MOM: - Minutes of meeting on the on PM Maintenance Process:-

1. General Maintenance order end to end process flow shown in the SAP Server
 Pre-requisites for end to end process flow
 Functional Location & Equipment
 General Task List
 Notification
 Maintenance Order
2. In PM Maintenance order Explained as shown in below.
 Stock Material (L) (Reservation Number for stock Material)
 Non-Stock Material (N) (Purchase Requisition for Non-Stock Material)
 External Service (PM03) (Purchase Requisition for External services)
 Internal Service (PM01) (Confirmation Number for Internal Service)
3. All above points will cover under PM module till PR creates. Once PR will create MM team
Convert that (PR-PO-MIGO-Service Entry Sheet).

4. Preventive Maintenance Process Flow:-


 Pre-requisites for preventive process flow
 Create Strategy
 Functional Location & Equipment
 General Task List
 Assign Strategy to General Task List
 Create Maintenance Item
 Assign Maintenance Item in Maintenance Plan
 Schedule Maintenance Plan
 As per schedule system generates maintenance orders

6. After generating maintenance orders same maintenance need to fallow the 2 nd point to complete the
process flow.

 As per SAP standard system generates PR through document types. Only one document type
allow to configure from PM end. Based on the configured document system generates service
PR and Non-stock PR.
 If two different document types required need to go for Enhancement
 While generating the PR Requisitioner will be mandatory

8) Pending Process need to cover from Neovatic end:

 Calibration Process
 Break-Down Process
 Multi-Counter Process