38.64 64.93
39.55 67.63
39.92 67.11
41.2 69.46
38.77 57.99
39.83 56.96
35.6 60.64
36.86 64.9
37.96 66.76
39.55 67.63
40.87 68.01
41.93 65.68
42.03 69.17
39.66 60.39
38.31 61.55
35.33 58.19
36.42 64.33
40.23 65.61
39.7823333740234 66.3829956054687
34.8345489501953 57.6198120117188
34.403564453125 59.8441619873047
39.2085418701172 58.7484474182129
34.42 47.52
37.87 62.03
39.9310874938965 67.6115646362305
42.06 68.44
42.8236656188965 70.7624206542969
43.268180847168 69.9665145874023
41.9457855224609 68.0595855712891
41.6528167724609 65.746223449707
Site Name Heramba Renewables Limited_ MCR 2
AC Capacity (MW) 10 MW
DC Capacity (MWp) 13.75 MW
MCR-2
60.51
60.88
62.59
64.77
66.16
61.16
57.94
53.7
54.33
54.08
52.08
55.47
61.78
59.04
52.45
60.09
61.78
65.62
65.72
58.11
61.48
60.44
62.91
62.61
57.17
57.20
66.56
67.42
60.51
56.08
Site Name Heramba Renewables Limited_ MCR 2
AC Capacity (MW) 10 MW
DC Capacity (MWp) 13.75 MW
MCR-2
43.74 63.61
44.31 68.06
43.93 69.57
42.76 60.00
41.93 62.30
44.47 65.95
43.13 59.21
43.21 56.48
42.75 57.98
42.56 56.12