You are on page 1of 6

AMA FARM

Sto. Domingo, Lupao, Nueva Ecija

ENGINEER’S REPORT
As of May 2021

CRIS Y. GUZON
Agricultural and Bio-Systems Engineer
1. Farm Site Development Plan and Google Map
11. Broiler House Front & Rear Area
III. Power Generator Set

Notes:
1.2 Units of 131Hp Diesel Stand –by Generator Set
2. 6 Hours total running time from January1- April 30, 2021
3. 60 liters of Diesel consumed from January1- April, 30, 2021
4. Both units are in good conditions and ready for operation.
IV. Water Treatment Lagoons
3 Units

Notes:
1.3 units of water treatment lagoons, aerobic process
2. Uniform dimension of 5 x 10 meters with 1.5 meters depth
3. The last and final lagoon is proposed to be a fishpond.
4. Currently, no waste water available since the operation just resumed this May, 2021. It was
subject for clearing and enhancement.
IV. Material Recovery Area

Notes:
1. Left front side of the area where the location of MRF.
2. Solid wastes where segregated into 3 parts. Biodegradable, Non-biodegradable and Hazardous
3. Non-bio waste located 200kg, Non-bio waste is 150kg and the Hazardous Waste is 10-15 kg.
4. The management is coordinating with the LGU for the proper disposal of the collected wastes.