22KC0001 CONTRACTUAL DATA


(Rehabilitation/ Reconstruction of National Roads with Slips, Slope
Collapse and Landslide along Sayre Highway K1459+735 - K1459+798)
Contract Amount: 3,818,382.02

Effectivity Date: February 10, 2022

Calendar Days: 96

Revised CD no. 1: ______

Revised CD no. 2: ______

Original Expiry Date: May 16, 2022

DPWH Project Engineer: Orlando V. Mancao Jr.-PE I (4372)

DPWH Materials Engineer: Khem M. Oche-ME II (D2-00114)

MMEI Bid Project Engineer Noelleen R. Frias

MMEI Project Engineer: Crisanto Egargin

MMEI Materials Engineer: Marilie A. Magahud-ME I (6737)

A Quality Control Program

B Monthly Materials Progress Report

C Sample Cards

D DPWH/3RD Party Test Results

E Laboratory Test Results

F Concrete Mix Design

G Accreditation of Materials Engineer

H Transmittals
TABLE OF CONTENTS

22KC0004 CONTRACTUAL DATA


(Preventive Maintenance along Sayre Highway K1470+026 - K1470+920)
Contract Amount: 31,358,938.23

Effectivity Date: March 15, 2022

Calendar Days: 102

Revised CD no. 1: ______

Revised CD no. 2: ______

Original Expiry Date: June 24, 2022

DPWH Project Engineer: Erna Lou B. Amores - PE I

DPWH Materials Engineer: Loreto L. Mahilum-ME II (D2-00556)

MMEI Bid Project Engineer Nessan Apilan

MMEI Project Engineer: Lea Jean Achacoso

MMEI Materials Engineer: Marilie A. Magahud-ME I (6737)

A Quality Control Program

B Monthly Materials Progress Report

C Sample Cards

D DPWH/3RD Party Test Results

E Laboratory Test Results

F Concrete Mix Design

G Accreditation of Materials Engineer

H Transmittals

TABLE OF CONTENTS
22KC00013 CONTRACTUAL DATA
(Road Widening along Kibawe-Kadingilan-Kalilangan Rd. K1611+895 - K1612+944)
Contract Amount: 46,397,780.05

Effectivity Date: February 10, 2022

Calendar Days: 268

Revised CD no. 1: ______

Revised CD no. 2: ______

Original Expiry Date: November 4, 2022

DPWH Project Engineer: Ramil Giovanni T. Kintanar - PE III (4077)

DPWH Materials Engineer: Intan O. Carim - ME II (D2-00705)

MMEI Bid Project Engineer Irve C. Licardo

MMEI Project Engineer: Sunshine Binahon

MMEI Materials Engineer: Kezia B. Lasquite (4193)

A Quality Control Program

B Monthly Materials Progress Report

C Sample Cards

D DPWH/3RD Party Test Results

E Laboratory Test Results

F Concrete Mix Design

G Accreditation of Materials Engineer

H Transmittals

TABLE OF CONTENTS
22KC00014 CONTRACTUAL DATA
(Road Widening along Sayre Highway K1447+900 - K1449+420)
Contract Amount: 84,354,363.58

Effectivity Date: March 3, 2022

Calendar Days: 336

Revised CD no. 1: ______

Revised CD no. 2: ______

Original Expiry Date: February 1, 2023

DPWH Project Engineer: Bernard D. Apolinario - PE 1 (5730)

DPWH Materials Engineer: Khem M. Oche - ME II (D2-00114)

MMEI Bid Project Engineer Ian Butch M. Tipan

MMEI Project Engineer: Crisanto Egargin

MMEI Materials Engineer: Kathlyn Elizabeth A. Chan (6896)

I Quality Control Program

J Monthly Materials Progress Report

K Sample Cards

L DPWH/3RD Party Test Results

M Laboratory Test Results

N Concrete Mix Design

O Accreditation of Materials Engineer

P Transmittals

TABLE OF CONTENTS

22KC0035 CONTRACTUAL DATA


(Widening of Permanent Bridge Nabaliwa Br. (B01089MN) along Barandias-
Dominorog Road)
Contract Amount: 23,549,944.60

Effectivity Date: March 15, 2022

Calendar Days: 296

Revised CD no. 1: _____

Revised CD no. 2: _____

Original Expiry Date: January 4, 2023

DPWH Project Engineer: Michael J. Doligol - JPE (5749)

DPWH Materials Engineer: Helen H. Moneva - ME I (D1-00768)

MMEI Bid Project Engineer Kristel Mae C. Cadungon

MMEI Project Engineer: Nelda Simudlan

MMEI Materials Engineer: Excellee Joy N. Caseres (6890)

A Quality Control Program

B Monthly Materials Progress Report

C Sample Cards

D DPWH/3RD Party Test Results

E Laboratory Test Results

F Concrete Mix Design

G Accreditation of Materials Engineer

H Transmittals

TABLE OF CONTENTS

22KC0036 CONTRACTUAL DATA


(Construction of Flood Control Structure along Maramag-Maradugao Rd
(Downstream), Macapantig Bridge with Slope Protection)
Contract Amount: 39,004,699.96

Effectivity Date: February 21, 2022

Calendar Days: 262

Revised CD no. 1: ______

Revised CD no. 2: ______

Original Expiry Date: November 9, 2022

DPWH Project Engineer: Ramil Giovanni T. Kintanar - PE III (4077)

DPWH Materials Engineer: Helen H. Moneva - ME I (D1-00768)

MMEI Bid Project Engineer Ronald Peñas

MMEI Project Engineer: James Peter Olinan

MMEI Materials Engineer: Lloyd B. Banzon (1916)

I Quality Control Program

J Monthly Materials Progress Report

K Sample Cards

L DPWH/3RD Party Test Results

M Laboratory Test Results

N Concrete Mix Design

O Accreditation of Materials Engineer

P Transmittals

TABLE OF CONTENTS

22KC0049 CONTRACTUAL DATA


(Preventive Maintenance of Road; Asphalt Overlay along Sayre Highway
K1446+154 - K1447+652)
Contract Amount: 49,897,148.23

Effectivity Date: March 21, 2022

Calendar Days: 132

Revised CD no. 1: ______

Revised CD no. 2: ______

Original Expiry Date: July 30, 2022

DPWH Project Engineer: Orlando V. Mancao Jr. - PE I (4372)

DPWH Materials Engineer: Khem M. Oche - ME II (D2-00114)

MMEI Bid Project Engineer Willah Mae V. Saligumba

MMEI Project Engineer: Lea Jean Achacoso

MMEI Materials Engineer: Ronald C. Bongocan (0418)

Q Quality Control Program

R Monthly Materials Progress Report

S Sample Cards

T DPWH/3RD Party Test Results

U Laboratory Test Results

V Concrete Mix Design

W Accreditation of Materials Engineer

X Transmittals

TABLE OF CONTENTS

22KC0050 CONTRACTUAL DATA


(Preventive Maintenance of Road; Asphalt Overlay Along Sayre Highway
K1472+388 - K1474+090)
Contract Amount: 56,156,516.90

Effectivity Date: March 21, 2022

Calendar Days: 138

Revised CD no. 1: ______

Revised CD no. 2: ______

Original Expiry Date: August 5, 2022

DPWH Project Engineer: Erna Lou B. Amores - PE I

DPWH Materials Engineer: Loreto L. Mahilum - ME II (D2-00556)

MMEI Bid Project Engineer Leonardo G. Paulican

MMEI Project Engineer: Lea Jean Achacoso

MMEI Materials Engineer: Myrna M. Valenzuela (5323)

I Quality Control Program

J Monthly Materials Progress Report

K Sample Cards

L DPWH/3RD Party Test Results

M Laboratory Test Results

N Concrete Mix Design

O Accreditation of Materials Engineer

P Transmittals

TABLE OF CONTENTS

22KC0056 CONTRACTUAL DATA


(Widening of Permanent Bridge - Huwagon Br. (B01092MN) along Barandias -
Dominorog Rd.)
Contract Amount: 21,713,054.85

Effectivity Date: February 21, 2022

Calendar Days: 295

Revised CD no. 1: ______

Revised CD no. 2: ______

Original Expiry Date: December 12, 2022

DPWH Project Engineer: Michael J. Doligol - JPE (5749)

DPWH Materials Engineer: Helen H. Moneva - ME I (D1-00768)

MMEI Bid Project Engineer Marjorie R. Dacut

MMEI Project Engineer: Nelda Simudlan

MMEI Materials Engineer: Lloyd B. Banzon (1916)

Q Quality Control Program

R Monthly Materials Progress Report

S Sample Cards

T DPWH/3RD Party Test Results

U Laboratory Test Results

V Concrete Mix Design

W Accreditation of Materials Engineer

X Transmittals

TABLE OF CONTENTS

22KC0008 CONTRACTUAL DATA


Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Sayre
Highway K1456+688 – K1457+363, K1458+305 – K1458+686, K1463+689 – K1463+794
Contract Amount: 23, 285, 404.44

Effectivity Date: April 11, 2022

Calendar Days: 198

Revised CD no. 1: ______

Revised CD no. 2: ______

Original Expiry Date: October 25, 2022

DPWH Project Engineer: Orlando V. Mancao Jr. - PE I (4372)

DPWH Materials Engineer: Khem M. Oche - ME II (D2-00114)

MMEI Bid Project Engineer Ofelia A. Adlaon

MMEI Project Engineer: John Michael Montecalvo

MMEI Materials Engineer: Odessa Jed Dag-o (6915)

A Quality Control Program

B Monthly Materials Progress Report

C Sample Cards

D DPWH/3RD Party Test Results

E Laboratory Test Results

F Concrete Mix Design/ Job Mix Design

G Accreditation of Materials Engineer

H Transmittals
A I Q A I Q A I Q

B J R B J R B J R

C K S C K S C K S

D L T D L T D L T

E M U E M U E M U

F N V F N V F N V

G O W G O W G O W

H P X H P X H P X

A I Q A I Q A I Q

B J R B J R B J R

C K S C K S C K S

D L T D L T D L T

E M U E M U E M U

F N V F N V F N V

G O W G O W G O W
22KC0008

22KC0004

22KC0013

22KC0014

22KC0035

22KC0036

22KC0049

22KC0050

22KC0056

H P X H P X H P X

You might also like