RSK-GWL-ELECTRICAL/NORTH CENTRAL RLY

TENDER DOCUMENT
Tender No: ElectricalTender-3-2022 Closing Date/Time: 22/07/2022 15:00

SEE acting for and on behalf of The President of India invites E-Tenders against Tender No ElectricalTender-3-2022 Closing
Date/Time 22/07/2022 15:00 Hrs. Bidders will be able to submit their original/revised bids upto closing date and time only. Manual offers
are not allowed against this tender, and any such manual offer received shall be ignored.

1. NIT HEADER

Name of Work Green Co certification work for three year at Rail Spring Karkhana Sithouli,Gwalior
Bidding type Normal Tender
Tender Type Open Bidding System Single Packet System
Tender Closing Date Time 22/07/2022 15:00 Date Time Of Uploading Tender 13/06/2022 16:01
Pre-Bid Conference
No Pre-Bid Conference Date Time Not Applicable
Required
Advertised Value 474360.00 Tendering Section RSK/ELECT.
Bidding Style Single Rate for Tender Bidding Unit Above/Below/Par
Earnest Money (Rs.) 9500.00 Validity of Offer ( Days) 60
Tender Doc. Cost (Rs.) 0.00 Period of Completion 36 Months
Contract Type Works Contract Category Expenditure
Are Joint Venture (JV) firms
Bidding Start Date 08/07/2022 No
allowed to bid
Ranking Order For Bids Lowest to Highest Expenditure Type Capital (WMS)

2. SCHEDULE

S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding
Unit
Schedule A-Green Co certification work for three year at Rail Spring Karkhana Sithouli,
474360.00
Gwalior.Rates are inclusive 18% GST as applicable.
1 1.00 Job 474360.00 474360.00 AT Par 474360.00
Description:- Green Co certification work for three year at Rail Spring Karkhana Sithouli, Gwalior as per
description as under:- Sub item no.1.:-Training program on Green Co Rating & preparation of documents. Sub
1 item no.2:-Handholding visit of Pre-assessment visit. Sub item no.3:-Additional handholding visit (if required). Sub
item no.4:-Final site visit and assessment. Sub item no.5:-Certification and award of Green Co Rating. Sub item
no.6:- Report on opportunities for improvement/feedback report for the unit. Sub item no.7:- Annual Sustenance
review 1 1st year after Rating. Sub item no.8:- Annual Sustenance review 2 2nd year after Rating.

3. ITEM BREAKUP

No item break up added

4. ELIGIBILITY CONDITIONS

Special Technical Criteria

S.No. Description Confirmation Remarks Documents


Required Allowed Uploading
The Tenderer should be Confederation of Indian Industry (CII) or approved Green Co
Allowed
1 facilators of CII or CII certified Green Co facilitator and should submit a copy of the No No
(Mandatory)
same along with offer otherwise his offer will be summarily rejected.

Submission of Document Verification Certificate

S.No. Description Confirmation Remarks Documents


Required Allowed Uploading
Please submit a certificate in the prescribed format (please download the format from the
link given below) for verification / confirmation of the documents submitted for
compliance of eligibility / qualifying criteria. Non submission of the certificate, or Allowed
1 No No
submission of certificate either not properly filled in, or in a format other than the (Mandatory)
prescribed format shall lead to summary rejection of your offer.
( Click here to download the Format of Self Certificatio)

5. COMPLIANCE

Commercial-Compliance

Pa g e 1 o f 4 Ru n Da te/Time: 13/0 6 /2 0 2 2 16 :0 2 :16


RSK-GWL-ELECTRICAL/NORTH CENTRAL RLY
TENDER DOCUMENT
Tender No: ElectricalTender-3-2022 Closing Date/Time: 22/07/2022 15:00

S.No. Description Confirmation Remarks Documents


Required Allowed Uploading
Completion period:- The works are required to be completed within a period of
1 No No Not Allowed
03 years from the date of issue of acceptance letter.
Payment Term:- Payment shall be made after successful completion of sub
item wise work as per schedule on submission of bill /invoice by the firm as
2 follows:- 1.On completion of work from Sub item no.1to 6.-70% of total cost of No No Not Allowed
work 2.On completion of work of Sub item no.7.-15% of total cost of work 3.On
completion of work of Sub item no.8.-15% of total cost of work
3 PG&SD shall be released after completion of work and passing of final bill. No No Not Allowed
Penalty Clause:- The penalty will be imposed for default on any terms and
conditions. In case of non compliance of any terms and conditions penalty
minimum of Rs. 10000/- per case shall be imposed on defaulting contractor.
4 Maximum penalty will be decided by the contract signing authority of RSK No No Not Allowed
according to the situation case as arises. Railway administration may waive or
lower the penalty imposed subject to submission of genuine and satisfactory
reasons
Please submit your bank account details i.e. Name of the bank along with
Allowed
5 Bank Branch Code, IFSC Code, Beneficiary Name,Account Number,Type of No No
(Mandatory)
account ,PAN and GST Number (Annexure-XI)
Please enter the percentage of local content in the material being offered.
Please enter 0 for fully imported items, and 100 for fully indigenous items. The Allowed
6 No Yes
definition and calculation of local content shall be in accordance with the Make (Optional)
in India policy as incorporated in the tender conditions.

General Instructions

S.No. Description Confirmation Remarks Documents


Required Allowed Uploading
The offer must be submitted on line on IREPS website as per time and date
1 No No Not Allowed
fixed for receipt of offer in tender notice/NIT.
The rates quoted on IREPS against all schedule items of Schedule-A should
2 No No Not Allowed
be inclusive of taxes/duties/GST.
Contractor has to ensure to pay wages to their deployed workers under this
3 No No Not Allowed
contract as per minimum wages during execution of contract period.
Contractor shall also have to follow all the statutory requirement of Central &
4 No No Not Allowed
state Govt.Rules & regulation & subsequent amendments.
Tenderer must visit the RSK and assess the complete work to be done before
5 No No Not Allowed
submitting the offer.
Tenderer should submit the GSTN registration copy & PAN card copy along
6 No No Not Allowed
with offer
BID SECURITY DEPOSIT:-The procedure for obtaining Bid Security Deposit as
7 No No Not Allowed
mentioned in para-5 of Part-I of GCC April 2022.
PERFORMANCE GUARANTEE- The procedure for obtaining Performance
8 Guarantee as mentioned in para-16.4 of Part-II of GCC April 2022. Also, FDR No No Not Allowed
in favour of WAO/RSK/STLI (free from any encumbrance) may be accepted.
SECURITY DEPOSIT:-The procedure for obtaining Security Deposit as
9 No No Not Allowed
mentioned in para-16.1 of Part-II of GCC April 2022.

Technical-Compliances

S.No. Description Confirmation Remarks Documents


Required Allowed Uploading
Scope of Work: - Tenderer is required to quote for the work of "Green Co
1 No No Not Allowed
certification work for three year at Rail Spring Karkhana Sithouli,Gwalior"
Description of Work The object of this work is to provide GreenCo rating
2 certificate to Rail Spring Karkhana Sithouli,Gwalior by Green Co certification No No Not Allowed
work for three year at Rail Spring Karkhana Sithouli,Gwalior

Pa g e 2 o f 4 Ru n Da te/Time: 13/0 6 /2 0 2 2 16 :0 2 :16


RSK-GWL-ELECTRICAL/NORTH CENTRAL RLY
TENDER DOCUMENT
Tender No: ElectricalTender-3-2022 Closing Date/Time: 22/07/2022 15:00

The work should be carried out with following technical requirements:- Training
program on Green Co Rating & preparation of documents (Sub item no.1):-
Tenderer should help to apply for GreenCo rating through registration form to
be submit to Confederation of Indian Industry (CII).After confirmation from CII
validating the registration, tenderer should conduct a training program for unit
to help RSK team to understand the concepts addressed under the GreenCo
framework, impart training & awareness to functional team on GreenCo Rating
parameters, Share National & Global best practices in Green, Share best
practices from GreenCo rated companies, understand the operations of
workshop and their current level of green performance, Identify gaps/ short
term/long term improvement opportunities jointly with the RSK team, GreenCo
rating introduction & methodology, Energy Efficiency water conservation,
Renewable Energy,GHG Mitigation, waste Management, Material conservation
and recyclability, Green Supply Chain, Product Stewardship, Life Cycle
Assessment, Eco friendliness and innovation etc. Handholding visit of Pre-
assessment visit (Sub item no.2):-Tenderer should provide necessary support
to RSK team through handholding site visit for completion of GreenCo rating
program & detailed questionnaires to RSK team to understand the
data/document requirement. RSK will submit necessary data and documents
as per guidelines of the rating. Tenderer should suggest & guide RSK team in
implementing short term improvement measures, check & validate the data
3 adequacy under GreenCo guidelines and communicate the gapes to RSK No No Not Allowed
team, Facilitates RSK to network with service providers as required. Additional
handholding visit (If required) (Sub item no.3): - Tenderer should conduct
additional handholding pre assessment visit if required. Final site visit and
assessment (Sub item no.4):-Tender should arrange final site visit &
assessment for final evaluation by CII team, experts, assessors etc what so
ever as per guidelines of rating. Certification and award of Green Co Rating
(Sub item no.5):-Tenderer will arrange to provide GreenCo rating certificate to
Rail Spring Karkhana valid for a period of three years. Report on opportunities
for improvement/feedback report for the unit (Sub item no.6):-Tenderer should
arrange to submit findings of GreenCo rating assessment indicating current
performance, best practices and opportunities/feedback report for further
improvement in green. Annual Sustenance review 1 (1st year after Rating)
(Sub item no.7):-Tenderer should conduct Annual Sustenance review 1 (1st
year after Rating) to judge improvement of performance of Rail Spring
Karkhana and arrange to apply for re-assessment to better rating timely.
Annual Sustenance review 2 (2nd year after Rating) (Sub item no.8):-
Tenderer should conduct Annual Sustenance review 2 (2nd year after Rating)
to judge improvement of performance of Rail Spring Karkhana and arrange to
apply for re-assessment to better rating timely. In addition to above if any work
is required for GreenCo certification, work will be carried out by the contractor
free of cost.

Undertakings

S.No. Description Confirmation Remarks Documents


Required Allowed Uploading
I/We also hereby agree to abide by the Indian Railways Standard General
Conditions of Contract April-2022, with all correction slips up-to-date and to
carry out the work according to the Special Conditions of Contract and
1 No No Not Allowed
Specifications of materials and works as laid down by Railway in the annexed
Special Conditions/Specifications, Standard Schedule of Rates (SSOR) with all
correction slips up-to-date for the present contract.
I/Wehave read the various conditions to tender attached hereto and agree to
abide by the said conditions. I/We also agree to keep this offer open for
acceptance for a period of 60 days from the date fixed for closing of the tender
and in default thereof, I/We will be liable for forfeiture of my/our "Bid Security".
2 No No Not Allowed
I/We offer to do the work for Railway, at the rates quoted in the attached bill(s)
of quantities and hereby bind myself/ourselves to complete the work in all
respects withinmonths from the date of issue of letter of acceptance of the
tender.
I/We herby confirm that any condition having financial repercussions, if quoted
by us anywhere else including attached documents shall not be considered for
3 deciding inter-se ranking. However, Railways shall have the right to No No Not Allowed
incorporate any such condition quoted by us.in the contract, at their discretion,
if contract is placed on us.

Pa g e 3 o f 4 Ru n Da te/Time: 13/0 6 /2 0 2 2 16 :0 2 :16


RSK-GWL-ELECTRICAL/NORTH CENTRAL RLY
TENDER DOCUMENT
Tender No: ElectricalTender-3-2022 Closing Date/Time: 22/07/2022 15:00

I/We have carefully gone through the scope of work/specifications, Special


4 terms and conditions etc. attached with the tender documents and inspected No No Not Allowed
the site as considered necessary.

6. Documents attached with tender

S.No. Document Name Document Description


GCC_April-2022_2022_CE-
1 I_CT_GCC- GCC APRIL 2022
2022_POLICY_27.04.22_1.pdf
E-
2 GREEN CO CERTIFICATION TENDER DOCUM
TenderdocumentofGreenCorating_1.pdf

This tender complies with Public Procurement Policy (Make in India) Order 2017, dated 15/06/2017, issued by
Department of Industrial Promotion and Policy, Ministry of Commerce, circulated vide Railway Board letter no.
2015/RS(G)/779/5 dated 03/08/2017 and 27/12/2017 and amendments/ revisions thereof.

As a Tender Inviting Authority, the undersigned has ensured that the issue of this tender does not violate provisions of
GFR regarding procurement through GeM.

Signed By: ROOPESH KUMAR BAGHELA

Designation : SEERSK/STLI/GWL

Pa g e 4 o f 4 Ru n Da te/Time: 13/0 6 /2 0 2 2 16 :0 2 :16