You are on page 1of 7

MTO

69946-01-01-FE-000250
A545-00-161-RFM-HTR-LS-0598/R1
Erection MTO
Rev. 1

AL Project Number 69946


Project Name DORC Reformer EP

PROJECT APPROVALS

Prepared, revised Checked Approved


Rev. Remark, kind of revision
Name Date Name Name Date Status
0 SHA 18.10.2017 SKR BZM 20.10.2017 RFR Ready for Review
1 SHA 01.02.2018 SKR BZM 01.02.2018 AFC Approved for Construction

Table of Revisions

Section Description
all updated weights and quantities

Page 1 of 7
MTO

69946-01-01-FE-000250
A545-00-161-RFM-HTR-LS-0598/R1
Erection MTO
Rev. 1

AL Project Number 69946


Project Name DORC Reformer EP

Mechanical Erection

a b c d e
Reference Description Quantity Quantity (sum_ Unit
for 1 train for both trains
1 Steam Methane Reformer (radiant section) Document numbers
1.1 Steel Structures: (sum) 639 1278 t
1.2 Reformer Box (sum) 240 479 t A545-00-161-RFM-HTR-IS-1056
1.3 Base Frame 26 52 t A545-00-161-RFM-HTR-IS-1057
1.4 Bottom Panels 42 83 t A545-00-161-RFM-HTR-IS-1058
1.5 Side Wall Panels 76 152 t A545-00-161-RFM-HTR-IS-1059
1.6 End Wall Panels 43 86 t A545-00-161-RFM-HTR-IS-1060
1.7 Arch Panels 40 79 t A545-00-161-RFM-HTR-IS-1061
1.8 Counterweight Guiding Frames 10 20 t A545-00-161-RFM-HTR-IS-1062
1.9 Access Doors - 8 pcs 3 6 t A545-00-161-RFM-HTR-IS-1063
1.10 Bolts / nuts / washers 3 7 t A545-00-161-RFM-HTR-IS-1064
1.11 Flue Gas Duct (sum) 43 87 t A545-00-161-RFM-HTR-DG-1551
1.12 Panels 22 43 t A545-00-161-RFM-HTR-DG-1552
1.13 Steel Structure 21 43 t A545-00-161-RFM-HTR-DG-1553
1.14 Bolts / nuts / washers 0,4 1 t A545-00-161-RFM-HTR-DG-1554
1.15 Penthouse 199 398 A545-00-161-RFM-HTR-DG-1399
1.16 Penthouse steel structure 177 353 t A545-00-161-RFM-HTR-DG-1400
1.17 Trapezoidal Cladding for Penthouse including roof ventilation
17 34 t
A545-00-161-RFM-HTR-DG-1401
1.18 Bolts / nuts / washers 5 10 t A545-00-161-RFM-HTR-DG-1402
1.19 Walkways Structure 45 90 t A545-00-161-RFM-HTR-DG-1224
1.20 Walkways Railings and Ladders 3 6 t A545-00-161-RFM-HTR-DG-1239
1.21 Walkways Gratings 23 46 t A545-00-161-RFM-HTR-DG-1239
1.22 Protective Fences on Arch 4 7 t A545-00-161-RFM-HTR-DG-1239
1.23 Bolts / nuts / washers 1 2 t A545-00-161-RFM-HTR-DG-1239
1.24 Stair Case Structure 28 56 t A545-00-161-RFM-HTR-DG-1235
1.25 Stair Case Railings 1 3 t A545-00-161-RFM-HTR-DG-1235
1.26 Stair Case Gratings 1 3 t A545-00-161-RFM-HTR-DG-1235
1.27 Bolts / nuts / washers 0 0 t A545-00-161-RFM-HTR-DG-1235
1.28 Combustion Air System 51 101 t A545-00-161-RFM-HTR-DG-1512
1.29 Air Duct Header 10 20 t A545-00-161-RFM-HTR-DG-1513
1.30 Air Duct Outside 15 30 t A545-00-161-RFM-HTR-DG-1514
1.31 Air Duct Manifolds 25 50 t A545-00-161-RFM-HTR-DG-1515
1.32 Seal welding of reformer parts, comprising: 965 1929 m
1.33 Seal welding of walls 468 936 m
1.34 Seal welding at arch level 135 271 m
1.35 Seal welding at bottom level 140 281 m
1.36 Seal welding of Air Ducts, Manifold 20 40 m
1.37 Seal welding of Air Header 8 16 m
1.38 Seal welding of Flue Gas Duct 193 386 m
1.39 Miscellaneous
1.40 Sight holes for steam reformer: 53 pcs ( 28 kg / each) 2 3 t A545-00-161-RFM-HTR-DG-1599
1.41 Exp joints for burner with flange conn. to the air duct (60kg each) 105 210 pcs
1.42 Fabric Bellows for C.A. manifolds 7 14 pcs
1.44 Fabric Bellows for SMR Tubes 520 pcs (4 kg each) t
1.46 Burners kg each: total: 40 79 t
1.47 Type 8: 381 75 150 pcs A545-00-161-RFM-HTR-DG-3803
1.48 Type 7: 369 30 60 pcs A545-00-161-RFM-HTR-DG-3804
1.49 Gas Inlet System, consisting of: (sum) 64 127 t A545-00-161-RFM-HTR-DG-3402
1.50 6x Feed line, 1x header 22"x37mm 7 14 pcs A545-00-161-RFM-HTR-DG-3402
1.51 3x Inlet Manifolds 18"x 32mm 6 12 pcs A545-00-161-RFM-HTR-DG-3402
1.52 pigtails 1,25"x4mm 324 648 pcs A545-00-161-RFM-HTR-DG-3402
1.53 Welding SA358 Gr347 H 22" feedline (559 x thk 37 mm) 176 352 Inch-Dia A545-00-161-RFM-HTR-DG-3402
1.54 Welding SA358 Gr347 H 18" manifolds (457 x thk 32 mm) 72 144 Inch-Dia A545-00-161-RFM-HTR-DG-3402
1.55 Welding SA312 TP347H 1"25 pigtails to manifolds 810 1620 Inch-Dia A545-00-161-RFM-HTR-DG-3402
1.56 Constant Hangers System for Inlet will be indicated later

Page 2 of 7
MTO

69946-01-01-FE-000250
A545-00-161-RFM-HTR-LS-0598/R1
Erection MTO
Rev. 1

AL Project Number 69946


Project Name DORC Reformer EP
1.57 Constant Spring Hangers - Inlet 22 44 pcs
1.58 Earthquake 2 4 pcs
1.59 Spring Supports 1 2 pcs
1.60 Counter weights 40 80 t
1.61 Counterweights - Suspension System 21 42 t
1.62 Catalyst tubes: (length = 13,88 m) 324 pcs / 484 kg each 157 314 t A545-00-161-RFM-HTR-DG-3203
1.63 Welding: Weld. consumables with Equipment joints: 324 x 4" thk 10 mm - - A545-00-161-RFM-HTR-DG-3203
1.64 Welding GX45NiCrSiNbTi35-25 (G4852 Micro R) OD:120mm ID:100mm WT = 10 mm 1296 2592 Inch-Dia A545-00-161-RFM-HTR-DG-3203
1.65 Insulation Inserts for Catalyst Tubes (after catalyst fillling) 324 648 pcs A545-00-161-RFM-HTR-DG-3203
1.66 Outlet system including refractory lining, consisting of: (sum) 62 125 t A545-00-161-RFM-HTR-DG-3602
1.67 Outlet manifolds: delivered in 18 pcs - - A545-00-161-RFM-HTR-DG-3602
1.68 Unit M1A ÷ M1F x 6 6 3,0821 18 37 t A545-00-161-RFM-HTR-DG-3602
1.69 Unit M2A ÷ M2F x 6 6 2,467 15 30 t A545-00-161-RFM-HTR-DG-3602
1.70 Unit M1A ÷ M3F x 6 6 3,0974 19 37 t A545-00-161-RFM-HTR-DG-3602
1.71 Cross header: delivered in 3 pcs - - A545-00-161-RFM-HTR-DG-3602
1.72 Unit C1 1 1,2726 1 3 t A545-00-161-RFM-HTR-DG-3602
1.73 Unit C2 1 2,9111 3 6 t A545-00-161-RFM-HTR-DG-3602
1.74 Unit C3 1 2,7596 3 6 t A545-00-161-RFM-HTR-DG-3602
1.75 Unit C4 1 3,5615 4 7 t A545-00-161-RFM-HTR-DG-3602
1.76 Weld - Material: (Shell) A387 Gr.11 Cl.2 856mm x 20 34" 102 204 Inch-Dia A545-00-161-RFM-HTR-DG-3602
1.77 Weld: Material:(Shell) A387 Gr.11 Cl.2 976x25x 40" 160 320 Inch-Dia A545-00-161-RFM-HTR-DG-3602
1.78 Weld: Material: (Inliner) 630x3 4 pcs 7560 15120 A545-00-161-RFM-HTR-DG-3602
1.79 Weld: Material: (Inliner) 524x3 10 pcs 15720 31440 A545-00-161-RFM-HTR-DG-3602
1.80 Fuel Gas ( Tail Gas ) system 36" A545-00-161-RFM-HTR-IS-1613
1.81 Welding ASTM A106 GrB Piping 2" Balance line / Vent 14 28 Inch-Dia A545-00-161-RFM-HTR-IS-1614
1.82 Welding ASTM A106 GrB Piping 3" Balance line / Vent 21 42 Inch-Dia A545-00-161-RFM-HTR-IS-1615
1.83 Welding ASTM A106 Grb Piping 3" Branches to Burners 630 1260 Inch-Dia A545-00-161-RFM-HTR-IS-1616
1.84 Welding ASTM A106 GrB Piping 16" Manifolds 128 256 Inch-Dia A545-00-161-RFM-HTR-IS-1617
1.85 Welding ASTM A106 GrB Piping 18" Manifolds 360 720 Inch-Dia A545-00-161-RFM-HTR-IS-1618
1.86 Welding ASTM A106 GrB Piping 36" Header / Feed line 180 360 Inch-Dia A545-00-161-RFM-HTR-IS-1619
1.87 Fuel Gas ( Natural Gas ) system 16" A545-00-161-RFM-HTR-IS-1608
1.88 Welding ASTM A106 GrB Piping 2" Balance line / Vent 14 28 Inch-Dia A545-00-161-RFM-HTR-IS-1609
1.89 Welding ASTM A106 GrB Piping 3" Balance line / Vent 15 30 Inch-Dia A545-00-161-RFM-HTR-IS-1610
1.90 Welding ASTM A106 Grb Piping 1,5" Branches to Burners 315 630 Inch-Dia A545-00-161-RFM-HTR-IS-1611
1.91 Welding ASTM A106 GrB Piping 6" Manifolds 24 48 Inch-Dia A545-00-161-RFM-HTR-IS-1612
1.92 Welding ASTM A106 GrB Piping 8" Manifolds 80 160 Inch-Dia A545-00-161-RFM-HTR-IS-1613
1.93 Welding ASTM A106 GrB Piping 16" Header / Feed line 128 256 Inch-Dia A545-00-161-RFM-HTR-IS-1614
1.94 Erection of refractory lining, comprising:
1.95 Roof Ceramic Fiber Blanket 272 544 Rolls A545-00-161-RFM-HTR-DG-3902
Module 2952 5904 Pcs A545-00-161-RFM-HTR-DG-3902
Binder 300 600 kg A545-00-161-RFM-HTR-DG-3902
Stud Set for Modules Anchor Welding 2304 4608 Pcs A545-00-161-RFM-HTR-DG-3902
Blanket Retainer Pins Anchor Welding 1200 2400 Set A545-00-161-RFM-HTR-DG-3902
1.96 Walls RF1 and RF4 WDS Ultra Board 594 1188 Pcs A545-00-161-RFM-HTR-DG-3903
Calcium Silicate Board 10 20 Pcs A545-00-161-RFM-HTR-DG-3904
Ceramic Fiber Blanket 176 352 Rolls A545-00-161-RFM-HTR-DG-3904
Module 3314 6628 Pcs A545-00-161-RFM-HTR-DG-3904
Peep Doors-VFP 28 56 Pcs A545-00-161-RFM-HTR-DG-3904
Stud Set for Modules Anchor Welding 3268 6536 Pcs A545-00-161-RFM-HTR-DG-3904
1.97 Walls RFB and RFE WDS Ultra Board 690 1380 Pcs A545-00-161-RFM-HTR-DG-3905
Ceramic Fiber Blanket 214 428 Rolls A545-00-161-RFM-HTR-DG-3906
Module 4864 9728 Pcs A545-00-161-RFM-HTR-DG-3906
Peep Doors-VFP 24 48 Pcs A545-00-161-RFM-HTR-DG-3906
Stud Set for Modules Anchor Welding 4928 9856 Pcs A545-00-161-RFM-HTR-DG-3906
1.98 Floor High Duty Firebrick 6300 12600 Pcs A545-00-161-RFM-HTR-DG-3909
Insulating fire Brick 9350 18700 Pcs A545-00-161-RFM-HTR-DG-3909
Block 426 852 Pcs A545-00-161-RFM-HTR-DG-3909
Ceraboard 26 52 Pcs A545-00-161-RFM-HTR-DG-3909
Mortar 1500 3000 Kg A545-00-161-RFM-HTR-DG-3909
Ceramic Fiber Blanket 260 520 Rolls A545-00-161-RFM-HTR-DG-3909
Cerafibre Wool 650 1300 Kg A545-00-161-RFM-HTR-DG-3909
1.99 Tunnels Insulating fire Brick 9896 19792 Pcs A545-00-161-RFM-HTR-DG-3910

Page 3 of 7
MTO

69946-01-01-FE-000250
A545-00-161-RFM-HTR-LS-0598/R1
Erection MTO
Rev. 1

AL Project Number 69946


Project Name DORC Reformer EP
High Duty Firebrick 6684 13368 Pcs A545-00-161-RFM-HTR-DG-3910
Cover Tile 588 1176 Pcs A545-00-161-RFM-HTR-DG-3910
Ceramic Fiber Blanket 40 80 Rolls A545-00-161-RFM-HTR-DG-3910
Mortar 11600 23200 kg A545-00-161-RFM-HTR-DG-3910
hooks 280 560 Pcs A545-00-161-RFM-HTR-DG-3910
1.100 Flue Gas Outlet Duct Floor High Duty Firebrick 2350 4700 Pcs A545-00-161-RFM-HTR-DG-3915
Insulating fire Brick 2400 4800 Pcs A545-00-161-RFM-HTR-DG-3915
Block 208 416 Pcs A545-00-161-RFM-HTR-DG-3915
Ceramic Fiber Blanket 4 8 Rolls A545-00-161-RFM-HTR-DG-3915
Mortar 400 800 Kg A545-00-161-RFM-HTR-DG-3915
1.101 Flue Gas Duct Sidewall Ceramic Fiber Blanket 28 56 Rolls A545-00-161-RFM-HTR-DG-3913
Module 908 1816 Pcs A545-00-161-RFM-HTR-DG-3913
Stud Anchor Welding 1104 2208 Pcs A545-00-161-RFM-HTR-DG-3913
WDS Ultra Board 526 1052 Pcs A545-00-161-RFM-HTR-DG-3913
1.102 Flue Gas Duct Roof Ceramic Fiber Blanket 38 76 Rolls A545-00-161-RFM-HTR-DG-3914
Module 762 1524 Pcs A545-00-161-RFM-HTR-DG-3914
Stud Anchor Welding 1362 2724 Pcs A545-00-161-RFM-HTR-DG-3914
2 Waste Heat Recovery System (convection section)
2.1 Module #1 67 134 t A545-00-161-RFM-HTR-DG-2211
2.2 Module #2 106 212 t A545-00-161-RFM-HTR-DG-2211
2.3 Module #3 59 118 t A545-00-161-RFM-HTR-DG-2211
2.4 Module #5 115 230 t A545-00-161-RFM-HTR-DG-2211
2.5 Comb Air Ducts - Hot air From APH to Reformer 15 30 t A545-00-161-RFM-HTR-DG-2211
2.6 Comb Air Ducts From Fans to APH 52 104 t A545-00-161-RFM-HTR-DG-2211
2.7 APPARATUS - -
2.8 161-LZ-0002-VV2 PROCESS STEAM DRUM 48 96 t A545-00-161-RFM-HTR-DG-4544
2.9 161-LZ-0002-VV3 BD Drum 5 10 t A545-00-161-RFM-HTR-DG-4545
2.10 Steel Structures General: 60 120 t A545-00-161-RFM-HTR-DG-2211
2.11 Instrumentation - -
2.12 LG 2 4 pcs A545-00-161-RFM-HTR-DG-4544
2.13 PSV 2 4 pcs A545-00-161-RFM-HTR-DG-4544
2.14 Quench Cooler 6 pcs 6 12 pcs A545-00-161-RFM-HTR-DG-4544
2.15 Actuator + Positioner 1 2 pcs A545-00-161-RFM-HTR-DG-4544
2.16 Shutt-off valves 3/4", 1/2", 2", 3" 48 96 pcs A545-00-161-RFM-HTR-DG-4544
2.17 air ducts welding circural welded joint 57 114 m A545-00-161-RFM-HTR-DG-4544
3 AIR PREHEATERS
3.1 Cold Aph 161-LZ-0002-EE6 seal welding 15 Block done 173 346 m A545-00-161-RFM-HTR-MA-4634
3.2 Welding of return duct for Cold APH 6mm thick weld done 49 98 m A545-00-161-RFM-HTR-MA-4634
3.3 Welding of flanges on Cold APH 8mm thick weld done 80 160 m A545-00-161-RFM-HTR-MA-4634
3.4 Hot APH 161-LZ-0002-EE4 seal welding 2 Block done 30 60 m A545-00-161-RFM-HTR-MA-4615
3.5 Welding of flanges on Hot APH 8mm thick weld done 60 120 m A545-00-161-RFM-HTR-MA-4615
3.6 Cold APH weight 15 Block done 310 620 t A545-00-161-RFM-HTR-MA-4615
3.7 Hot APH weight 2 Block done 40 80 t A545-00-161-RFM-HTR-MA-4615
4 Process Gas Boiler
4.1 LW-0001 Process Gas Boiler 79 158 t A545-00-161-RFM-HTR-DG-4308
4.2 LZ-0002-VV1 Export Steam Drum 79 157 t A545-00-161-RFM-HTR-DG-4303
4.3 Piping Downcomer and Riser 37 75 t A545-00-161-RFM-HTR-DG-4304
4.4 Steel Str with supports and ladders 70 140 t A545-00-161-RFM-HTR-DG-2840
4.5 Intrumentation - -
4.6 Actuator 1 2 pcs A545-00-161-RFM-HTR-DG-4304
4.7 LG 2 4 pcs A545-00-161-RFM-HTR-DG-4304
4.9 Safety Valves (Flanged Design) 2 4 pcs A545-00-161-RFM-HTR-DG-4304
4.10 Welding: NPS JOINTS - -
4.11 Downcomers 16 12 192 384 dia-inch A545-00-161-RFM-HTR-DG-4304
4.12 Risers 18 8 144 288 dia-inch A545-00-161-RFM-HTR-DG-4304
5 Flue Gas Stack 161-LZ-0007
5.1 Stack 4 module with refractory (before dryout) 184 368 t A545-00-161-RFM-HTR-IS-2506
5.2 Platforms, ladders, handrails (ACWL will be installed with platform) 3 7 t A545-00-161-RFM-HTR-DG-2507

Page 4 of 7
MTO

69946-01-01-FE-000250
A545-00-161-RFM-HTR-LS-0598/R1
Erection MTO
Rev. 1

AL Project Number 69946


Project Name DORC Reformer EP

Mechanical Erection

a b c d e
Reference Description Quantity Quantity (sum) Unit
for 1 train for both trains reference document
1 Rotating and Electrical
1.1 Combustion Air Blowers + Motors + VFD: (sum)
89 177 t
1.2 Combustion Air Fans 161-BL-0001A/B; 162-BL-0001A/B 34 68 t A545-00-161-RFM-RED-DG-8509
1.3 Air Inlet towers with silencers for Combustion Air Fans 161-BL-0001A/B; 162-BL-0001A/B 25 49 t A545-00-161-RFM-RED-DG-8509
1.4 Combustion Air Fans MV Motors 161-BL-0001A/B-M; 162-BL-0001A/B-M 11 22 t A545-00-161-RFM-ELE-DG-5610
1.5 VFDs for Combustion Air Fans MV Motors 161-BL-0001A/B-MVFD; 162-BL-0001A/B-MVFD 16 32 t A545-00-161-RFM-ELE-DG-5625
1.6 Common Lube Oil system 3 6 t A545-00-161-RFM-RED-DG-8560
1.7 Interconnecting lube oil lines for ID/FD fans 100 200 dia-inch will be indicated later
1.8 Flue Gas Fans + Motors + VFD: (sum) 55 110 t
1.9 Flue Gas Fan 161-BL-0002; 162-BL-0002 21 42 t A545-00-161-RFM-RED-DG-8608
1.10 Outlet duct with silencer 20 39 t A545-00-161-RFM-RED-DG-8608
1.11 Flue Gas Fan MV Motor 161-BL-0002-M; 162-BL-0002-M 7 14 t A545-00-161-RFM-ELE-DG-5610
1.12 VFD for Flue Gas Fan MV Motor 161-BL-0002-MVFD; 162-BL- 8 16 t A545-00-161-RFM-ELE-DG-5625

Page 5 of 7
69946-01-01-FE-000250
A545-00-161-RFM-HTR-LS-0598/R1
Erection MTO
Rev. 1

AL Project Number 69946


Project Name DORC Reformer EP

Insulation

a b c d e f g h i
Reference Description Quantity Unit reference document
1 SMR INLET SYSTEM insulation material cladding material Thickess [mm] 1 Train 2 Trains
1.1 Inlet Feed line - inside of Penthause MW SS 300 120 240 m2 A545-00-161-RFM-HTR-DG-3402
1.2 Inlet Feed line - outside of Penthause MW AL. 400 86 172 m2 A545-00-161-RFM-HTR-DG-3402
1.3 Inlet Header MW AL. 300 53 106 m2 A545-00-161-RFM-HTR-DG-3402
1.4 Manifolds MW AL. 300 190 380 m2 A545-00-161-RFM-HTR-DG-3402
1.5 Pigtails MW AL. 100 1435 2870 m2 A545-00-161-RFM-HTR-DG-3404
1.6 Balance Line MW AL. 50 15 30 m2 A545-00-161-RFM-HTR-DG-3402
2 SMR Combustion Air Supply System
2.1 Combustion Air Duct from APH Hot to Header MW AL. 200 320 640 m2 will be indicated later
2.2 Combusion Air Header MW AL. 200 210 420 m2 will be indicated later
2.3 Combustion Air Manifold MW AL. 200 466 932 m2 will be indicated later
2.4 Expansion Joint Inner Row MW AL. 50 250 500 m2 will be indicated later
2.5 Expansion Joint Outer Row MW AL. 50 100 200 m2 will be indicated later
3 PGB
3.1 Steam Drum 161-LZ-0002-VV1 MW AL. 130 100 200 m2 A545-00-161-RFM-HTR-DG-4303
3.2 PGB 161-LW-0001 MW AL. 200 75 150 m2 A545-00-161-RFM-HTR-DG-4304
3.3 Risers and downcomers MW AL. 110 88 176 m2 A545-00-161-RFM-HTR-DG-4304

Page 6 of 7
69946-01-01-FE-000250
A545-00-161-RFM-HTR-LS-0598/R1
Erection MTO
Rev. 1

AL Project Number 69946


Project Name DORC Reformer EP

Insulation

4 WHRS: i
4.1 Flue Gas Ducts MW AL. 100 260 520 will be indicated later
4.2 Steam Drum - 161-LZ-0002-VV2 MW AL. 150 62 124 m2 A545-00-161-RFM-HTR-DG-4544
4.3 Risers and downcomers MW AL. 110 78 156 m2 A545-00-161-RFM-HTR-DG-4569
A545-00-161-RFM-HTR-IS-2371,
Interconnecting piping - crossovers 160 158 316 m2 A545-00-161-RFM-HTR-IS-2376,
4.4 MW AL. A545-00-161-RFM-HTR-IS-2381
4.5 Steam pipe MW AL. 130 57 114 m2 A545-00-161-RFM-HTR-DG-2820
4.6 Cold Air Bypass Duct MW AL. 200 164 328 m2 will be indicated later
4.7 Air Duct From FD Fan To Cold APH MW AL. 200 276 552 m2 will be indicated later
4.8 Air Duct from Cold APH to Hot Aph MW AL. 200 264 528 m2 will be indicated later
4.9 Hot Air Bypass Duct MW AL. 200 203 406 m2 will be indicated later
4.10 APH Cold 161-LZ-0002-EE6 MW AL. 100 192 384 m2 A545-00-161-RFM-HTR-DG-4602
4.11 APH Hot 161-LZ-0002-EE4 MW AL. 150 30 60 m2 A545-00-161-RFM-HTR-DG-4603
5 Blow down
5.1 Blow Down Drum 161-LZ-0002-VV3 MW AL. 70 15 30 m2 A545-00-161-RFM-HTR-DG-4545
5.2 Blow down piping MW AL. 130 74 148 m2 A545-00-161-RFM-HTR-DG-2820
6 Others
A545-00-161-RFM-HTR-DG-3803,
6.1 Burners MW AL. 76 57 114 m2
A545-00-161-RFM-HTR-DG-3804
6.2 Fabric Bellows MW AL. 40 40 80 m2 will be indicated later

Page 7 of 7