2 Sep '22 Oct '22 Nov '22 Dec '22 Jan '23 Feb '23 Mar '23 Apr '23 May '23 Jun '23 Jul '23 Aug '23 Sep '23 Oct '23 Nov '23 Dec '23 Jan '24 Feb '24 Mar '24 Apr '24 May '24 Jun '24 Jul '24 Aug '24 Sep '24 Oct '24 Nov '24 Dec '24 Jan '25
Mode 1926031017243107142128041118250209162330061320270411182501081522290512192605121926020916233007142128041118250209162330061320270310172401081522290512192603101724310714212804111825031017243107142128051219260209162330071421280411182501081522290613202703101724010815222905
1 1 Proyek
2 1.1 Pekerjaan Persiapan
3 1.1.1 Pembersihan Lahan Pekerja[60];direksi keet[1];pemasangan bowplank[1];FC pekerjaan persiapan[1]
8 1.3.1.1 Pembesian Kepala Tukang Besi[5];Pekerja[46];Tukang Besi[46];Mandor[3];Besi D16[5.401,11];kawat beton[771,59];FC pondasi footplate 150x150 cm (fc' 30 mpa)[1]
9 1.3.1.2 Bekisting Balok kayu kelas II[1];Dolken kayu f (8–10) cm panjang 4 m[1];Kayu kelas III[3,68];Minyak bekisting[9,22];Paku 5 cm – 12 cm[27,67];Plywood tebal 9 mm[1];Mandor[2];Pekerja[24];Tukang Kayu[12];Kepala Tukang Kayu[2]
10 1.3.1.3 Pengecoran Air[8.578,5];Kerikil (Maks 30mm)[40.737,9];Pasir beton[27.171,9];Semen Portland[16.478,7];Pekerja[33];Tukang Batu[6];Kepala Tukang Batu;Mandor[2]
13 1.3.2.2 Bekisting Balok kayu kelas II[0,68];Dolken kayu f (8–10) cm panjang 4 m[91];Kayu kelas III[1,8];Paku 5 cm – 12 cm[18,02];Plywood tebal 9 mm[16];Pekerja[30];Tukang Kayu[15];Kepala Tukang Kayu[2];Mandor[2]
14 1.3.2.3 Pengecoran Air[10.416,75];Kerikil (Maks 30mm)[49.467,45];Pasir beton[32.994,45];Semen Portland[20.009,85];Pekerja[40];Tukang Batu[7];Kepala Tukang Batu;Mandor[3]
17 1.3.3.2 Bekisting Balok kayu kelas II[1];Dolken kayu f (8–10) cm panjang 4 m[1];Kayu kelas III[29,82];Paku 5 cm – 12 cm[223,65];Plywood tebal 9 mm[1];Minyak bekisting[74,55];Pekerja[39];Tukang Kayu[20];Kepala Tukang Kayu[2];Mandor[2]
18 1.3.3.3 Pengecoran Air[23.800,5];Kerikil (Maks 30mm)[113.024,7];Pasir beton[75.386,7];Semen Portland[45.719,1];Pekerja[37];Tukang Batu[7];Kepala Tukang Batu;Mandor[2]
20 1.5 Lantai 1
21 1.5.1 Lantai Kerja Air[1];Kerikil (Maks 30mm)[1];Pasir beton[1];Semen Portland[1];Pekerja[31];Tukang Batu;Kepala Tukang Batu[2];Mandor;FC lantai kerja[1]
24 1.5.2.2 Bekisting Balok kayu kelas II[5,72];Dolken kayu f (8–10) cm panjang 4 m[763,2];Kayu kelas III[11,45];Minyak bekisting[57,24];Paku 5 cm – 12 cm[152,64];Plywood tebal 9 mm[133,56];Pekerja[51];Tukang Kayu[26];Kepala Tukang Kayu[3];Mandor[3]
25 1.5.2.3 Pengecoran Air[9.229,95];Kerikil (Maks 30mm)[43.831,53];Pasir beton[29.235,33];Semen Portland[17.730,09];Pekerja[36];Tukang Batu[6];Kepala Tukang Batu;Mandor[2];FC Pekerjaan Kolom Utama (f'c 30 mPa)[1]
28 1.5.3.2 Bekisting Balok kayu kelas II[2,38];Kayu kelas III[4,75];Minyak bekisting[23,76];Paku 5 cm – 12 cm[63,36];Plywood tebal 9 mm[55,44];Dolken kayu f (8–10) cm panjang 4 m[316,8];Pekerja[35];Tukang Kayu[18];Kepala Tukang Kayu[2];Mandor[2]
29 1.5.3.3 Pengecoran Air[1.277,1];Kerikil (Maks 30mm)[6.064,74];Pasir beton[4.045,14];Semen Portland[2.453,22];Pekerja[10];Tukang Batu[2];Kepala Tukang Batu;Mandor;FC Pekerjaan Kolom Praktis (15 cm x 15 cm)[1]
32 1.5.4.2 Bekisting Balok kayu kelas II[5,44];Dolken kayu f (8–10) cm panjang 4 m[724,8];Kayu kelas III[4,83];Minyak bekisting[72,48];Paku 5 cm – 12 cm[144,96];Plywood tebal 9 mm[126,84];Pekerja[40];Tukang Kayu[20];Kepala Tukang Kayu[2];Mandor[2]
33 1.5.4.3 Pengecoran Air[2.597,2];Kerikil (Maks 30mm)[12.333,68];Pasir beton[8.226,48];Semen Portland[4.989,04];Pekerja[20];Tukang Batu[4];Kepala Tukang Batu;Mandor[2]
36 1.5.5.2 Bekisting Balok kayu kelas II[12,65];Dolken kayu f (8–10) cm panjang 4 m[1.406,2];Kayu kelas III[28,13];Minyak bekisting[140,64];Paku 5 cm – 12 cm[281,28];Plywood tebal 9 mm[246,12];Pekerja[47];Tukang Kayu[24];Kepala Tukang Kayu[3];Mandor[3]
Task Summary Inactive Milestone Duration-only Start-only External Milestone Manual Progress
Project: MBW PERPUSTAKAAN
Split Project Summary Inactive Summary Manual Summary Rollup Finish-only Deadline
Date: Thu 23/06/22
Milestone Inactive Task Manual Task Manual Summary External Tasks Progress
Page 1
ID Task Task Name Jun '22 Jul '22 Aug '22 Sep '22 Oct '22 Nov '22 Dec '22 Jan '23 Feb '23 Mar '23 Apr '23 May '23 Jun '23 Jul '23 Aug '23 Sep '23 Oct '23 Nov '23 Dec '23 Jan '24 Feb '24 Mar '24 Apr '24 May '24 Jun '24 Jul '24 Aug '24 Sep '24 Oct '24 Nov '24 Dec '24 Jan '25
Mode 1926031017243107142128041118250209162330061320270411182501081522290512192605121926020916233007142128041118250209162330061320270310172401081522290512192603101724310714212804111825031017243107142128051219260209162330071421280411182501081522290613202703101724010815222905
37 1.5.5.3 Pengecoran Air[42.105,6];Kerikil (Maks 30mm)[199.952,64];Pasir beton[133.367,04];Semen Portland[80.881,92];Pekerja[47];Tukang Batu[8];Kepala Tukang Batu;Mandor[3];FC Pekerjaan Balok Utama[1]
40 1.5.6.2 Bekisting Balok kayu kelas II[1,89];Dolken kayu f (8–10) cm panjang 4 m[210,24];Kayu kelas III[4,2];Minyak bekisting[21,02];Paku 5 cm – 12 cm[42,04];Plywood tebal 9 mm[36,79];Pekerja[35];Tukang Kayu[18];Kepala Tukang Kayu[2];Mandor[2]
41 1.5.6.3 Pengecoran Air[3.250,8];Kerikil (Maks 30mm)[15.437,52];Pasir beton[10.296,72];Semen Portland[6.244,56];Pekerja[25];Tukang Batu[5];Kepala Tukang Batu;Mandor[2];FC Pekerjaan Balok Anak (20 cm x 30 cm)[1]
48 1.5.8.2 Bekisting Balok kayu kelas II[1];Dolken kayu f (8–10) cm panjang 4 m[1];Kayu kelas III[1];Minyak bekisting[1];Paku 5 cm – 12 cm[1];Plywood tebal 9 mm[1];Pekerja[13];Tukang Kayu[7];Kepala Tukang Kayu;Mandor
49 1.5.8.3 Pengecoran Air[1];Kerikil (Maks 30mm)[1];Pasir beton[1];Semen Portland[1];Pekerja[11];Tukang Batu[2];Kepala Tukang Batu;Mandor[2];FC Pekerjaan Tangga[1]
50 1.6 Lantai 2
51 1.6.1 Pekerjaan Bondex Beton mutu f’c = 26,4 mpa[355,2];Plat Bondex[133,58];Tulangan wire mesh ø6-15[9.636,58];Stutwerk untuk 1m³ beton[356];Pekerja[90];Tukang Batu[2];Tukang Besi[7];Tukang Kayu[78];Kepala Tukang Besi;Kepala Tukang Kayu[8];Mandor[5];FC Peke
54 1.6.2.2 Bekisting Balok kayu kelas II[5,72];Dolken kayu f (8–10) cm panjang 4 m[763,2];Kayu kelas III[11,45];Minyak bekisting[57,24];Paku 5 cm – 12 cm[152,64];Plywood tebal 9 mm[133,56];Pekerja[51];Tukang Kayu[26];Kepala Tukang Kayu[3];Mandor[3]
55 1.6.2.3 Pengecoran Air[9.229,95];Kerikil (Maks 30mm)[43.831,53];Pasir beton[29.235,33];Semen Portland[17.730,09];Pekerja[36];Tukang Batu[6];Kepala Tukang Batu;Mandor[2]
58 1.6.3.2 Bekisting Balok kayu kelas II[1,4];Dolken kayu f (8–10) cm panjang 4 m[187,2];Kayu kelas III[2,81];Minyak bekisting[14,04];Paku 5 cm – 12 cm[37,44];Plywood tebal 9 mm[32,76];Pekerja[21];Tukang Kayu[11];Kepala Tukang Kayu[2];Mandor[2]
59 1.6.3.3 Pengecoran Air[754,65];Kerikil (Maks 30mm)[3.583,71];Pasir beton[2.390,31];Semen Portland[1.449,63];Pekerja[6];Tukang Batu;Kepala Tukang Batu;Mandor
62 1.6.4.2 Bekisting Balok kayu kelas II[5,43];Dolken kayu f (8–10) cm panjang 4 m[724,8];Kayu kelas III[4,83];Minyak bekisting[72,48];Paku 5 cm – 12 cm[144,96];Plywood tebal 9 mm[126,84];Pekerja[40];Tukang Kayu[40];Kepala Tukang Kayu[2];Mandor[2]
63 1.6.4.3 Pengecoran Air[2.597,2];Kerikil (Maks 30mm)[12.333,68];Pasir beton[8.226,48];Semen Portland[4.989,04];Pekerja[20];Tukang Batu[4];Kepala Tukang Batu;Mandor[2]
66 1.6.5.2 Bekisting Balok kayu kelas II[12,66];Dolken kayu f (8–10) cm panjang 4 m[1.406,4];Kayu kelas III[28,13];Minyak bekisting[140,64];Paku 5 - 10cm[281,28];Plywood tebal 9 mm[246,12];Pekerja[31];Tukang Kayu[16];Kepala Tukang Kayu[2];Mandor[2]
67 1.6.5.3 Pengecoran Air[42.105,6];Kerikil (Maks 30mm)[199.952,64];Pasir beton[133.367,04];Semen Portland[80.881,92];Pekerja[47];Tukang Batu[8];Kepala Tukang Batu;Mandor[3]
70 1.6.6.2 Bekisting Kayu kelas III[4,2];Balok kayu kelas II[1,89];Dolken kayu f (8–10) cm panjang 4 m[210,24];Minyak bekisting[21,02];Paku 5 cm – 12 cm[42,04];Plywood tebal 9 mm[36,79];Pekerja[13];Tukang Kayu[13];Kepala Tukang Kayu[2];Mandor
71 1.6.6.3 Pengecoran Air[3.250,8];Kerikil (Maks 30mm)[15.437,52];Pasir beton[10.296,72];Semen Portland[6.244,56];Pekerja[25];Tukang Batu[5];Kepala Tukang Batu;Mandor[2]
Task Summary Inactive Milestone Duration-only Start-only External Milestone Manual Progress
Project: MBW PERPUSTAKAAN
Split Project Summary Inactive Summary Manual Summary Rollup Finish-only Deadline
Date: Thu 23/06/22
Milestone Inactive Task Manual Task Manual Summary External Tasks Progress
Page 2
ID Task Task Name Jun '22 Jul '22 Aug '22 Sep '22 Oct '22 Nov '22 Dec '22 Jan '23 Feb '23 Mar '23 Apr '23 May '23 Jun '23 Jul '23 Aug '23 Sep '23 Oct '23 Nov '23 Dec '23 Jan '24 Feb '24 Mar '24 Apr '24 May '24 Jun '24 Jul '24 Aug '24 Sep '24 Oct '24 Nov '24 Dec '24 Jan '25
Mode 1926031017243107142128041118250209162330061320270411182501081522290512192605121926020916233007142128041118250209162330061320270310172401081522290512192603101724310714212804111825031017243107142128051219260209162330071421280411182501081522290613202703101724010815222905
72 1.6.7 Pekerjaan Tangga
73 1.6.7.1 Pembesian Besi D16[1];Besi ø10[1];kawat beton[1];Pekerja[4];Tukang Besi[4];Kepala Tukang Besi;Mandor
74 1.6.7.2 Bekisting Balok kayu kelas II[1];Dolken kayu f (8–10) cm panjang 4 m[1];Kayu kelas III[1];Minyak bekisting[1];Paku 5 cm – 12 cm[1];Plywood tebal 9 mm[1];Pekerja[13];Tukang Kayu[7];Kepala Tukang Kayu;Mandor
75 1.6.7.3 Pengecoran Air[1];Kerikil (Maks 30mm)[1];Pasir beton[1];Semen Portland[1];Pekerja[11];Tukang Batu[2];Kepala Tukang Batu;Mandor[2]
76 1.7 Lantai 3
77 1.7.1 Pekerjaan Bondex Beton mutu f’c = 26,4 mpa[496,35];Plat Bondex[4.394,87];Stutwerk untuk 1m³ beton[497];Tulangan wire mesh ø6-15[13.465,93];Pekerja[83];Tukang Kayu[72];Tukang Besi[2];Tukang Batu[6];Kepala Tukang Besi;Kepala Tukang Kayu[8];M
80 1.7.2.2 Bekisting Balok kayu kelas II[5,72];Dolken kayu f (8–10) cm panjang 4 m[763,2];Kayu kelas III[11,45];Minyak bekisting[57,24];Paku 5 cm – 12 cm[152,64];Plywood tebal 9 mm[133,56];Pekerja[51];Tukang Kayu[26];Kepala Tukang Kayu[3];Mandor[
81 1.7.2.3 Pengecoran Air[9.229,95];Kerikil (Maks 30mm)[43.831,53];Pasir beton[29.235,33];Semen Portland[17.730,09];Pekerja[36];Tukang Batu[6];Kepala Tukang Batu;Mandor[2]
84 1.7.3.2 Bekisting Balok kayu kelas II[0,68];Dolken kayu f (8–10) cm panjang 4 m[91,2];Kayu kelas III[1,37];Minyak bekisting[6,84];Paku 5 cm – 12 cm[18,24];Plywood tebal 9 mm[15,96];Pekerja[31];Tukang Kayu[16];Kepala Tukang Kayu[2];Mandor[2]
85 1.7.3.3 Pengecoran Air[367,65];Kerikil (Maks 30mm)[1.745,91];Pasir beton[1.164,51];Semen Portland[706,23];Pekerja[3];Tukang Batu;Kepala Tukang Batu;Mandor
88 1.7.4.2 Bekisting Balok kayu kelas II[5,43];Dolken kayu f (8–10) cm panjang 4 m[724,8];Kayu kelas III[4,83];Minyak bekisting[72,48];Paku 5 cm – 12 cm[144,96];Plywood tebal 9 mm[126,84];Pekerja[40];Tukang Kayu[20];Kepala Tukang Kayu[2];Mandor[2
89 1.7.4.3 Pengecoran Air[2.597,2];Kerikil (Maks 30mm)[12.333,68];Pasir beton[8.226,48];Semen Portland[4.989,04];Pekerja[20];Tukang Batu[4];Kepala Tukang Batu;Mandor[2]
92 1.7.5.2 Bekisting Balok kayu kelas II[0,65];Dolken kayu f (8–10) cm panjang 4 m[71,68];Kayu kelas III[1,43];Minyak bekisting[7,17];Paku 5 cm – 12 cm[14,34];Plywood tebal 9 mm[12,54];Pekerja[12];Tukang Kayu[6];Kepala Tukang Kayu;Mandor
93 1.7.5.3 Pengecoran Air[2.064];Kerikil (Maks 30mm)[9.801,6];Pasir beton[6.537,6];Semen Portland[3.964,8];Pekerja[16];Tukang Batu[3];Kepala Tukang Batu;Mandor
96 1.7.6.2 Bekisting Balok kayu kelas II[1,89];Dolken kayu f (8–10) cm panjang 4 m[210,24];Kayu kelas III[4,2];Minyak bekisting[21,02];Paku 5 cm – 12 cm[42,05];Plywood tebal 9 mm[36,79];Pekerja[35];Tukang Kayu[18];Kepala Tukang Kayu[2];Mandor[2]
97 1.7.6.3 Pengecoran Air[3.250,8];Kerikil (Maks 30mm)[12.437,52];Pasir beton[10.296,72];Semen Portland[6.244,56];Pekerja[25];Tukang Batu[5];Kepala Tukang Batu;Mandor[2]
98 1.8 Pekerjaan Dag Beton Lantai Atap Beton mutu f’c = 26,4 mpa[81,66];Plat Bondex[723,05];Stutwerk untuk 1m³ beton[82];Tulangan wire mesh ø6-15[2.215,44];Pekerja[83];Tukang Batu[6];Tukang Besi[2];Tukang Kayu[72];Kepala Tukang Besi;Kepala Tukang Kayu[8];Man
101 1.9.2 Rangka Atap Kaso (5x7) cm[17,92];Reng (3x4) cm[72,96];Paku 5 - 10cm[320];Pekerja[26];Tukang las konstruksi[26];Kepala Tukang[3];Mandor[2]
102 1.9.3 Penutup Atap Metal Atap onduline classic[1.305,6];Paku/skrup atap anti karat[17.920];Pekerja[52];Tukang Kayu[26];Kepala Tukang Kayu[3];Mandor
105 1.10.2 Dinding Lantai 2 Bata merah[194.262];Pasir pasang[141,53];Semen Portland[30.804,28];Pekerja[42];Tukang Batu[12];Kepala Tukang Batu[2];Mandor[3]
106 1.10.3 Dinding Lantai 3 Bata merah[131.416];Pasir pasang[95,75];Semen Portland[20.838,8];Pekerja[38];Tukang Batu[13];Kepala Tukang Batu[2];Mandor[2]
Task Summary Inactive Milestone Duration-only Start-only External Milestone Manual Progress
Project: MBW PERPUSTAKAAN
Split Project Summary Inactive Summary Manual Summary Rollup Finish-only Deadline
Date: Thu 23/06/22
Milestone Inactive Task Manual Task Manual Summary External Tasks Progress
Page 3
ID Task Task Name Jun '22 Jul '22 Aug '22 Sep '22 Oct '22 Nov '22 Dec '22 Jan '23 Feb '23 Mar '23 Apr '23 May '23 Jun '23 Jul '23 Aug '23 Sep '23 Oct '23 Nov '23 Dec '23 Jan '24 Feb '24 Mar '24 Apr '24 May '24 Jun '24 Jul '24 Aug '24 Sep '24 Oct '24 Nov '24 Dec '24 Jan '25
Mode 1926031017243107142128041118250209162330061320270411182501081522290512192605121926020916233007142128041118250209162330061320270310172401081522290512192603101724310714212804111825031017243107142128051219260209162330071421280411182501081522290613202703101724010815222905
109 1.11.2 Plester Lantai 2 PC[14.386,43];PP[72,15];Pekerja[42];Tukang Batu[21];Kepala Tukang Batu[3];Mandor[3]
117 1.13.2 Papan Kayu Rangka Hollow Kasa Gypsum[5,2];Rangka hollow 4x4 cm [469,2];Tepung Gypsum[46,9];Alkasit[0,3];Kawat penggantung[521,3];Paku skrup[15,6];Pekerja[17];Tukang Batu[26];Kepala Tukang Batu[3];Mandor
40 x 40 mm
118 1.13.3 Plafon Gypsum 9 mm rangka Alkasit[2,2];Kasa Gypsum[36,2];Kawat penggantung[3.619,3];Paku skrup[108,6];Rangka hollow 4x4 cm [3.257,3];Tepung Gypsum[325,7];Pekerja[54];Tukang Batu[83];Kepala Tukang Batu[9];Mandor[3]
hollow
119 1.13.4 Plafon Gantung (Suspended Alkasit[1];Kasa Gypsum[1];Kawat penggantung[1];Paku skrup[1];Rangka hollow 4x4 cm [1];Tepung Gypsum[1];Pekerja[4];Tukang Batu[6];Kepala Tukang Batu;Mandor
Ceiling)
122 1.14.2 Keramik 20 x 20 cm Merk Asia Pasir pasang[11,57];Semen Portland[2.673,94];Semen Warna[128,55];Pekerja[62];Tukang Batu[31];Kepala Tukang Batu[4];Mandor[4];Keramik 20 x 20 cm Merk Asia Tile - Alpha Grey[270]
Tile - Alpha Grey
123 1.14.3 Tegel Kunci 20 x 20 cm (Orange - Pasir pasang[15,12];Semen Portland[3.495,23];Semen Warna[168,04];Pekerja[48];Tukang Batu[24];Kepala Tukang Batu[3];Mandor[3];Tegel Kunci 20 x 20 cm (Orange - Biru - Putih)[337]
Biru - Putih)
124 1.14.4 Lantai Vynil Kayu Laminasi 1,5 x Lem[70,63];Vynil[2.395,36];Pekerja[31];Tukang Batu[31];Kepala Tukang Batu[4];Mandor[2]
30 x 100 cm
125 1.14.5 Keramik 40 x 40 cm Merk Pasir pasang[13,68];Semen Portland[2.490,17];Semen Warna[492,56];Pekerja[43];Tukang Batu[22];Kepala Tukang Batu[3];Mandor[3];Keramik 40 x 40 cm Merk Platinum - Amazon Brown[332]
Platinum - Amazon Brown
126 1.14.6 Keramik 40 x 40 cm Merk Pasir pasang[27,51];Semen Portland[5.006,47];Semen Warna[990,29];Pekerja[43];Tukang Batu[22];Kepala Tukang Batu[3];Mandor[3];Keramik 40 x 40 cm Merk Platinum - Asturo Grey[666]
Platinum - Asturo Grey
129 1.15.2 Pipa 3/4" Pipa PVC 3/4”[1];Pekerja[7];Tukang Batu[12];Kepala Tukang Batu[2];Mandor
130 1.15.3 Pipa 1" Pipa PVC 1”[1];Pekerja[3];Tukang Batu[5];Kepala Tukang Batu;Mandor
131 1.15.4 Pipa 1 1/4" Pipa PVC 1 1/4"[1];Pekerja;Tukang Batu;Kepala Tukang Batu;Mandor
132 1.15.5 Pipa 1 1/2" Pipa PVC 1 1/2”[1];Pekerja[2];Tukang Batu[3];Kepala Tukang Batu;Mandor
133 1.15.6 Pipa 2" Pipa PVC 2”[1];Pekerja;Tukang Batu;Kepala Tukang Batu;Mandor
137 1.16.2 Pipa 2" Pipa PVC 2”[1];Pekerja[7];Tukang Batu[11];Kepala Tukang Batu[2];Mandor
138 1.16.3 Pipa 3" Pipa PVC 3”[1];Pekerja[14];Tukang Batu[22];Kepala Tukang Batu[3];Mandor
139 1.16.4 Pipa 4" Pipa PVC 4”[1];Pekerja[2];Tukang Batu[3];Kepala Tukang Batu;Mandor
Task Summary Inactive Milestone Duration-only Start-only External Milestone Manual Progress
Project: MBW PERPUSTAKAAN
Split Project Summary Inactive Summary Manual Summary Rollup Finish-only Deadline
Date: Thu 23/06/22
Milestone Inactive Task Manual Task Manual Summary External Tasks Progress
Page 4
ID Task Task Name Jun '22 Jul '22 Aug '22 Sep '22 Oct '22 Nov '22 Dec '22 Jan '23 Feb '23 Mar '23 Apr '23 May '23 Jun '23 Jul '23 Aug '23 Sep '23 Oct '23 Nov '23 Dec '23 Jan '24 Feb '24 Mar '24 Apr '24 May '24 Jun '24 Jul '24 Aug '24 Sep '24 Oct '24 Nov '24 Dec '24 Jan '25
Mode 1926031017243107142128041118250209162330061320270411182501081522290512192605121926020916233007142128041118250209162330061320270310172401081522290512192603101724310714212804111825031017243107142128051219260209162330071421280411182501081522290613202703101724010815222905
140 1.16.5 Pipa 5" Pipa PVC 5”[1];Pekerja[2];Tukang Batu[3];Kepala Tukang Batu;Mandor
142 1.16.7 Septic Tank diluar gedung Septic Tank luar gedung[1];Pekerja[2];Tukang Batu;Kepala Tukang Batu;Mandor
143 1.16.8 Septic Tank utama Septic Tank Utama[1];Pekerja[2];Tukang Batu;Kepala Tukang Batu;Mandor
144 1.16.9 Talang PVC 8" Talang PVC 8”[1];Pekerja[2];Tukang Batu;Kepala Tukang Batu;Mandor
149 1.17.4 Sumur resapan U-Ditch Beton Precast U-DITCH, 60x70[1];Pekerja[32];Tukang Batu[16];Kepala Tukang Batu[2];Mandor
153 1.18.3 Lampu Aksen Bambu Jenis 1 Kabel[1];Klem[1];L Bow[1];Lampu[1];Las Dop[1];Pipa listrik 5/8”[1];T Dus[1];Pekerja[8]
154 1.18.4 Lampu Aksen Bambu Jenis 2 Kabel[1];Klem[1];L Bow[1];Lampu[1];Las Dop[1];Pipa listrik 5/8”[1];T Dus[1];Pekerja
155 1.18.5 Lampu LED 10 watt Kabel[168];Klem[168];L Bow[28];Lampu[7];Las Dop[21];Pipa listrik 5/8”[21];T Dus[21];Pekerja
172 1.21.2 Cat Lantai 2 Cat dasar[1];Cat penutup 2 x (indoor)[1];Plamir tembok[1];Pekerja[28];Tukang Cat[88];Kepala Tukang Cat[9];Mandor[4]
173 1.21.3 Cat Lantai 3 Cat dasar[1];Cat penutup 2 x (indoor)[1];Plamir tembok[1];Pekerja[19];Tukang Cat[60];Kepala Tukang Cat[6];Mandor[3]
174 2 END
Task Summary Inactive Milestone Duration-only Start-only External Milestone Manual Progress
Project: MBW PERPUSTAKAAN
Split Project Summary Inactive Summary Manual Summary Rollup Finish-only Deadline
Date: Thu 23/06/22
Milestone Inactive Task Manual Task Manual Summary External Tasks Progress