9;22 Sep '22 Oct '22 Nov '22 Dec '22 Jan '23 Feb '23 Mar '23 Apr '23 May '23 Jun '23 Jul '23 Aug '23 Sep '23 Oct '23 Nov '23 Dec '23 Jan '24 Feb '24 Mar '24 Apr '24 May '24 Jun '24 Jul '24 Aug '24 Sep '24 Oct '24 Nov '24 Dec '24 Jan '25 Feb '25 Mar '25
Mode 19 26 0310172431071421280411 18 25 02 09 162330061320270411182501 08 15 22 29 0512192605121926020916 23 30 07 14 2128041118250209162330 06 13 20 27 031017240108152229051219 26 03 10 172431071421280411182503 10 17 24 31 0714212805121926020916 23 30 07 14 212804111825010815222906 13 20 27 031017240108152229051219 26 02 09 16 2302091623
1 1 Proyek
8 1.3.1.1 Pembesian Kepala Tukang Besi[5];Pekerja[46];Tukang Besi[46];Mandor[3];Besi D16[5.401,11];kawat beton[771,59];FC pondasi footplate 150x150 cm (fc' 30 mpa)[1]
9 1.3.1.2 Bekisting Balok kayu kelas II[1];Dolken kayu f (8–10) cm panjang 4 m[1];Kayu kelas III[3,68];Minyak bekisting[9,22];Paku 5 cm – 12 cm[27,67];Plywood tebal 9 mm[1];Mandor[2];Pekerja[24];Tukang Kayu[12];Kepala Tukang Kayu[2]
10 1.3.1.3 Pengecoran Air[8.578,5];Kerikil (Maks 30mm)[40.737,9];Pasir beton[27.171,9];Semen Portland[16.478,7];Pekerja[33];Tukang Batu[6];Kepala Tukang Batu;Mandor[2]
13 1.3.2.2 Bekisting Balok kayu kelas II[0,68];Dolken kayu f (8–10) cm panjang 4 m[91];Kayu kelas III[1,8];Paku 5 cm – 12 cm[18,02];Plywood tebal 9 mm[16];Pekerja[30];Tukang Kayu[15];Kepala Tukang Kayu[2];Mandor[2]
14 1.3.2.3 Pengecoran Air[10.416,75];Kerikil (Maks 30mm)[49.467,45];Pasir beton[32.994,45];Semen Portland[20.009,85];Pekerja[40];Tukang Batu[7];Kepala Tukang Batu;Mandor[3]
17 1.3.3.2 Bekisting Balok kayu kelas II[1];Dolken kayu f (8–10) cm panjang 4 m[1];Kayu kelas III[29,82];Paku 5 cm – 12 cm[223,65];Plywood tebal 9 mm[1];Minyak bekisting[74,55];Pekerja[39];Tukang Kayu[20];Kepala Tukang Kayu[2];Mandor[2]
18 1.3.3.3 Pengecoran Air[23.800,5];Kerikil (Maks 30mm)[113.024,7];Pasir beton[75.386,7];Semen Portland[45.719,1];Pekerja[37];Tukang Batu[7];Kepala Tukang Batu;Mandor[2]
20 1.5 Lantai 1
21 1.5.1 Lantai Kerja Air[1];Kerikil (Maks 30mm)[1];Pasir beton[1];Semen Portland[1];Pekerja[31];Tukang Batu;Kepala Tukang Batu[2];Mandor;FC lantai kerja[1]
24 1.5.2.2 Bekisting Balok kayu kelas II[5,72];Dolken kayu f (8–10) cm panjang 4 m[763,2];Kayu kelas III[11,45];Minyak bekisting[57,24];Paku 5 cm – 12 cm[152,64];Plywood tebal 9 mm[133,56];Pekerja[51];Tukang Kayu[26];Kepala Tukang Kayu[3];Mandor[3]
25 1.5.2.3 Pengecoran Air[9.229,95];Kerikil (Maks 30mm)[43.831,53];Pasir beton[29.235,33];Semen Portland[17.730,09];Pekerja[36];Tukang Batu[6];Kepala Tukang Batu;Mandor[2];FC Pekerjaan Kolom Utama (f'c 30 mPa)[1]
28 1.5.3.2 Bekisting Balok kayu kelas II[2,38];Kayu kelas III[4,75];Minyak bekisting[23,76];Paku 5 cm – 12 cm[63,36];Plywood tebal 9 mm[55,44];Dolken kayu f (8–10) cm panjang 4 m[316,8];Pekerja[35];Tukang Kayu[18];Kepala Tukang Kayu[2];Mandor[2]
29 1.5.3.3 Pengecoran Air[1.277,1];Kerikil (Maks 30mm)[6.064,74];Pasir beton[4.045,14];Semen Portland[2.453,22];Pekerja[10];Tukang Batu[2];Kepala Tukang Batu;Mandor;FC Pekerjaan Kolom Praktis (15 cm x 15 cm)[1]
32 1.5.4.2 Bekisting Balok kayu kelas II[5,44];Dolken kayu f (8–10) cm panjang 4 m[724,8];Kayu kelas III[4,83];Minyak bekisting[72,48];Paku 5 cm – 12 cm[144,96];Plywood tebal 9 mm[126,84];Pekerja[40];Tukang Kayu[20];Kepala Tukang Kayu[2];Mandor[2]
33 1.5.4.3 Pengecoran Air[2.597,2];Kerikil (Maks 30mm)[12.333,68];Pasir beton[8.226,48];Semen Portland[4.989,04];Pekerja[20];Tukang Batu[4];Kepala Tukang Batu;Mandor[2]
Task Summary Inactive Milestone Duration-only Start-only External Milestone Manual Progress
Project: MBW PERPUS OTW FIX
Split Project Summary Inactive Summary Manual Summary Rollup Finish-only Deadline
Date: Thu 23/06/22
Milestone Inactive Task Manual Task Manual Summary External Tasks Progress
Page 1
ID Task Task Name Jun '22 Jul '22 Aug '22 Sep '22 Oct '22 Nov '22 Dec '22 Jan '23 Feb '23 Mar '23 Apr '23 May '23 Jun '23 Jul '23 Aug '23 Sep '23 Oct '23 Nov '23 Dec '23 Jan '24 Feb '24 Mar '24 Apr '24 May '24 Jun '24 Jul '24 Aug '24 Sep '24 Oct '24 Nov '24 Dec '24 Jan '25 Feb '25 Mar '25
Mode 19 26 0310172431071421280411 18 25 02 09 162330061320270411182501 08 15 22 29 0512192605121926020916 23 30 07 14 2128041118250209162330 06 13 20 27 031017240108152229051219 26 03 10 172431071421280411182503 10 17 24 31 0714212805121926020916 23 30 07 14 212804111825010815222906 13 20 27 031017240108152229051219 26 02 09 16 2302091623
34 1.5.5 Pekerjaan Balok Utama
36 1.5.5.2 Bekisting Balok kayu kelas II[12,65];Dolken kayu f (8–10) cm panjang 4 m[1.406,2];Kayu kelas III[28,13];Minyak bekisting[140,64];Paku 5 cm – 12 cm[281,28];Plywood tebal 9 mm[246,12];Pekerja[47];Tukang Kayu[24];Kepala Tukang Kayu[3];Mandor[3]
37 1.5.5.3 Pengecoran Air[42.105,6];Kerikil (Maks 30mm)[199.952,64];Pasir beton[133.367,04];Semen Portland[80.881,92];Pekerja[47];Tukang Batu[8];Kepala Tukang Batu;Mandor[3];FC Pekerjaan Balok Utama[1]
40 1.5.6.2 Bekisting Balok kayu kelas II[1,89];Dolken kayu f (8–10) cm panjang 4 m[210,24];Kayu kelas III[4,2];Minyak bekisting[21,02];Paku 5 cm – 12 cm[42,04];Plywood tebal 9 mm[36,79];Pekerja[35];Tukang Kayu[18];Kepala Tukang Kayu[2];Mandor[2]
41 1.5.6.3 Pengecoran Air[3.250,8];Kerikil (Maks 30mm)[15.437,52];Pasir beton[10.296,72];Semen Portland[6.244,56];Pekerja[25];Tukang Batu[5];Kepala Tukang Batu;Mandor[2];FC Pekerjaan Balok Anak (20 cm x 30 cm)[1]
48 1.5.8.2 Bekisting Balok kayu kelas II[1];Dolken kayu f (8–10) cm panjang 4 m[1];Kayu kelas III[1];Minyak bekisting[1];Paku 5 cm – 12 cm[1];Plywood tebal 9 mm[1];Pekerja[13];Tukang Kayu[7];Kepala Tukang Kayu;Mandor
49 1.5.8.3 Pengecoran Air[1];Kerikil (Maks 30mm)[1];Pasir beton[1];Semen Portland[1];Pekerja[11];Tukang Batu[2];Kepala Tukang Batu;Mandor[2];FC Pekerjaan Tangga[1]
50 1.6 Lantai 2
51 1.6.1 Pekerjaan Bondex Beton mutu f’c = 26,4 mpa[355,2];Plat Bondex[133,58];Tulangan wire mesh ø6-15[9.636,58];Stutwerk untuk 1m³ beton[356];Pekerja[90];Tukang Batu[2];Tukang Besi[7];Tukang Kayu[78];Kepala Tukang Besi;Kepala Tukang Kayu[8];Mandor[5];FC Pekerjaan Bondex[1]
54 1.6.2.2 Bekisting Balok kayu kelas II[5,72];Dolken kayu f (8–10) cm panjang 4 m[763,2];Kayu kelas III[11,45];Minyak bekisting[57,24];Paku 5 cm – 12 cm[152,64];Plywood tebal 9 mm[133,56];Pekerja[51];Tukang Kayu[26];Kepala Tukang Kayu[3];Mandor[3]
55 1.6.2.3 Pengecoran Air[9.229,95];Kerikil (Maks 30mm)[43.831,53];Pasir beton[29.235,33];Semen Portland[17.730,09];Pekerja[36];Tukang Batu[6];Kepala Tukang Batu;Mandor[2]
58 1.6.3.2 Bekisting Balok kayu kelas II[1,4];Dolken kayu f (8–10) cm panjang 4 m[187,2];Kayu kelas III[2,81];Minyak bekisting[14,04];Paku 5 cm – 12 cm[37,44];Plywood tebal 9 mm[32,76];Pekerja[21];Tukang Kayu[11];Kepala Tukang Kayu[2];Mandor[2]
59 1.6.3.3 Pengecoran Air[754,65];Kerikil (Maks 30mm)[3.583,71];Pasir beton[2.390,31];Semen Portland[1.449,63];Pekerja[6];Tukang Batu;Kepala Tukang Batu;Mandor
62 1.6.4.2 Bekisting Balok kayu kelas II[5,43];Dolken kayu f (8–10) cm panjang 4 m[724,8];Kayu kelas III[4,83];Minyak bekisting[72,48];Paku 5 cm – 12 cm[144,96];Plywood tebal 9 mm[126,84];Pekerja[40];Tukang Kayu[40];Kepala Tukang Kayu[2];Mandor[2]
63 1.6.4.3 Pengecoran Air[2.597,2];Kerikil (Maks 30mm)[12.333,68];Pasir beton[8.226,48];Semen Portland[4.989,04];Pekerja[20];Tukang Batu[4];Kepala Tukang Batu;Mandor[2]
66 1.6.5.2 Bekisting Balok kayu kelas II[12,66];Dolken kayu f (8–10) cm panjang 4 m[1.406,4];Kayu kelas III[28,13];Minyak bekisting[140,64];Paku 5 - 10cm[281,28];Plywood tebal 9 mm[246,12];Pekerja[31];Tukang Kayu[16];Kepala Tukang Kayu[2];Mandor[2]
Task Summary Inactive Milestone Duration-only Start-only External Milestone Manual Progress
Project: MBW PERPUS OTW FIX
Split Project Summary Inactive Summary Manual Summary Rollup Finish-only Deadline
Date: Thu 23/06/22
Milestone Inactive Task Manual Task Manual Summary External Tasks Progress
Page 2
ID Task Task Name Jun '22 Jul '22 Aug '22 Sep '22 Oct '22 Nov '22 Dec '22 Jan '23 Feb '23 Mar '23 Apr '23 May '23 Jun '23 Jul '23 Aug '23 Sep '23 Oct '23 Nov '23 Dec '23 Jan '24 Feb '24 Mar '24 Apr '24 May '24 Jun '24 Jul '24 Aug '24 Sep '24 Oct '24 Nov '24 Dec '24 Jan '25 Feb '25 Mar '25
Mode 19 26 0310172431071421280411 18 25 02 09 162330061320270411182501 08 15 22 29 0512192605121926020916 23 30 07 14 2128041118250209162330 06 13 20 27 031017240108152229051219 26 03 10 172431071421280411182503 10 17 24 31 0714212805121926020916 23 30 07 14 212804111825010815222906 13 20 27 031017240108152229051219 26 02 09 16 2302091623
67 1.6.5.3 Pengecoran Air[42.105,6];Kerikil (Maks 30mm)[199.952,64];Pasir beton[133.367,04];Semen Portland[80.881,92];Pekerja[47];Tukang Batu[8];Kepala Tukang Batu;Mandor[3]
70 1.6.6.2 Bekisting Kayu kelas III[4,2];Balok kayu kelas II[1,89];Dolken kayu f (8–10) cm panjang 4 m[210,24];Minyak bekisting[21,02];Paku 5 cm – 12 cm[42,04];Plywood tebal 9 mm[36,79];Pekerja[13];Tukang Kayu[13];Kepala Tukang Kayu[2];Mandor
71 1.6.6.3 Pengecoran Air[3.250,8];Kerikil (Maks 30mm)[15.437,52];Pasir beton[10.296,72];Semen Portland[6.244,56];Pekerja[25];Tukang Batu[5];Kepala Tukang Batu;Mandor[2]
74 1.6.7.2 Bekisting Balok kayu kelas II[1];Dolken kayu f (8–10) cm panjang 4 m[1];Kayu kelas III[1];Minyak bekisting[1];Paku 5 cm – 12 cm[1];Plywood tebal 9 mm[1];Pekerja[13];Tukang Kayu[7];Kepala Tukang Kayu;Mandor
75 1.6.7.3 Pengecoran Air[1];Kerikil (Maks 30mm)[1];Pasir beton[1];Semen Portland[1];Pekerja[11];Tukang Batu[2];Kepala Tukang Batu;Mandor[2]
76 1.7 Lantai 3
77 1.7.1 Pekerjaan Bondex Beton mutu f’c = 26,4 mpa[496,35];Plat Bondex[4.394,87];Stutwerk untuk 1m³ beton[497];Tulangan wire mesh ø6-15[13.465,93];Pekerja[83];Tukang Kayu[72];Tukang Besi[2];Tukang Batu[6];Kepala Tukang Besi;Kepala Tukang Kayu[8];Mandor[5]
80 1.7.2.2 Bekisting Balok kayu kelas II[5,72];Dolken kayu f (8–10) cm panjang 4 m[763,2];Kayu kelas III[11,45];Minyak bekisting[57,24];Paku 5 cm – 12 cm[152,64];Plywood tebal 9 mm[133,56];Pekerja[51];Tukang Kayu[26];Kepala Tukang Kayu[3];Mandor[3]
81 1.7.2.3 Pengecoran Air[9.229,95];Kerikil (Maks 30mm)[43.831,53];Pasir beton[29.235,33];Semen Portland[17.730,09];Pekerja[36];Tukang Batu[6];Kepala Tukang Batu;Mandor[2]
84 1.7.3.2 Bekisting Balok kayu kelas II[0,68];Dolken kayu f (8–10) cm panjang 4 m[91,2];Kayu kelas III[1,37];Minyak bekisting[6,84];Paku 5 cm – 12 cm[18,24];Plywood tebal 9 mm[15,96];Pekerja[31];Tukang Kayu[16];Kepala Tukang Kayu[2];Mandor[2]
85 1.7.3.3 Pengecoran Air[367,65];Kerikil (Maks 30mm)[1.745,91];Pasir beton[1.164,51];Semen Portland[706,23];Pekerja[3];Tukang Batu;Kepala Tukang Batu;Mandor
88 1.7.4.2 Bekisting Balok kayu kelas II[5,43];Dolken kayu f (8–10) cm panjang 4 m[724,8];Kayu kelas III[4,83];Minyak bekisting[72,48];Paku 5 cm – 12 cm[144,96];Plywood tebal 9 mm[126,84];Pekerja[40];Tukang Kayu[20];Kepala Tukang Kayu[2];Mandor[2]
89 1.7.4.3 Pengecoran Air[2.597,2];Kerikil (Maks 30mm)[12.333,68];Pasir beton[8.226,48];Semen Portland[4.989,04];Pekerja[20];Tukang Batu[4];Kepala Tukang Batu;Mandor[2]
92 1.7.5.2 Bekisting Balok kayu kelas II[0,65];Dolken kayu f (8–10) cm panjang 4 m[71,68];Kayu kelas III[1,43];Minyak bekisting[7,17];Paku 5 cm – 12 cm[14,34];Plywood tebal 9 mm[12,54];Pekerja[12];Tukang Kayu[6];Kepala Tukang Kayu;Mandor
93 1.7.5.3 Pengecoran Air[2.064];Kerikil (Maks 30mm)[9.801,6];Pasir beton[6.537,6];Semen Portland[3.964,8];Pekerja[16];Tukang Batu[3];Kepala Tukang Batu;Mandor
96 1.7.6.2 Bekisting Balok kayu kelas II[1,89];Dolken kayu f (8–10) cm panjang 4 m[210,24];Kayu kelas III[4,2];Minyak bekisting[21,02];Paku 5 cm – 12 cm[42,05];Plywood tebal 9 mm[36,79];Pekerja[35];Tukang Kayu[18];Kepala Tukang Kayu[2];Mandor[2]
97 1.7.6.3 Pengecoran Air[3.250,8];Kerikil (Maks 30mm)[12.437,52];Pasir beton[10.296,72];Semen Portland[6.244,56];Pekerja[25];Tukang Batu[5];Kepala Tukang Batu;Mandor[2]
98 1.8 Pekerjaan Dag Beton Lantai Atap Beton mutu f’c = 26,4 mpa[81,66];Plat Bondex[723,05];Stutwerk untuk 1m³ beton[82];Tulangan wire mesh ø6-15[2.215,44];Pekerja[83];Tukang Batu[6];Tukang Besi[2];Tukang Kayu[72];Kepala Tukang Besi;Kepala Tukang Kayu[8];Mandor[5];FC Lantai Atap dan
Task Summary Inactive Milestone Duration-only Start-only External Milestone Manual Progress
Project: MBW PERPUS OTW FIX
Split Project Summary Inactive Summary Manual Summary Rollup Finish-only Deadline
Date: Thu 23/06/22
Milestone Inactive Task Manual Task Manual Summary External Tasks Progress
Page 3
ID Task Task Name Jun '22 Jul '22 Aug '22 Sep '22 Oct '22 Nov '22 Dec '22 Jan '23 Feb '23 Mar '23 Apr '23 May '23 Jun '23 Jul '23 Aug '23 Sep '23 Oct '23 Nov '23 Dec '23 Jan '24 Feb '24 Mar '24 Apr '24 May '24 Jun '24 Jul '24 Aug '24 Sep '24 Oct '24 Nov '24 Dec '24 Jan '25 Feb '25 Mar '25
Mode 19 26 0310172431071421280411 18 25 02 09 162330061320270411182501 08 15 22 29 0512192605121926020916 23 30 07 14 2128041118250209162330 06 13 20 27 031017240108152229051219 26 03 10 172431071421280411182503 10 17 24 31 0714212805121926020916 23 30 07 14 212804111825010815222906 13 20 27 031017240108152229051219 26 02 09 16 2302091623
99 1.9 Lantai Atap
100 1.9.1 Kuda kuda WF 300x150 mm Besi baja WF[4.051,68];Pekerja[43];Kepala Tukang Kayu[5];Tukang las konstruksi[43];Mandor[3]
101 1.9.2 Rangka Atap Kaso (5x7) cm[17,92];Reng (3x4) cm[72,96];Paku 5 - 10cm[320];Pekerja[26];Tukang las konstruksi[26];Kepala Tukang[3];Mandor[2]
102 1.9.3 Penutup Atap Metal Atap onduline classic[1.305,6];Paku/skrup atap anti karat[17.920];Pekerja[52];Tukang Kayu[26];Kepala Tukang Kayu[3];Mandor
104 1.10.1 Dinding Lantai 1 Bata merah[298.213];Pasir pasang[217,27];Semen Portland[47.288,02];Pekerja[52];Tukang Batu[18];Kepala Tukang Batu[2];Mandor[3];FC Pekerjaan Dinding[1]
105 1.10.2 Dinding Lantai 2 Bata merah[194.262];Pasir pasang[141,53];Semen Portland[30.804,28];Pekerja[42];Tukang Batu[12];Kepala Tukang Batu[2];Mandor[3]
106 1.10.3 Dinding Lantai 3 Bata merah[131.416];Pasir pasang[95,75];Semen Portland[20.838,8];Pekerja[38];Tukang Batu[13];Kepala Tukang Batu[2];Mandor[2]
108 1.11.1 Plester Lantai 1 PC[22.084,78];PP[110,76];Pekerja[52];Tukang Batu[26];Kepala Tukang Batu[2];Mandor[2];FC Pekerjaan Plester[1]
112 1.12.1 Acian Lantai 1 Semen Portland[13.845,59];Pekerja[43];Tukang Batu[22];Kepala Tukang Batu[3];Mandor[3];FC Pekerjaan Acian[1]
116 1.13.1 Lambersing Kayu Kruing (1,1 Kayu kruing balok (1,1 X 8 X 100 cm)[1,09];Paku triplek[0,84];Pekerja[30];Tukang Batu[30];Kepala Tukang Batu[3];Mandor[2];FC Pekerjaan Plafond[1]
X 8 X 100 cm)
117 1.13.2 Papan Kayu Rangka Hollow Kasa Gypsum[5,2];Rangka hollow 4x4 cm [469,2];Tepung Gypsum[46,9];Alkasit[0,3];Kawat penggantung[521,3];Paku skrup[15,6];Pekerja[17];Tukang Batu[26];Kepala Tukang Batu[3];Mandor
40 x 40 mm
118 1.13.3 Plafon Gypsum 9 mm rangka Alkasit[2,2];Kasa Gypsum[36,2];Kawat penggantung[3.619,3];Paku skrup[108,6];Rangka hollow 4x4 cm [3.257,3];Tepung Gypsum[325,7];Pekerja[54];Tukang Batu[83];Kepala Tukang Batu[9];Mandor[3]
hollow
119 1.13.4 Plafon Gantung (Suspended Alkasit[1];Kasa Gypsum[1];Kawat penggantung[1];Paku skrup[1];Rangka hollow 4x4 cm [1];Tepung Gypsum[1];Pekerja[4];Tukang Batu[6];Kepala Tukang Batu;Mandor
Ceiling)
121 1.14.1 Keramik 60 x 60 cm Merk Pasir pasang[198,53];Semen Portland[35.294,16];Semen Warna[7.147,07];Pekerja[62];Tukang Batu[31];Kepala Tukang Batu[4];Mandor[4];Keramik 60 x 60 cm Merk Platinum - Santiago Dark Grey[13.677];FC Pekerjaan Lantai[1
Platinum - Santiago Dark Grey
122 1.14.2 Keramik 20 x 20 cm Merk Asia Pasir pasang[11,57];Semen Portland[2.673,94];Semen Warna[128,55];Pekerja[62];Tukang Batu[31];Kepala Tukang Batu[4];Mandor[4];Keramik 20 x 20 cm Merk Asia Tile - Alpha Grey[270]
Tile - Alpha Grey
123 1.14.3 Tegel Kunci 20 x 20 cm (Orange - Pasir pasang[15,12];Semen Portland[3.495,23];Semen Warna[168,04];Pekerja[48];Tukang Batu[24];Kepala Tukang Batu[3];Mandor[3];Tegel Kunci 20 x 20 cm (Orange - Biru - Putih)[337]
Biru - Putih)
124 1.14.4 Lantai Vynil Kayu Laminasi 1,5 x Lem[70,63];Vynil[2.395,36];Pekerja[31];Tukang Batu[31];Kepala Tukang Batu[4];Mandor[2]
30 x 100 cm
125 1.14.5 Keramik 40 x 40 cm Merk Pasir pasang[13,68];Semen Portland[2.490,17];Semen Warna[492,56];Pekerja[43];Tukang Batu[22];Kepala Tukang Batu[3];Mandor[3];Keramik 40 x 40 cm Merk Platinum - Amazon Brown[332]
Platinum - Amazon Brown
126 1.14.6 Keramik 40 x 40 cm Merk Pasir pasang[27,51];Semen Portland[5.006,47];Semen Warna[990,29];Pekerja[43];Tukang Batu[22];Kepala Tukang Batu[3];Mandor[3];Keramik 40 x 40 cm Merk Platinum - Asturo Grey[666]
Platinum - Asturo Grey
Task Summary Inactive Milestone Duration-only Start-only External Milestone Manual Progress
Project: MBW PERPUS OTW FIX
Split Project Summary Inactive Summary Manual Summary Rollup Finish-only Deadline
Date: Thu 23/06/22
Milestone Inactive Task Manual Task Manual Summary External Tasks Progress
Page 4
ID Task Task Name Jun '22 Jul '22 Aug '22 Sep '22 Oct '22 Nov '22 Dec '22 Jan '23 Feb '23 Mar '23 Apr '23 May '23 Jun '23 Jul '23 Aug '23 Sep '23 Oct '23 Nov '23 Dec '23 Jan '24 Feb '24 Mar '24 Apr '24 May '24 Jun '24 Jul '24 Aug '24 Sep '24 Oct '24 Nov '24 Dec '24 Jan '25 Feb '25 Mar '25
Mode 19 26 0310172431071421280411 18 25 02 09 162330061320270411182501 08 15 22 29 0512192605121926020916 23 30 07 14 2128041118250209162330 06 13 20 27 031017240108152229051219 26 03 10 172431071421280411182503 10 17 24 31 0714212805121926020916 23 30 07 14 212804111825010815222906 13 20 27 031017240108152229051219 26 02 09 16 2302091623
127 1.15 Pekerjaan Plumbing Air Bersih
128 1.15.1 Pipa 1/2" Pipa PVC 1/2”[1];Pekerja[2];Tukang Batu[2];Kepala Tukang Batu;Mandor;FC Pekerjaan Plumbing Air Bersih[1]
129 1.15.2 Pipa 3/4" Pipa PVC 3/4”[1];Pekerja[7];Tukang Batu[12];Kepala Tukang Batu[2];Mandor
130 1.15.3 Pipa 1" Pipa PVC 1”[1];Pekerja[3];Tukang Batu[5];Kepala Tukang Batu;Mandor
131 1.15.4 Pipa 1 1/4" Pipa PVC 1 1/4"[1];Pekerja;Tukang Batu;Kepala Tukang Batu;Mandor
132 1.15.5 Pipa 1 1/2" Pipa PVC 1 1/2”[1];Pekerja[2];Tukang Batu[3];Kepala Tukang Batu;Mandor
133 1.15.6 Pipa 2" Pipa PVC 2”[1];Pekerja;Tukang Batu;Kepala Tukang Batu;Mandor
136 1.16.1 Pipa 1 1/4" Pipa PVC 1 1/4"[1];Pekerja[2];Tukang Batu;Kepala Tukang Batu;Mandor;FC Pekerjaan Plumbing Air Limbah[1]
137 1.16.2 Pipa 2" Pipa PVC 2”[1];Pekerja[7];Tukang Batu[11];Kepala Tukang Batu[2];Mandor
138 1.16.3 Pipa 3" Pipa PVC 3”[1];Pekerja[14];Tukang Batu[22];Kepala Tukang Batu[3];Mandor
139 1.16.4 Pipa 4" Pipa PVC 4”[1];Pekerja[2];Tukang Batu[3];Kepala Tukang Batu;Mandor
140 1.16.5 Pipa 5" Pipa PVC 5”[1];Pekerja[2];Tukang Batu[3];Kepala Tukang Batu;Mandor
142 1.16.7 Septic Tank diluar gedung Septic Tank luar gedung[1];Pekerja[2];Tukang Batu;Kepala Tukang Batu;Mandor
143 1.16.8 Septic Tank utama Septic Tank Utama[1];Pekerja[2];Tukang Batu;Kepala Tukang Batu;Mandor
144 1.16.9 Talang PVC 8" Talang PVC 8”[1];Pekerja[2];Tukang Batu;Kepala Tukang Batu;Mandor
146 1.17.1 Kloset Kepala Tukang Batu;Mandor[2];Pekerja[36];Tukang Batu[36];Closet duduk[1];FC Pekerjaan Sanitasi[1]
149 1.17.4 Sumur resapan U-Ditch Beton Precast U-DITCH, 60x70[1];Pekerja[32];Tukang Batu[16];Kepala Tukang Batu[2];Mandor
151 1.18.1 Lampu TL LED Warm White Kabel[1.200];Klem[1.200];L Bow[200];Lampu[50];Las Dop[150];T Dus[150];Pipa listrik 5/8”[150];Saklar[25];Pekerja[27];FC Pekerjaan Lampu[1]
153 1.18.3 Lampu Aksen Bambu Jenis 1 Kabel[1];Klem[1];L Bow[1];Lampu[1];Las Dop[1];Pipa listrik 5/8”[1];T Dus[1];Pekerja[8]
154 1.18.4 Lampu Aksen Bambu Jenis 2 Kabel[1];Klem[1];L Bow[1];Lampu[1];Las Dop[1];Pipa listrik 5/8”[1];T Dus[1];Pekerja
155 1.18.5 Lampu LED 10 watt Kabel[168];Klem[168];L Bow[28];Lampu[7];Las Dop[21];Pipa listrik 5/8”[21];T Dus[21];Pekerja
157 1.19.1 Paving Blok Paving block 8 cm berwarna[753];Pasir beton[38];Pekerja[38];Tukang Batu[38];Kepala Tukang Batu[4];Mandor;FC Pekerjaan Luar[1]
160 1.20.1 P1 Pekerja;Kepala Tukang Kayu;Mandor;Tukang Kayu;P1[2];FC Pekerjaan Pintu dan Jendela[1]
Task Summary Inactive Milestone Duration-only Start-only External Milestone Manual Progress
Project: MBW PERPUS OTW FIX
Split Project Summary Inactive Summary Manual Summary Rollup Finish-only Deadline
Date: Thu 23/06/22
Milestone Inactive Task Manual Task Manual Summary External Tasks Progress
Page 5
ID Task Task Name Jun '22 Jul '22 Aug '22 Sep '22 Oct '22 Nov '22 Dec '22 Jan '23 Feb '23 Mar '23 Apr '23 May '23 Jun '23 Jul '23 Aug '23 Sep '23 Oct '23 Nov '23 Dec '23 Jan '24 Feb '24 Mar '24 Apr '24 May '24 Jun '24 Jul '24 Aug '24 Sep '24 Oct '24 Nov '24 Dec '24 Jan '25 Feb '25 Mar '25
Mode 19 26 0310172431071421280411 18 25 02 09 162330061320270411182501 08 15 22 29 0512192605121926020916 23 30 07 14 2128041118250209162330 06 13 20 27 031017240108152229051219 26 03 10 172431071421280411182503 10 17 24 31 0714212805121926020916 23 30 07 14 212804111825010815222906 13 20 27 031017240108152229051219 26 02 09 16 2302091623
163 1.20.4 P5 Pekerja;Kepala Tukang Kayu;Mandor;Tukang Kayu;P5[9]
171 1.21.1 Cat Lantai 1 Cat dasar[1];Cat penutup 2 x (indoor)[1];Plamir tembok[1];Pekerja[29];Tukang Cat[90];Kepala Tukang Cat[9];Mandor[4];FC Pekerjaan Cat[1]
172 1.21.2 Cat Lantai 2 Cat dasar[1];Cat penutup 2 x (indoor)[1];Plamir tembok[1];Pekerja[28];Tukang Cat[88];Kepala Tukang Cat[9];Mandor[4]
173 1.21.3 Cat Lantai 3 Cat dasar[1];Cat penutup 2 x (indoor)[1];Plamir tembok[1];Pekerja[19];Tukang Cat[60];Kepala Tukang Cat[6];Mandor[3]
174 2 END
Task Summary Inactive Milestone Duration-only Start-only External Milestone Manual Progress
Project: MBW PERPUS OTW FIX
Split Project Summary Inactive Summary Manual Summary Rollup Finish-only Deadline
Date: Thu 23/06/22
Milestone Inactive Task Manual Task Manual Summary External Tasks Progress
Page 6