A suggested template for the Site Checklist and the Method Statement are given below. A template
for the Inspection and Test plan can be found in Section 2.
Affairs : Department :
l
na
Consultant : io Project No. :
Completion & Stamped By Consultant then Reviewed & Approved By Project Manager (Mob: ---------)
rn
te
Satisfactory
Comments /
Item Description Submission
Yes No N/A Hold Points
In
1 MANAGEMENT
(CDD / Fire Safety Handbook / Building
Eg
l
na
Building Worksite Safety / 3 – Page 9 & 10).
x Ventilation
io
x Removal of fumes and dust
x Dust controls preventive measures
at
x Noise levels (instrument available?)
x Vibration
rn
x Lighting:
¾ General purpose for evening work
te
¾ Absence of glare
¾ Work area
is
¾ Corridors
¾ Exterior
Eg
l
Availability of stretcher / ambulance /
na
Standby Vehicle
x Clean room with potable water supply
io
x Doctor, Site Nurse & Site Clinic must be
approved from Supreme Council of Health
at
rn
– Page 16).
x Procedures
x
is
month
x Availability of Fire / Smoke / Gas detection
mobile devices
x Emergency contact telephone numbers /
Communications
x Breathing apparatus and / or respirators (if
applicable)
x Torches
x Loud Hailer
x Emergency lighting
x Adequate and safe Emergency Exit / Doors
are provided
x Escape routes, access ways to assembly
points, extinguishers, hydrants and other
firefighting equipment's and first aid kits kept
clear of obstruction at all times
l
areas?
na
io
10 SITE SECURITY & ACCESS Ref. to: (QCS: 1.10.9.2 + 11.1.1.12).
x Adequate transportation between working
at
site & accommodations
x Security check correctly performed
rn
l
Worksite Safety / 3 – Page 10).
x
x
Adequate guarding on machines
na
Inspected regularly with color code sticker &
io
maintenance records
x Grounding installed to equipment/machine
at
x Heating equipment
In
15 ELECTRICAL
(CDD / Fire Safety Handbook / Building
Worksite Safety / 3 – Page 10).
Eg
l
x Qualifications of operators available
x
na
Available Qatar license for drivers /
operators
io
x Banks man available
x Used as per its design (for intended
at
purpose)
x Vehicle and equipment condition
rn
l
22 SAFETY OF THE PUBLIC (For Road Works) na Ref. to: (QCS: 1.10.5.4 + 1.10.8 + 11.1.1.10).
io
x Approval from Traffic Dep. & Environmental
ministry
at
l
system
x
x na
Alarm and Emergency Evacuation system
Are Alarms audible in all areas
io
x Minimum quantities of flammable material
shall kept on site with full precautions
at
required
x Access for Fire Brigade cleared
rn
te
l
na
x
x
io
at
rn
te
In
is
Eg
QCS 2014 Section 11: Health and Safety Page 109
Part 2.4.01: Risk Assessment Guides and Method Statement
l
Monthly Accident Rate
na = (Clasue1+4+5+10) x 100,000
io
Caluse6 (No. of Manpower Average)
at
¾ Consultant Name:
Eg
¾ References:
QCS (Qatar Construction Specification – Latest Edition).
Labor Law No. 14 of the year 2004.
Qatar Traffic Law No. 19 of the Year 2007.
Environmental Protection Law No. 30 of the Year 2002.
CDD (Civil Defense Department) – Fire Safety Handbook.
Law No. 13 of 1997 - Civil Defense
Law No. 9 of the Year 2012 - Amending some provisions of Law No. 13 of 1997
Concerning the Civil Defense
Worker Rights Booklet 2009 (National Human Rights Committee).