network Department

Below are pics for Expansion Scope: (W-3462-ATN-01-EXP-01)

Mobily DN 10
Etihad Etisalat
Data Network Department

Below are pics for Expansion Scope: (W-3462-ATN-01-EXP(REL)-01)

Mobily DN 11
Etihad Etisalat
Data Network Department

2.3 Logical Diagram


WR_3462 ATN 910C-B
MAK5-IUPE-HU01

Mobily DN 12
Etihad Etisalat
Data Network Department

2.4 Physical Diagram

Mobily DN 13
Etihad Etisalat
Data Network Department

3 Connectivity Detail: -PORT MAPPING


New connectivity

SITE HUA_switch_ATN910C NE SWITCH Port Peer NE Peer port Customer/ VLAN Physical
Circuit BW change

Shift to
NA Optical cable
MAK5-IUPE-HU01 to ATN port
WR_3462
Shift to
W3462-IASW-HU01 GE0/2/0 GE 5/1/8 10G 1-4093 Optical cable
MAK5-IUPE-HU01 to ATN port

WR_3462 W3462-IASW-HU01 GE0/2/2 Downlink Sfp (Not 10G


connected)
GE0/2/1 & Downlink Sfp (Not
WR_3462 W3462-IASW-HU01 10G
0/2/3
connected)

Switch DDF info MPLS ODF Port


Switch hostname TXM CID Capacity Vendor CSG Router Port
port at GDoW info at MAK5

ODB PT HUA- MAK5-IUPE-


W3462-IASW-HU01 GE0/2/0 201 10GE No change
17,18 MNS HU01
GE 5/1/8

3.1 Hardware

W3462-IASW-HU01

ITEM TYPE INTERFACE QUANTITY SERIAL NO. Comments


ATN 910C-B - 2 channels DC entries, with
4*10GE(o), 8*10GE/GE/FE(o), NA 01 2102350TKK10L4006 ATN
ATN 910C-B 824
8*GE/FE(o), 8*GE/FE(e)

OMXD30002.Optical interface
Transceiver(SFP+,1550nm,9.95~ GigabitEthernet0/2/0
01
10G SFP 11.1Gb/s,-4.7~4dBm,-
14.1dBm,LC,SM,40km) U7SABH03555 Uplink Connectivity

SFP Expansion Scope W-3462-ATN-01-EXP-01


OSX001002.Optical interface
Transceiver(SFP+,1310nm,10Gb/s,- GigabitEthernet0/2/2
01
10G SFP 8.2~0.5dBm,-
12.6dBm,LC,SM,10km)) MB19311491802 Downlink Connectivity

Mobily DN 14
Etihad Etisalat
Data Network Department

SFP Expansion Scope W-3462-ATN-01-EXP(REL)-01


OSX001002.Optical interface
Transceiver(SFP+,1310nm,10Gb/s,- GigabitEthernet0/2/1
10G SFP 8.2~0.5dBm,-
01 EM195300030583
12.6dBm,LC,SM,10km)) Downlink Connectivity

OSX001002.Optical interface
Transceiver(SFP+,1310nm,10Gb/s,- GigabitEthernet0/2/3
10G SFP 8.2~0.5dBm,-
01 MB20321060463
12.6dBm,LC,SM,10km)) Downlink Connectivity

3.2 ATN Software Image

Device type Image name


ATN-910C-B ATN 910C-B V300R005C00SPC300

3.3 Hostname Convention

Data Center Name Hostname


MAK5 W3462-IASW-HU01

4 Management IP Address and VLAN Information

Type Interface VLAN Switch IP Address


W3462-IASW-HU01 0/2/0 201 10.142.225.251 /31

5 NOTE:
Media DF between WR_3462 and MAK5

Mobily DN 15
Etihad Etisalat
Data Network Department

ATN POWER Connectivity Detail


SWITCH PPOWER Existing Power Source ATN CB/FUSE # Rating
TYPE
DC POWER ERICSSON CAB PDU NEG1-INPUT A CB 6 10A
NEG2-INPUT B CB 7

Powering On the Equipment ATN 910C

1 Powering On the Equipment


Check the voltage and the fuse capacity of the external power supply

NOTE
For a running ATN 910C, you must turn on the switches of both AC power modules operating in 1+1 backup mode.
Standard Voltage of the Input Power Supply Allowed Voltage Range for AC Equipment
220V ATN 910&910I&910B&910C&950C&950B: 100V ~ 240V ATN 980B:

200V ~ 240V

110V ATN 980B: 100V ~ 120V

Standard Voltage of the Input Power Supply Allowed Voltage Range for DC Equipment
- 48 V - 38.4 V to - 57.6 V
- 60 V - 48 V to - 72 V

Equipment Max. Power Max. Recommended Fuse Capacity Rule for Selecting a Proper
Consumption Working Fuse (Power
Current Distribution Cabinet)
ATN 910I 35W AC: 0.8A DC: AC: 1 A (5A is recommended.) DC:

1.5A 1.875 A (5A is recommended.)

ATN 910 140W 4A 5A (5A is recommended.)

ATN 910B 68W AC: 1.2A DC: AC: 1.5A (5A is recommended.) DC: Rated working current
3A 3.75A (5A is recommended.) Working current of equipment x
1.25.
ATN 910C AC: 108W DC: AC: 2.5A AC: 3.125A (5A is recommended.)
DC: 7.5A (10A is recommended.) Maintaining the current at
103W DC: 6A
the minimum value of the
fuse capacity is
ATN 950B 250W 8A 10A (10A is recommended.) recommended.

ATN 950C 350W 8A 10A (10A is recommended.)

ATN 980B 1200W AC: 12A DC: AC: 15A (16A is recommended.) DC:

25A 31.25A (32A is recommended.)

CAUTION

Before the equipment is powered on, you must use the multimeter to test whether a short-circuit occurs between the positive
and negative terminals of the PDU.

Mobily DN 16
Etihad Etisalat
Data Network Department

6 Configuration Template
#
clock timezone Riyadh add 03:00:00
#
sysname WR_3462.SWH.H910C.01
#
vlan 201
#
vlan 201
description ATN Management
#
interface Vlanif201
description ATN Management
ip address 10.142.225.251 31
#
interface Ethernet0/0/0
undo vpn-instance __LOCAL_OAM_VPN__
#
command-privilege level rearrange
#
info-center channel 9 name log
info-center loghost source Vlanif201
info-center loghost 10.73.98.20
info-center loghost 10.83.212.52
info-center loghost 10.14.161.168
info-center loghost 10.64.161.168
info-center logbuffer channel 9 size 1024
#
ntp-service server disable
ntp-service ipv6 server disable
ntp-service authentication-keyid 1 authentication-mode md5 cipher M0bily@
ntp-service reliable authentication-keyid 1
ntp-service unicast-server 10.81.44.37 authentication-keyid 1 preference
ntp-service unicast-server 10.83.44.37 authentication-keyid 1
ntp-service authentication enable
ntp-service source-interface Vlanif201
#
telnet server enable
#
undo pnp enable
#
radius-server group mobily-radius
radius-server shared-key-cipher R!$e2Pr0tecT
radius-server authentication 10.64.165.67 1812
radius-server authentication 10.14.65.65 1812 secondary
radius-server retransmit 2
radius-server source interface Vlanif201
radius-server user-name original
#
diffserv domain mobile_e2e_classifier
ip-dscp-inbound 0 phb be green
ip-dscp-inbound 18 phb af2 green
ip-dscp-inbound 26 phb af3 green
ip-dscp-inbound 32 phb af4 green
ip-dscp-inbound 34 phb af4 green
ip-dscp-inbound 40 phb ef green
ip-dscp-inbound 46 phb ef green
ip-dscp-inbound 56 phb cs6 green

Mobily DN 17
Etihad Etisalat
Data Network Department
#
port-wred wred_nni
color green low-limit 70 high-limit 100 discard-percentage 30
color red low-limit 50 high-limit 90 discard-percentage 50
#
port-wred wred_mbh
color green low-limit 70 high-limit 100 discard-percentage 30
color red low-limit 50 high-limit 90 discard-percentage 50
#
acl number 2001
description SNMP Access-list
rule 10 permit source 10.14.161.171 0
rule 10 description OSS-SNMP-Server
rule 20 permit source 10.14.161.173 0
rule 20 description OSS-SNMP-Server
rule 30 permit source 10.14.161.175 0
rule 30 description OSS-SNMP-Server
rule 40 permit source 10.14.161.176 0
rule 40 description OSS-SNMP-Server
rule 50 permit source 10.14.161.179 0
rule 50 description OSS-SNMP-Server
rule 60 permit source 10.14.161.168 0
rule 60 description MobilyDNOSSFM11
rule 70 permit source 10.64.161.168 0
rule 70 description MobilyDNOSSFM12
rule 80 permit source 10.73.98.20 0
rule 80 description MALQ2-U2000-server
rule 90 permit source 10.83.212.52 0
rule 90 description MAK5-U2000-server
rule 100 permit source 10.64.161.171 0
rule 100 description to OSS Server
rule 110 permit source 10.64.161.173 0
rule 110 description to OSS Server
rule 120 permit source 10.64.161.176 0
rule 120 description to OSS Server
rule 130 permit source 10.64.161.179 0
rule 130 description to OSS Server
rule 140 permit source 10.64.161.175 0
rule 140 description to OSS Server
rule 150 permit source 10.6.78.210 0
rule 150 description to Vulnerability_Server
rule 160 permit source 10.64.165.123 0
rule 160 description to Vulnerability_Server
rule 170 permit source 10.64.165.124 0
rule 170 description to Vulnerability_Server
rule 180 permit source 10.64.247.122 0
rule 180 description to IMS server
rule 190 permit source 10.14.239.76 0
rule 190 description to IMS server
rule 200 permit source 10.14.161.182 0
rule 200 description to MobilyDNOSSNIM03
rule 210 permit source 10.64.161.190 0
rule 210 description to MobilyDNOSSNIM04
rule 220 permit source 10.73.52.64 0.0.0.224
rule 220 description to NCE_Server
rule 230 permit source 10.83.14.64 0.0.0.224
rule 230 description to NCE_Server
#
acl number 3001

Mobily DN 18
Etihad Etisalat
Data Network Department
description System SSH Login
rule 10 permit tcp source 10.73.98.20 0
rule 10 description MALQ2-U2000-server
rule 20 permit tcp source 10.83.212.52 0
rule 20 description MAK5-U2000-server
rule 30 permit tcp source 10.224.1.0 0.0.0.255
rule 30 description IPCore_Internal_Interfaces_Ips
rule 40 permit tcp source 10.224.2.0 0.0.0.255
rule 40 description IPCore_Internal_Interfaces_IPs
rule 50 permit tcp source 10.224.3.0 0.0.0.255
rule 50 description IPCore_Internal_Interfaces_IPs
rule 60 permit tcp source 10.224.4.0 0.0.0.255
rule 60 description IPCore_Internal_Interfaces_IPs
rule 70 permit tcp source 10.224.5.0 0.0.0.255
rule 70 description IPCore_Internal_Interfaces_IPs
rule 80 permit tcp source 10.224.7.0 0.0.0.255
rule 80 description IPCore_Internal_Interfaces_IPs
rule 90 permit tcp source 10.224.10.0 0.0.0.255
rule 90 description IPCore_Internal_Loopback_Ips
rule 100 permit tcp source 86.51.20.0 0.0.0.63
rule 100 description IPCore_Internal_Interfaces_IPs
rule 110 permit tcp source 86.51.20.64 0.0.0.15
rule 110 description IPCore_Internal_Interfaces_IPs
rule 200 permit tcp source 192.168.0.0 0.0.0.255
rule 210 permit tcp source 10.14.223.100 0 destination-port eq 22
rule 210 description IMS-MED-MAIN
rule 220 permit tcp source 10.64.223.100 0 destination-port eq 22
rule 220 description IMS-MED-DR
rule 230 permit tcp source 10.64.247.122 0 destination-port eq 22
rule 230 description EECSARUH6HOW190
rule 240 permit tcp source 10.73.52.64 0.0.0.224 destination-port eq 22
rule 240 description Huawei NCE Subnet
rule 250 permit tcp source 10.83.14.64 0.0.0.224 destination-port eq 22
rule 250 description Huawei NCE Subnet
#
aaa
local-user root password irreversible-cipher Changeme_123
local-user root service-type ssh
local-user root state block fail-times 3 interval 5
local-user root user-group manage-ug
local-user om_root password irreversible-cipher Root@123
local-user om_root service-type ftp terminal telnet ssh snmp
local-user om_root level 3
local-user om_root state block fail-times 3 interval 5
local-user om_root ftp-directory cfcard:/
local-user u_2000 password irreversible-cipher Admin@u2000
local-user u_2000 service-type ftp terminal telnet ssh
local-user u_2000 level 15
local-user u_2000 state block fail-times 3 interval 5
local-user u_2000 ftp-directory cfcard:/
local-user nceuser password irreversible-cipher Admin@123
local-user nceuser service-type ssh
local-user nceuser level 15
local-user nceuser state block fail-times 3 interval 5
#
authentication-scheme default0
#
authentication-scheme default1
#

Mobily DN 19
Etihad Etisalat
Data Network Department
authentication-scheme default
authentication-mode local radius
#
authentication-scheme mobily-radius
authentication-mode local radius
#
authorization-scheme default
#
accounting-scheme default0
#
accounting-scheme default1
#
domain default0
#
domain default1
#
domain default_admin
authentication-scheme mobily-radius
radius-server group mobily-radius
#
interface Eth-Trunk0
portswitch
description (Eth-Trunk0)(West)(10G)(WR_3462.SWH.H910C.01)-(ETH-TRUNK2252)(West)(MAK5-IUPE-HU01)-[CID:Direct(Local
connection)]
port link-type trunk
port trunk allow-pass vlan 201
trust upstream default
mode lacp-static
#
interface GigabitEthernet0/2/0
description (Direct)(10G)(West)(WR_3462.SWH.H910C.01-0/2/0)-(West)(MAK5-IUPE-HU01-12/1/2)[CID:Direct Local connection]
Eth-Trunk 0
port-queue be wfq weight 5 port-wred wred_nni outbound
port-queue af2 wfq weight 10 port-wred wred_nni outbound
port-queue af3 wfq weight 15 port-wred wred_nni outbound
port-queue af4 wfq weight 30 outbound
port-queue ef pq shaping shaping-percentage 35 outbound
port-queue cs6 pq shaping shaping-percentage 5 outbound
undo shutdown
undo dcn
y
#
interface GigabitEthernet0/2/1
undo shutdown
undo dcn
y
#
interface GigabitEthernet0/2/2
undo shutdown
undo dcn
y
#
interface GigabitEthernet0/2/3
undo shutdown
undo dcn
y
#
interface GigabitEthernet0/2/4
undo shutdown

Mobily DN 20
Etihad Etisalat
Data Network Department
undo dcn
y
#
interface GigabitEthernet0/2/5
undo shutdown
undo dcn
y
#
interface GigabitEthernet0/2/6
undo shutdown
undo dcn
y
#
interface GigabitEthernet0/2/7
undo shutdown
undo dcn
y
#
interface GigabitEthernet0/2/8
undo shutdown
undo dcn
y
#
interface GigabitEthernet0/2/9
undo shutdown
undo dcn
y
#
interface GigabitEthernet0/2/10
undo shutdown
undo dcn
y
#
interface GigabitEthernet0/2/11
undo shutdown
undo dcn
y
#
interface GigabitEthernet0/2/12
undo shutdown
undo dcn
#
interface GigabitEthernet0/2/13
undo shutdown
undo dcn
#
interface GigabitEthernet0/2/14
undo shutdown
undo dcn
y
#
interface GigabitEthernet0/2/15
undo shutdown
undo dcn
y
#
interface GigabitEthernet0/2/16
undo shutdown
undo dcn

Mobily DN 21
Etihad Etisalat
Data Network Department
y
#
interface GigabitEthernet0/2/17
undo shutdown
undo dcn
y
#
interface GigabitEthernet0/2/18
undo shutdown
undo dcn
y
#
interface GigabitEthernet0/2/19
undo shutdown
undo dcn
y
#
interface GigabitEthernet0/2/20
undo shutdown
undo dcn
y
#
interface GigabitEthernet0/2/21
undo shutdown
undo dcn
y
#
interface GigabitEthernet0/2/22
undo shutdown
undo dcn
y
#
interface GigabitEthernet0/2/23
undo shutdown
undo dcn
y
#
interface GigabitEthernet0/2/23
undo shutdown
undo dcn
y
#
interface GigabitEthernet0/2/24
undo shutdown
undo dcn
y
#
interface GigabitEthernet0/2/25
undo shutdown
undo dcn
y
#
interface GigabitEthernet0/2/26
undo shutdown
undo dcn
y
#
interface GigabitEthernet0/2/27
undo shutdown

Mobily DN 22
Etihad Etisalat
Data Network Department
undo dcn
y
#
interface NULL0
#
undo dcn
#
ip route-static 0.0.0.0 0.0.0.0 10.142.225.250
#
snmp-agent
#
snmp-agent sys-info location WR_3462.SWH.H910C.01
snmp-agent sys-info version v3
snmp-agent group v3 MobilyOSS noauthentication read-view huawei-view notify-view huawei-view
snmp-agent group v3 MobilySeamless noauthentication read-view huawei-view write-view huawei-view notify-view huawei-view
snmp-agent group v3 nce noauthentication read-view huawei-view write-view huawei-view notify-view huawei-view
snmp-agent usm-user v3 nceuser
snmp-agent usm-user v3 nceuser group nce
snmp-agent usm-user v3 nceuser authentication-mode md5
Huawei@123
Huawei@123
snmp-agent usm-user v3 nceuser privacy-mode aes128
Mobily@123
Mobily@123
snmp-agent usm-user v3 nceuser acl 2001
snmp-agent target-host trap address udp-domain 10.73.98.20 params securityname u2000 v3 privacy private-netmanager
snmp-agent target-host trap address udp-domain 10.83.212.52 params securityname u2000 v3 privacy private-netmanager
snmp-agent target-host trap address udp-domain 10.14.161.168 params securityname MobilyOSS-1 v3 privacy
snmp-agent target-host trap address udp-domain 10.64.161.168 params securityname MobilyOSS-1 v3 privacy
snmp-agent target-host trap address udp-domain 10.73.52.79 params securityname nceuser v3 privacy
snmp-agent target-host trap address udp-domain 10.83.14.77 params securityname nceuser v3 privacy
#
snmp-agent mib-view included huawei-view iso
snmp-agent usm-user v3 u2000
snmp-agent usm-user v3 u2000 group MobilySeamless
snmp-agent usm-user v3 u2000 authentication-mode md5
Huawei@123
Huawei@123
snmp-agent usm-user v3 u2000 privacy-mode des56
Mobily@123
Mobily@123
snmp-agent usm-user v3 u2000 acl 2001
snmp-agent usm-user v3 MobilyOSS-1
snmp-agent usm-user v3 MobilyOSS-1 group MobilyOSS
snmp-agent usm-user v3 MobilyOSS-1 authentication-mode md5
Mobily123
Mobily123
snmp-agent usm-user v3 MobilyOSS-1 privacy-mode des56
Huawei123
Huawei123
snmp-agent usm-user v3 MobilyOSS-1 acl 2001
#
snmp-agent trap source Vlanif201
#
snmp-agent trap enable
#
lldp enable
#
sftp server enable

Mobily DN 23
Etihad Etisalat
Data Network Department
stelnet server enable
snetconf server enable
stelnet ipv4 server enable
sftp ipv4 server enable
snetconf ipv4 server enable
stelnet ipv6 server enable
sftp ipv6 server enable
snetconf ipv6 server enable
ssh authentication-type default password
ssh user om_root
ssh user om_root authentication-type password
ssh user om_root service-type all
ssh user om_root sftp-directory cfcard:/
ssh user root
ssh user root authentication-type password
ssh user root service-type stelnet
ssh user u_2000
ssh user u_2000 authentication-type password
ssh user u_2000 service-type all
ssh user u_2000 sftp-directory cfcard:/
ssh user nceuser
ssh user nceuser authentication-type password
ssh user nceuser service-type all
ssh user nceuser sftp-directory cfcard:/
ssh authorization-type default aaa
ssh client first-time enable
ssh server acl 3001
ssh authorization-type default aaa
#
ssh client first-time enable
#
command-privilege level 1 view shell dir
command-privilege level 1 view global display current-configuration
command-privilege level 3 view global display diagnostic-information
command-privilege level 1 view global display logbuffer
command-privilege level 1 view global display trapbuffer
command-privilege level 1 view shell reset counters interface
command-privilege level 1 view shell save
command-privilege level 1 view shell screen-length
command-privilege level 1 view shell terminal debugging
command-privilege level 1 view shell terminal logging
command-privilege level 1 view shell terminal monitor
#
#
user-interface con 0
authentication-mode password
set authentication password cipher Changeme_123
#
user-interface vty 0 4
authentication-mode aaa
protocol inbound ssh
#
return

Mobily DN 24
JOB PARTICULAR
PROJECT NAME: FTTM 2018 PROJECT
DESCRIPTION : PROPOSED LOCATION OF TRM EXISTING
EQUIPMENT.
1*MDU

NOTES
1. ALL DIMENSION ARE IN MILLIMETERS UNLESS
OTHERWISE NOTED.

NOTES

D PROPOSED EQUIPMENT 1*MDU

=I
D EXISTING EQUIPMENT

FUTURE EQUIPMENT

• EQUIPMENT FRONT

PROPOSED LOCATION FOR 1*MDU


A I 23-07-2019 IN EXISTING ERICSSON CABINET.

IREVJ DATE I DESCRIPTIONS

REVISIONS

FTTM 2016 PROJECT


HUAWEI TECH. INVESTMENT
SAUDI ARABIA CO. LTD.
,' Arcade Center - 1st Floor
King Fahd Road
P.O.Box 295320 R iyadh 11351

HUAWEI �:��o�6a:���\�t
a ia e

�oho��� ;-��1326

Title 3462
Site No.2677

GSM OUT DOOR SITE LAYOUT


1---\. GSM OUT DOOR SITE LAYOUT
' .

�-- SCALE: Designed By: SHASCO Scale: 1:25 Date: 11-11-2019


1:25
Drawn By: SHAHID Drawing No.:
Checked QA:
3462
Approved By:
Etihad Etisalat Company
Hardware Relocation Form

Project Title Hardware Relocation Project ID 56A04LD

Project Sponsor Mr. Saeed Date 02-June-2022

PROJECT EQUIPMENTS

The Project Team representatives formally perform Hardware Relocation on operational routers as the following:

# Item Description From Site Slot To Site Slot SN

1 Optical Transceiver W2399-ICSG-HU01 0/4/1 W3462-ICSG-HU01 0/2/1


(SFP+,1310nm,10Gb/s,-8.2~0.5dBm,- EM195300030583
12.6dBm,LC,SM,10km)
Optical Transceiver
2 W2399-ICSG-HU01 W3462-ICSG-HU01 0/2/3 MB20321060463
(SFP+,1310nm,10Gb/s,-8.2~0.5dBm,- 0/2/8
12.6dBm,LC,SM,10km)
STATEMENT OF FORMAL HARDWARE RELOCATION

The undersigned Project team representative(s) formally performing Hardware Relocation, and the period between dismantling and
installing will be under project responsibility in case of card damage (misuse, stolen, broken)
Project team Representative(s)

Name Name

Position Position

Signature Signature

Date Date

Operations and Maintenance Representative(s)

Name Name

Position Position

Signature Signature

Date Date