REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS & HIGHWAYS


Office of the Building Official
CEBU CITY

RECOMMENDING APPROVAL:

HEAD SECTION DATE

APPROVED BY:

ACCU
UNIT E
BUILDING OFFICIAL DATE

PR

UNIT D

UNIT F

UNIT C

UNIT B

2 BDR SMALL
106.24 SQM.
1 BDR TYPE 1B 1 BDR TYPE 1B
58.50 QM. UNIT J 58.50 QM. UNIT L
UNIT G 1 BDR TYPE 1B
58.50 QM.
1 BDR TYPE 1B
58.50 QM.

UNIT H UNIT K

UNIT Q UNIT P UNIT O UNIT N

UNIT R
UNIT A
UNIT M

1 2IST FLOOR LOW RISE (W/ BI LEVEL) AIR-CONDITIONING AND VENTILATION LAYOUT

DRAWN BY: SARAH CARDO OWNER: PROJECT TITLE: HAVING REVIEWED THE SHEET CONTENTS: SHEET NO:
MAKATI DEVELOPMENT CORPORATION DATE: 01/07/2022 SUBMITTAL,WE CERTIFY
NAME SOUTHPORTAL PROPERTIES, INC. THAT IT CONFORMS TO 21ST FLOOR LOW RISE (W/ BI LEVEL)
THE ALCOVES
CHECKED BY: TEDD PLANCO, MEPF SUPERVISOR

DATE: 01/10/2022
TOMMY E. UY
PROJECT MANAGER
PROFESSIONAL

THE CONTRACT
AIR-CONDITIONING AND VENTILATION LAYOUT M1-22
PRC NO.: TIN NO.:
BV: R.B. FLORES, SR. MEPF
VALIDATED BY:
BV: G.M. JORDAN, MEPF INSPECTOR PTR NO.: DATE:
GEORGE B. BAUTISTA CONDITIONS IN ALL
DATE: 01/31/2022 ISSUED AT :
ALI-ALP HEAD
LOCATION: LUZON AVE., BRGY. MABOLO CEBU BUSINESS PARK, CEBU CITY ASPECT. AS-BUILT PLAN 24 61