You are on page 1of 5

Modul Production

Based on MonsoonSIM version: 8

Prepared by: Ilham Saud


Universitas Muhammadiyah Yogyakarta

All Rights reserved | www.MonsoonSIM.com Jun-15-2020 | Page 1 of 5


Modul Production
Prepared by: Ilham Saud
Universitas Muhammadiyah Yogyakarta

Table Of Content
MonsoonSIM Production Module .................................................................. 3
Background [Production Module] ................................................................... 3
Operating model [Production Module] ................................................................ 4
MonsoonSIM Production KPIs ..................................................................... 5

All Rights reserved | www.MonsoonSIM.com Jun-15-2020 | Page 2 of 5


Modul Production
Prepared by: Ilham Saud
Universitas Muhammadiyah Yogyakarta

MonsoonSIM Production Module

Background [Production Module]


The processes and methods used to transform tangible inputs (raw materials, semi-finished goods, subassemblies) and
intangible inputs (ideas, information, knowledge) into goods or services.

Read more: http://www.businessdictionary.com/definition/production.html

In MonsoonSIM, Production is focused on the transformation of raw materials into finished goods. It is one of the core
MonsoonSIM modules.

MonsoonSIM supports multiple levels of complexity. Learners are encouraged to start with the basic module, called Baseline
model, and slowly progress to more advanced functionalities.

Here are some of what you will learn in the MonsoonSIM Production (Baseline) :

Concept of Bill of Materials (BOM)


Concept of BOM Structures
Concept of production machines
Concept of asset depreciation
Concept of production capacity

Note: There is no pre-requisite to learning the MonsoonSIM Baseline concepts

In MonsoonSIM, the Production module is related to the following department (modules)

Finance (FIN)
Procurement (PMN)
Warehouse & Logistics (WHS)
MRP (MRP)
Maintenance (MNT)
Human Captial Management (HCM)

Note: There is no pre-requisite to learning the MonsoonSIM Baseline concepts

All Rights reserved | www.MonsoonSIM.com Jun-15-2020 | Page 3 of 5


Modul Production
Prepared by: Ilham Saud
Universitas Muhammadiyah Yogyakarta

Operating model [Production Module]


The following describes the operating model of MonsoonSIM Production module

Baseline:

Production requires machine(s)


There are a few types of production machine to choose from
Each production machine comes with limited capacity
Capacity is expressed in terms of Per Product Per Day
Production will happen as soon as enough raw materials are available
The components of raw materials required to make one product are defined in the Bill of Materials (BOM) structure
Finished goods produced are automatically stored in the warehouse
Production machines need to be maintained, otherwise, machine degradation will occur
Machine degradation will result in lower production capacity
Production machine will be depreciated based on the straight-line model
A machine can also be disposed of
When the machine is disposed of on, proper bookkeeping of the asset disposal can be explored in the Accounting
The priority of products to be produced can be defined
Staff Index affects the effectiveness of stock production. Hence, it is important to keep our staff index at 100% at all
times.
Players can analyze the sales performance and other useful intelligence by carefully examining the information from
the Business Intelligence explorer

All Rights reserved | www.MonsoonSIM.com Jun-15-2020 | Page 4 of 5


Modul Production
Prepared by: Ilham Saud
Universitas Muhammadiyah Yogyakarta

MonsoonSIM Production KPIs

1. Return on Asset
This is an indicator of how profitable a company is relative to its total assets. It measures how efficient a company is at using
its assets to generate earnings. Return on assets is displayed as a percentage and its calculated as:

ROA = Net Income / Total Assets

2. Production

3. Production
The total units of finished goods produced in-house.

4. Utilization - Machine Capacity


A measurement of how well the company utilizes its machine capacity.

It is displayed as a percentage and its calculated as:

Utilization (Machine capacity) = Total Unit Produced / Total Production Capacity of the Machines