Temporary Site Facility

Wednesday, July 6, 2022 2:44 PM

1. 350mm height from the ground, coulomb to prepare proper, and acceptable step for the access
door. Concrete is preferable.

2. Below list the minimum requirement for Site Office Facility:

3. Coulomb to indicate power socket position inside the room, adequate lighting, and air condition,
etc. in the layout. Coulomb to use industrial type of power socket for indoor and outdoor, below
is the example.

SNAP Philippines Project Page 1


SNAP Philippines Project Page 2
4. Coulomb to ensure using ELCB (30mA) for the main CB for receiving power supply from SNAP for
safety. Coulomb also to indicate and install earthing rod for the temporary site facility.
5. Are Coulomb anticipate to use junction / distribution panel for receiving power from SNAP? If yes,
please to use industrial type and make sure locked and only accessible for authorized person.
Inside the panel also should covered by non-conductive materials to minimize any personnel
touching the live parts. (Example below)

6. In any case distribution board / panel required at Switchyard & BESS Location for work, Coulomb
to use the proper and outdoor type.
7. Installation of roof, as the total height is 4m from the ground, it will be consider as working at
high. Coulomb to submit work method statement, RA, JSA, separately prior executing the work.

SNAP Philippines Project Page 3


SNAP Philippines Project Page 4