Professional Documents
Culture Documents
1. Trench
The trench should be nanow, but not less than 40 cm
(16 inches) wide and should be checked for depth and slope'
2. Bedding
ln normal soil the bedding should be of sand or gravel and 15
r'
cm (6 inches) thick. Stones in the graUel:must not be bigger
than 20 mm. (415 inches). It is not necessary to compact the
bedding.
3. Bottom supporting
When pipe is laid clearances are allowed for sockets and
than one pipe is being iaid in the trench the initial backfill for
4-lnitial_ Bagkfill
and easy to handle and care should be taken that the machine
5, Prp.tecjive Fl|Jir.rg
flows into the trench during ihis operation increase the speed of
6. Final. Backfill