Item No : 34 Hard rock (Blasting prohibited )
Length Breadth Height Quntity
S.No Description No's (m) (m) (m) (m3)
Br.No:296 (112/153.640)
1 Abutment-1 1 16.841 11.141 2.283 428.349
Br.No:312 (116/383.790)
1 Abutment-1 1 17.245 12.595 3.491 758.248
Br.No:314 (116.773.570)
1 Abutment-1 1 14.989 13.139 3.378 665.265
2 Pier-1 1 15.339 11.878 2.756 502.134
Br.No:327 (120/339.423)
1 Pier-2 1 15.014 16.014 4.028 968.469
Br.No:330 (122/550.300)
1 Abutment-1 1 17.179 12.529 2.958 636.667
Br.No:334 (124/030.380)
1 Abutment-1 1 16.359 10.659 1.319 229.995
2 Abutment-2 1 16.975 12.325 2.551 533.712
Br.No:346 (126/712.700)
1 Abutment-1 1 15.001 12.350 5.003 926.868
2 Pier-1 1 16.090 12.840 7.180 1483.356
3 Pier-2
4 Abutment-2
Br.No:362 (130/232.790)
1 Abutment-1
2 Pier-1
3 Pier-2
Total 7133.063
5940.000
1193.063
Remarks
Up To Date Qty.
Paid Upto 7th AC Bill
Payble Qty.
SCHEDULE - B6-
Bridges
Item No : 33 Hard rock (requiring blasting )
Length Breadth Height Quntity
S.No Description No's (m) (m) (m) (m3)
Br.No:330 (122/550.300)
1 Pier-1 1 15.294 18.294 2.188 612.177
Total 612.177
600.000
12.177
Remarks
Up To Date Qty.
Paid Upto 7th AC Bill
Payble Qty.
SCHEDULE - B6
Bridges
Item No : 31 Earth Work Excavation (All Kinds of Soils)
Length Breadth Height Quntity
S.No Description No's (m) (m) (m) (m3)
Br.No:296 (112/153.640)
1 Abutment-1 1 19.318 13.517 2.673 697.9775
2 Abutment-2 1 19.260 13.560 7.120 1859.4991
Br.No:303 (113/770.000)
1 Abutment-2 1 18.606 12.906 5.812 1395.6300
Br.No:312 (116/383.790) 0.0000
1 Abutment-1 1 20.295 15.645 2.611 829.0324
2 Abutment-2 1 18.265 13.615 5.531 1375.4379
Br.No:314 (116.773.570)
1 Abutment-1 1 19.413 17.563 5.470 1864.9993
2 Pier-1 1 17.983 14.483 2.455 639.3993
3 Pier-2 1 16.047 12.547 4.095 824.4943
4 Abutment-2 1 16.730 13.580 5.461 1240.7032
Br.No:327 (120/339.423)
1 Pier-1 1 15.486 16.486 4.972 1269.3625
2 Pier-2 1 17.876 18.876 1.697 572.6143
Br.No:330 (122/550.300)
1 Abutment-1 1 20.348 15.698 3.381 1079.9688
2 Pier-1 1 18.773 21.773 4.770 1949.7114
3 Abutment-2 1 17.431 12.781 3.463 771.5066
Br.No:334 (124/030.380)
1 Abutment-1 1 19.099 13.399 4.160 1064.5752
2 Abutment-2 1 18.738 14.088 0.976 257.6454
Br.No:346 (126/712.700)
1 Abutment-1 1 19.351 16.700 3.698 1195.0520
2 Pier-1 1 20.199 16.989 1.119 383.9969
3 Pier-2 - - - -
4 Abutment-2 - - - -
Br.No:360 (129/883.420)
1 Abutment-1 1 19.026 14.376 6.652 1819.4402
4 Abutment-2 1 18.377 13.790 5.481 1388.9886
Br.No:361 (129/973.010)
1 Abutment-1 1 17.327 14.627 9.255 2345.6060
4 Abutment-2 1 16.844 18.339 6.689 2066.2463
Br.No:362 (130/232.790)
1 Abutment-1
2 Pier-1
3 Pier-2
4 Pier-3 1 16.298 12.798 4.197 875.4178
5 Abutment-2 1 14.228 14.078 4.056 812.4240
Total 28579.729
23132.000
5447.729
)
Remarks
Up To Date Qty.
Paid Upto 7th AC Bill
Payble Qty.
SCHEDULE - B6
Bridges
Item No : 31 Earth Work Excavation (All Kinds of Soils)
Length Breadth Height Quntity
S.No Description No's (m) (m) (m) (m3)
Br.No:296 (112/153.640)
1 Abutment-1 1 19.318 13.517 2.673 697.9775
2 Abutment-2 1 19.260 13.560 7.120 1859.4991
Br.No:303 (113/770.000)
1 Abutment-2 1 18.606 12.906 5.812 1395.6300
Br.No:312 (116/383.790) 0.0000
1 Abutment-1 1 20.295 15.645 2.611 829.0324
2 Abutment-2 1 18.265 13.615 5.531 1375.4379
Br.No:314 (116.773.570)
1 Abutment-1 1 19.413 17.563 5.470 1864.9993
2 Pier-1 1 17.983 14.483 2.455 639.3993
3 Pier-2 1 16.047 12.547 4.095 824.4943
4 Abutment-2 1 16.730 13.580 5.461 1240.7032
Br.No:327 (120/339.423)
1 Pier-1 1 15.486 16.486 4.972 1269.3625
2 Pier-2 1 17.876 18.876 1.697 572.6143
Br.No:330 (122/550.300)
1 Abutment-1 1 20.348 15.698 3.381 1079.9688
2 Pier-1 1 18.773 21.773 4.770 1949.7114
3 Abutment-2 1 17.431 12.781 3.463 771.5066
Br.No:334 (124/030.380)
1 Abutment-1 1 19.099 13.399 4.160 1064.5752
2 Abutment-2 1 18.738 14.088 0.976 257.6454
Br.No:346 (126/712.700)
1 Abutment-1 1 19.351 16.700 3.698 1195.0520
2 Pier-1 1 20.199 16.989 1.119 383.9969
3 Pier-2 - - - -
4 Abutment-2 - - - -
Br.No:360 (129/883.420)
1 Abutment-1 1 19.026 14.376 6.652 1819.4402
4 Abutment-2 1 18.377 13.790 5.481 1388.9886
Br.No:361 (129/973.010)
1 Abutment-1 1 17.327 14.627 9.255 2345.6060
4 Abutment-2 1 16.844 18.339 6.689 2066.2463
Br.No:362 (130/232.790)
1 Abutment-1
2 Pier-1
3 Pier-2
4 Pier-3 1 16.298 12.798 4.197 875.4178
5 Abutment-2 1 14.228 14.078 4.056 812.4240
Total 28579.729
23132.000
5447.729
)
Remarks
Up To Date Qty.
Paid Upto 7th AC Bill
Payble Qty.
RAMNA-SINGRAULI DOUBLING WORK PROJECT UNDER DHANABAD DIVISION AT EAST CENTRAL RAILWAY
SCH-C1(1) CEMENT
SL ITEM LENGTH WIDTH HEIGHT QUANTITY
NO DESCRIPTION NO (M) (M) (M) (M3) GRADE REMARKS
SCH-C1(1)
BRG-362 -P3 PIER PCC 1 12.804 320 1000 4.097 C1-1
BRG-360 -A1 ABUTEMENT PCC 1 14.774 320 1000 4.728 C1-1
BRG-362 -P3 PIER RAFT 1 212.875 440 1000 93.665 C1-1
BRG-360 -A1 ABUTEMENT RAFT 1 314.215 440 1000 138.255 C1-1
BRG-361 -A2 ABUTEMENT PCC 1 13.313 320 1000 4.260 C1-1
362-A2 PCC 1 12.376 320 1000 3.960 C1-1
361-A2 ABUTMENT RAFT 1 269.924 440 1000 118.767 C1-1
BRIDGE-362
P1&P2 2 2 3.700 13.650 202.020
BRIDGE-351 0.000
BRIDGE-346 0.000
BRIDGE-330 0.000
BRIDGE-327 0.000
BRIDGE-314 0.000
BRIDGE-312 0.000
BRIDGE-309 0.000
BRIDGE-303 0.000
BRIDGE-296 0.000
Total 129032.256
Chainage Area M.Area Dist Qty Remarks
112.170 159.250 - -
River Face
112.180 498.450 328.850 10.000 3288.500
112.200 672.715 585.583 20.000 11711.650
112.220 692.476 682.596 20.000 13651.910 BRG NO 296 A-2
112.240 398.015 545.246 20.000 10904.910 SIDE
Soil
S.no Chainage Area M.Area Dist Qty Remarks
113.710 106.889 - - - BRG NO 303 A-1
113.730 171.875 139.382 20.000 2787.640 SIDE
Soil
S.no Chainage Area M.Area Dist Qty Remarks
115.450 5.225 - - -
115.460 59.811 32.518 10.000 325.180
BRG NO 309 A-1
115.480 122.500 91.156 20.000 1823.110
SIDE
BRG NO 309 A-1
SIDE
115.500 305.142 213.821 20.000 4276.420
115.510 305.421 305.282 10.000 3052.815
115.520 245.960 275.691 10.000 2756.905
River Face
115.530 146.145 196.053 10.000 1960.525
3 Total 14194.955
Chainage Area M.Area Dist Qty Remarks
115.550 0.000 0.000
River Face
115.560 246.000 123.000 10.000 1230.000
115.580 321.250 283.625 20.000 5672.500
BRG NO 309 A-2
115.600 205.415 263.333 20.000 5266.650
SIDE
115.610 168.450 186.933 10.000 1869.325
Total 14038.475
Soil
S.no Chainage Area M.Area Dist Qty Remarks
116.320 0.000 - - -
116.330 101.284 50.642 10.000 506.420
BRG NO 312 A-1
116.340 187.381 144.333 10.000 1443.325
SIDE
116.350 261.781 224.581 10.000 2245.810
116.360 100.950 181.366 10.000 1813.655
116.380 92.450 96.700 20.000 1934.000 River Face
Total 7943.210 Cum
Chainage Area M.Area Dist Qty Remarks
116.382 0.000
4 116.390 120.354 60.177 8.000 481.416
River Face
Soil
S.no Chainage Area M.Area Dist Qty Remarks
BRG NO 314 A-1
116.750 97.176 - - -
SIDE
116.760 128.563 112.870 10.000 1128.695
River Face
116.767 0.000 64.282 7.000 449.970
Total 1578.665
Chainage Area M.Area Dist Qty Remarks
116.780 44.410 - - -
5 116.790 220.480 132.445 10.000 1324.450
River Face
Soil
S.no Chainage Area M.Area Dist Qty Remarks
115.450 45.256 - - -
115.470 59.811 52.534 20.000 1050.670 BRG NO 327 A-1
115.490 121.988 90.900 20.000 1817.990 SIDE
Soil
S.no Chainage Area M.Area Dist Qty Remarks
122.450 0.000 - - -
122.460 27.048 13.524 10.000 135.240
122.470 72.544 49.796 10.000 497.960
BRG NO 330 A-1
122.480 105.731 89.138 10.000 891.375
SIDE
122.490 158.049 131.890 10.000 1318.900
122.500 143.949 150.999 10.000 1509.990
122.514 143.949 143.949 14.000 2015.286
122.520 116.469 130.209 6.000 781.254
RIVER FACE
122.530 27.932 72.201 10.000 722.005
Total 7872.010 Cum
7 Chainage Area M.Area Dist Qty Remarks
122.570 24.215 -
RIVER FACE
122.580 180.806 102.511 10.000 1025.105
122.590 361.107 270.957 10.000 2709.565
122.600 312.965 337.036 10.000 3370.360
122.610 371.165 342.065 10.000 3420.650 BRG NO 330 A2
122.620 330.139 350.652 10.000 3506.520 SIDE
Soil
S.no Chainage Area M.Area Dist Qty Remarks
123.920 0.000 - - -
Soil
S.no Chainage Area M.Area Dist Qty Remarks
126.640 54.250 - - -
BRG NO 346 A-1
126.660 195.240 124.745 20.000 2494.900
SIDE
126.680 220.000 207.620 20.000 4152.400
126.695 172.580 196.290 15.000 2944.350 River Face
Total 9591.650 Cum
9 Chainage Area M.Area Dist Qty Remarks
126.710 145.245 - River Face
126.720 287.943 216.594 10.000 2165.940
BRG NO 346 A2
126.740 145.250 216.597 20.000 4331.930
SIDE
126.760 34.250 89.750 20.000 1795.000
Total 8292.870 Cum
Soil
S.no Chainage Area M.Area Dist Qty Remarks
127.280 20.120 - - -
127.300 35.065 27.593 20.000 551.850 BRG NO 351 A-1
127.320 249.729 142.397 20.000 2847.940 SIDE
S.no
S.no Chainage Area M.Area Dist Qty Remarks
129.760 104.358 - - -
129.780 165.091 134.724 20.000 2694.489
129.800 225.078 195.084 20.000 3901.689 BRG NO 360 A-1
129.820 251.482 238.280 20.000 4765.600 SIDE
Up To Date Qty.
SCHEDULE - B6-
Item No : 33 Hard rock (requiring blasting )
Length Breadth Height Quntity
S.No Description No's (m) (m) (m) (m3)
Br.No:330 (122/550.300)
1 Pier-1 1 15.294 18.294 2.188 612.177
Total 612.177
600.000
12.177
Remarks
Up To Date Qty.
Paid Upto 7th AC Bill
Payble Qty.
SCHEDULE - B6-1
Item No : 34 Hard rock (Blasting prohibited )
Length Breadth Height Quntity
S.No Description No's (m) (m) (m) (m3)
Br.No:296 (112/153.640)
1 Abutment-1 1 16.841 11.141 2.283 428.349
Br.No:312 (116/383.790)
1 Abutment-1 1 17.245 12.595 3.491 758.248
Br.No:314 (116.773.570)
1 Abutment-1 1 14.989 13.139 3.378 665.265
2 Pier-1 1 15.339 11.878 2.756 502.134
Br.No:327 (120/339.423)
1 Pier-2 1 15.014 16.014 4.028 968.469
Br.No:330 (122/550.300)
1 Abutment-1 1 17.179 12.529 2.958 636.667
Br.No:334 (124/030.380)
1 Abutment-1 1 16.359 10.659 1.319 229.995
2 Abutment-2 1 16.975 12.325 2.551 533.712
Br.No:346 (126/712.700)
1 Abutment-1 1 15.001 12.350 5.003 926.868
2 Pier-1 1 16.090 12.840 7.180 1483.356
3 Pier-2
4 Abutment-2
Br.No:362 (130/232.790)
1 Abutment-1
2 Pier-1
3 Pier-2
Total 7133.063
5940.000
1193.063
Remarks
Up To Date Qty.
Paid Upto 7th AC Bill
Payble Qty.
SCHEDULE - B6
Item No : 35 Providing and laying in postion machine mixed,machine vibrated and machine
batched Design Mix cement concrete M-30/35/40 etc, in RCC raft foundation & pile cap etc,
SL ITEM LENGTH WIDTH HEIGHT QUANTITY
DESCRIPTION GRADE REMARKS
NO NO (M) (M) (M) (M3)
362-RAFT
A1 1 8.700 8.700 1.800 136.242
A2 1 11.00 10.85 1.50 179.025
P1 1 18.00 11.50 2.25 465.750
P2 1 18.00 11.50 2.25 465.750
P3 1 13.000 9.500 1.800 222.300 B6-35
P3 -1 13.000 1.450 0.500 -9.425 B6-35
A2 RWALL 1 60.000 4.400 0.600 158.400
A2 RWALL 1 60.000 0.500 0.600 18.000 1636.042
361-RAFTS
A1 1 12.200 9.000 2.000 219.600
A2 1 12.300 10.450 2.100 269.924 489.524
360-RAFTS
A1 1 14.500 9.850 2.200 314.215
A2 1 14.500 9.850 2.200 314.215 628.430
346-RAFTS 0.000
A1 1 11.500 8.850 2.000 203.550
A2 1 11.500 8.850 2.000 203.550
P1 1 11.500 8.750 1.800 181.125
P2 1 11.500 8.750 1.800 181.125 769.350
334-RAFTS
A1 1 14.700 9.000 2.200 291.060
A2 1 14.500 9.850 2.200 314.215 605.275
330-RAFTS
A1 1 14.500 9.850 2.200 314.215
A2 1 14.500 9.850 2.200 314.215
P1 1 16.000 13.000 2.000 416.000
P1 -1 16.000 2.750 0.750 -33.000
A2 RWALL 1 76.000 3.200 0.500 121.600
A2 RWALL 1 76.000 0.500 0.500 19.000 1152.030
327-RAFTS
A1 1 8.700 12.300 1.800 192.618
A2 1 8.700 12.300 1.800 192.618
P1 1 12.000 13.000 1.800 280.800
P1 -1 13.000 2.450 0.600 -19.110
P2 1 12.000 13.000 1.800 280.800
P2 -1 13.000 2.450 0.600 -19.110 908.616
314-RAFTS
A1 1 12.300 10.450 2.100 269.924
A2 1 13.000 9.850 2.000 256.100
P1 1 13.000 9.500 1.800 222.300
P1 -1 13.000 1.450 0.500 -9.425
P2 1 13.000 9.500 1.800 222.300
P2 -1 13.000 1.450 0.500 -9.425 951.774
312-RAFTS 0.000
A1 1 14.500 9.850 2.200 314.215
A2 1 14.500 9.850 2.200 314.215 628.430
303-RAFTS
A1 1 14.500 9.850 2.200 314.215
A2 1 14.700 9.000 2.200 291.060
P2 1 19.500 17.000 1.500 497.250
P2 0.2667 331.500 112.500 193.116 169.898 1272.423
296-RAFTS
A1 1 14.700 9.000 2.200 291.060
A2 1 14.700 9.000 2.200 291.060 582.120
296-RAFTS
P1GAD 1 17.000 18.000 2.000 612.000
P1GAD 0.333 306 60.9 136.512 167.804
P2 GAD 1 17.000 18.000 2.000 612.000
P2 GAD 0.333 306 60.9 136.512 167.804 1559.608
309-RAFTS
A1 1 8.250 15.350 1.500 189.956
A2 1 11.000 15.350 1.500 253.275
P1GAD 1 15.000 17.250 2.200 569.250
P2GAD 1 15.000 17.250 2.200 569.250 1581.731
351-RAFTS 0.000
A1 1 12.400 8.800 1.800 196.416 1178.496
A2 1 12.400 8.800 1.800 196.416
P1 1 12.400 8.800 1.800 196.416
P2 1 12.400 8.800 1.800 196.416
P3 1 12.400 8.800 1.800 196.416
P4 1 12.400 8.800 1.800 196.416
TOTAL QTY 13943.848 13943.848
B6-36
SCH-B6(37)
Item No : 37 ABUTMENT & PIER
SL LENGTH WIDTH HEIGHT QUANTITY
NO DESCRIPTION NOS NOS (M) (M) (M) (M3) GRADE REMARKS
BRIDGE-362
A1 1 1 7.850 1.400 4.563 50.147
BRIDGE-330 0.000
BRIDGE-314 0.000
BRIDGE-303
P2/BOULDER RWALL 1 2 19.500 0.300 2.800 32.760
BRIDGE-362
A1 CAP 1 1 7.850 1.300 1.000 10.2050
A1 INSPECTION PLATFORM 1 1 7.850 1.200 0.200 1.8840
A1 PEDESTALS 1 2 1.130 0.465 0.300 0.3153
OHE MAST 2 1 0.900 0.900 2.058 3.3340
OHE MAST -2 1 3.141 0.0625 1.400 -0.5497
A2 CAP 1 1 8.100 1.300 1.000 10.5300
A2 INSPECTION PLATFORM 1 1 8.100 1.200 0.200 1.9440
A2 PEDESTALS 1 2 1.130 0.465 0.300 0.3153
A2 FLYWING WALL 2 1 3.000 0.350 1.000 2.1000
A2 FLYWING WALL 2 0.5 3.000 0.350 1.818 1.9089
HANUCH 2 0.5 0.300 0.300 2.818 0.2536
OHE MAST 2 1 0.900 0.900 2.058 3.3340
OHE MAST -2 1 3.141 0.0625 1.400 -0.5497
P1 CAP & P2 CAP 2 1 8.100 2.9000 0.900 42.2820
P1 CAP & P2 CAP 2 1 7.350 2.9000 0.300 12.7890
P1 CAP & P2 CAP 2 1 8.100 1.4500 0.464 10.8994
P1 IP & P2 IP 2 2 10.500 1.2000 0.200 10.0800
P1 IP & P2 IP 2 2 2.900 1.2000 0.200 2.7840
P1 PEDESTALS & P2 PEDESTALS 2 2 1.255 0.5400 0.300 0.8132
P1 PEDESTALS & P2 PEDESTALS 2 2 1.130 0.4500 0.300 0.6102
OHE MAST 2 2 0.900 0.900 2.058 6.6679
OHE MAST -2 2 3.141 0.0625 1.400 -1.0994
P3 CAP 1 1 8.100 2.400 1.000 19.4400
P3 CAP 1 1 6.750 2.400 0.200 3.2400
P3 IP 1 2 10.500 1.200 0.200 5.0400
P3 IP 1 2 2.400 1.200 0.200 1.1520
P3 PEDESTALS 1 2 1.130 0.900 0.300 0.6102
P3 OHE MAST 1 2 0.900 0.900 2.058 3.3340
P3 OHE MAST -1 2 0.500 0.500 1.400 -0.7000
BRIDGE-361
A1 CAP 1 1 8.100 1.300 1.500 15.7950
A1 INSPECTION PLATFORM 1 1 8.100 1.200 0.200 1.9440
A1 PEDESTALS 1 2 1.130 0.465 0.300 0.3153
A1 FLYWING WALL 2 1 3.000 0.350 1.000 2.1000
A1 FLYWING WALL 2 0.5 3.000 0.350 1.818 1.9089
HANUCH 2 0.5 0.300 0.3000 3.318 0.2986
OHE MAST 2 1 0.900 0.900 2.058 3.3340
OHE MAST -2 1 3.141 0.0625 1.400 -0.5497
A2 CAP 1 1 8.100 1.300 1.000 10.5300
A2 INSPECTION PLATFORM 1 1 8.100 1.200 0.200 1.9440
A2 PEDESTALS 1 2 1.130 0.465 0.300 0.3153
A2 FLYWING WALL 2 1 3.000 0.350 1.000 2.1000
A2 FLYWING WALL 2 0.5 3.000 0.350 1.818 1.9089
HANUCH 2 0.5 0.300 0.3000 2.818 0.2536
OHE MAST 2 1 0.900 0.900 2.058 3.3340
OHE MAST -2 1 3.141 0.0625 1.400 -0.5497
BRIDGE-360
A1 CAP 1 1 8.100 1.300 1.000 10.5300
A1 INSPECTION PLATFORM 1 1 8.100 1.200 0.200 1.9440
A1 PEDESTALS 1 2 1.255 0.560 0.300 0.4217
A1 FLYWING WALL 2 1 3.000 0.400 1.000 2.4000
A1 FLYWING WALL 2 0.5 3.000 0.400 2.282 2.7384
HANUCH 2 0.5 0.300 0.3000 3.282 0.2954
OHE MAST 2 1 0.900 0.900 2.522 4.0856
OHE MAST -2 1 3.141 0.0625 1.400 -0.5497
A2 CAP 1 1 8.100 1.300 1.000 10.5300
A2 INSPECTION PLATFORM 1 1 8.100 1.200 0.200 1.9440
A2 PEDESTALS 1 2 1.255 0.560 0.300 0.4217
A2 FLYWING WALL 2 1 3.000 0.400 1.000 2.4000
A2 FLYWING WALL 2 0.5 3.000 0.400 2.282 2.7384
HANUCH 2 0.5 0.300 0.3000 3.282 0.2954
OHE MAST 2 1 0.900 0.900 2.522 4.0856
OHE MAST -2 1 3.141 0.0625 1.400 -0.5497
P1 CAP 1 1 8.100 2.9000 1.200 28.1880
P1IP 1 2 10.500 1.2000 0.200 5.0400
P1 IP 1 2 2.900 1.2000 0.200 1.3920
P1 PEDESTALS 1 2 1.255 1.090 0.300 0.8208
OHE MAST 1 2 0.900 0.9000 2.522 4.0856
OHE MAST -1 2 3.141 0.0625 1.400 -0.5497
P2 CAP 1 1 8.100 2.9000 1.200 28.1880
P2IP 1 2 10.500 1.2000 0.200 5.0400
P2 IP 1 2 2.900 1.2000 0.200 1.3920
P2 PEDESTALS 1 2 1.255 1.0900 0.300 0.8208
OHE MAST 1 2 0.900 0.9000 2.522 4.0856
OHE MAST -1 2 3.141 0.0625 1.400 -0.5497
BRIDGE-346
A1 CAP 1 1 8.100 1.300 1.000 10.5300
A1 INSPECTION PLATFORM 1 1 8.100 1.200 0.200 1.9440
A1 PEDESTALS 1 2 1.130 0.465 0.300 0.3153
A1 FLYWING WALL 2 1 3.000 0.350 1.000 2.1000
A1 FLYWING WALL 2 0.5 3.000 0.350 1.818 1.9089
HANUCH 2 0.5 0.300 0.3000 2.818 0.2536
OHE MAST 2 1 0.900 0.900 2.058 3.3340
OHE MAST -2 1 3.141 0.0625 1.400 -0.5497
A2 CAP 1 1 8.100 1.300 1.000 10.5300
A2 INSPECTION PLATFORM 1 1 8.100 1.200 0.200 1.9440
A2PEDESTALS 1 2 1.130 0.465 0.300 0.3153
A2 FLYWING WALL 2 1 3.000 0.350 1.000 2.1000
A2FLYWING WALL 2 0.5 3.000 0.350 1.818 1.9089
HANUCH 2 0.5 0.300 0.3000 2.818 0.2536
OHE MAST 2 1 0.900 0.900 2.058 3.3340
OHE MAST -2 1 3.141 0.0625 1.400 -0.5497
P1 CAP 1 1 8.100 2.900 1.200 28.1880
P1IP 1 2 10.500 1.200 0.200 5.0400
P1 IP 1 2 2.900 1.200 0.200 1.3920
P1 PEDESTALS 1 2 1.130 0.900 0.300 0.6102
OHE MAST 1 2 0.900 0.900 2.058 3.3340
OHE MAST -1 2 3.141 0.063 1.400 -0.5497
P2 CAP 1 1 8.100 2.900 1.200 28.1880
P2IP 1 2 10.500 1.200 0.200 5.0400
P2 IP 1 2 2.900 1.200 0.200 1.3920
P2 PEDESTALS 1 2 1.130 0.900 0.300 0.6102
OHE MAST 1 2 0.900 0.900 2.058 3.3340
OHE MAST -1 2 3.141 0.063 1.400 -0.5497
BRIDGE-334 0.0000
REMARKS
SCHEDULE - B6
Item No : 40 Approach Slab at formation level, Dirt Wall,ballast wall at Formation level
SL DESCRIPTION NOS NOS LENGTH WIDTH HEIGHT QUANTITY
NO (M) (M) (M) (M3)
BRIDGE-362
A1DIRT WALL 1 1 7.850 0.350 1.818 4.995
BRIDGE-361
A1DIRT WALL 1 1 8.100 0.350 1.818 5.154
BRIDGE-360
A1DIRT WALL 1 1 8.100 0.350 2.828 8.017
BRIDGE-351
A1DIRT WALL 1 1 7.850 0.350 2.828 7.770
BRIDGE-346
A1DIRT WALL 1 1 8.100 0.350 1.818 5.154
BRIDGE-334
A1DIRT WALL 1 1 8.100 0.400 3.949 12.795
BRIDGE-330
A1DIRT WALL 1 1 8.100 0.350 2.828 8.017
BRIDGE-327
A1DIRT WALL 1 1 7.850 0.350 1.818 4.995
BRIDGE-314
A1DIRT WALL 1 1 8.100 0.350 1.818 5.154
BRIDGE-312
A1DIRT WALL 1 1 8.100 0.350 2.828 8.017
BRIDGE-309
A1DIRT WALL 1 1 14.350 0.400 2.784 15.980
BRIDGE-303
A1DIRT WALL 1 1 8.100 0.350 2.828 8.017
BRIDGE-296
A1DIRT WALL 1 1 8.100 0.400 3.949 12.795
20.325 12.2
16.035
30.156 18.3
302.884
SCHEDULE - B6
Item No : 41 Extra for Every increase of 1m or part thereof in the height above 10m &20m
LENGTH WIDTH HEIGHT
SL NO DESCRIPTION NOS NOS (M) (M) (M)
LEVEL 10M TO 11.0M
BRIDGE-362
A2DIRT WALL 1 1 8.100 0.350 0.418
A2 DIRT WALL 1 2 3.000 0.350 0.418
A2 HUNCH 2 0.5 0.300 0.300 0.418
P3 PIER 1 1 3.000 2.000 1.000
P3 PIER 2 0.5 3.141 1.000 1.000
BRIDGE-361
A1 WALL 1 2 2.323 1.300 1.000
BRACING 1 1 2.326 1.100 0.800
A2 DIRT WALL 1 1 8.100 0.350 1.000
A2 FLYWING WALL 1 2 1.660 0.350 0.808
A2 FLYWING WALL 1 1 1.340 0.350 0.808
A2 FLYWING WALL 1 2 3.000 0.350 0.192
A2 HUNUCH 1 1 0.300 0.300 1.000
A2 PEDESTALS 1 2 1.130 0.465 0.290
BRIDGE-360
A1 &A2 CAP 1 2 8.100 1.300 0.900
A1 &A2 HANUCH 1 2 0.300 0.300 0.900
A1& A2 DIRT WALL 1 2 8.100 0.350 0.100
A1& A2 FLY WING WALL 1 2 1.301 0.400 0.900
BRIDGE-346
A1 WALL 1 1 7.850 1.3260 0.800
A1 CAP 1 1 8.100 1.300 0.200
BRIDGE-334
A1 WALL 1 2 2.038 1.3000 1.000
A2 DIRT WALL 1 1 8.100 0.350 0.512
A2 HUNCH 1 1 0.300 0.300 0.512
A2 FLY WING WALL 1 2 3.000 0.350 0.512
P2 CAP 1 1 8.100 1.325 0.367
P2 PEDESTALS 1 2 1.255 0.690 0.300
BRIDGE-330
A1CAP 1 1 8.100 1.3000 0.820
A1 HANUCH 1 1 0.300 0.300 1.000
A1 FLY WING WALL 1 2 0.237 0.400 1.000
A1 FLY WING WALL 1 1 1.314 0.400 1.000
A1 DIRT WALL 1 1 8.100 0.350 0.180
A1PEDESTALS 1 2 1.255 0.5600 0.180
A2FLY WING WALL 1 2 3.000 0.400 0.808
A2FLY WING WALL 1 2 2.748 0.400 0.192
A2FLY WING WALL 1 1 0.252 0.400 0.192
A2 DIRT WALL 1 1 8.100 0.350 1.000
A2 HANUCH 1 1 0.300 0.300 1.000
P1 SHAFT 1 1 4.000 2.500 1.000
P1 SHAFT 1 1 3.141 1.5620 1.000
BRIDGE-327
P1 SHAFT 1 1 3.700 2.5000 1.000
P1 SHAFT 1 1 3.141 1.5620 1.000
P2 SHAFT 1 1 3.700 2.5000 1.000
P2 SHAFT 1 1 3.141 1.5620 1.000
BRIDGE-314
P1 SHAFT 1 1 3.000 2.0000 0.500
P1 SHAFT 1 1 3.141 1.0000 0.500
P1 CAP 1 1 6.650 2.4000 0.200
P1 CAP 1 1 8.100 2.4000 0.300
P1 IP 1 1 12.900 1.2000 0.200
P2 SHAFT 1 1 3.000 2.0000 0.500
P2 SHAFT 1 1 3.141 1.0000 0.500
P2 CAP 1 1 6.650 2.4000 0.200
P2 CAP 1 1 8.100 2.4000 0.300
P2 IP 1 1 12.900 1.2000 0.200
BRIDGE-312
P1 SHAFT 1 1 3.750 2.5000 1.000
P1 SHAFT 1 1 3.141 1.5620 1.000
BRIDGE-303
P2 SHAFT 1 1 4.000 3.0000 1.000
P2 SHAFT 1 1 3.141 2.2500 1.000
BRIDGE-334
A1 WALL 2 2 1.713 1.3000 1.000
BRIDGE-330
A1PEDESTALS 2 2 1.255 0.5600 0.120
A1 HANUCH 2 1 0.300 0.300 1.000
A1 FLY WING WALL 2 2 1.551 0.400 1.000
A1 FLY WING WALL 2 1 1.315 0.400 1.000
A1 DIRT WALL 2 1 8.100 0.350 1.000
A2FLY WING WALL 2 2 3.000 0.400 0.192
A2 DIRT WALL 2 1 8.100 0.350 0.192
A2 HANUCH 2 1 0.300 0.300 0.192
P1 SHAFT 2 1 4.000 2.500 1.000
P1 SHAFT 2 1 3.141 1.5620 1.000
BRIDGE-327
P1 SHAFT 2 1 3.700 2.5000 1.000
P1 SHAFT 2 1 3.141 1.5620 1.000
P2 SHAFT 2 1 3.700 2.5000 1.000
P2 SHAFT 2 1 3.141 1.5620 1.000
BRIDGE-314
P1 CAP 2 1 8.100 2.4000 0.700
P1 PEDESTALS 2 2 1.130 0.9000 0.300
P2 CAP 2 1 8.100 2.4000 0.700
P2 PEDESTALS 2 2 1.130 0.9000 0.300
BRIDGE-312
P1 SHAFT 2 1 3.750 2.5000 1.000
P1 SHAFT 2 1 3.141 1.5620 1.000
BRIDGE-303
P2 SHAFT 2 1 4.000 3.0000 1.000
P2 SHAFT 2 1 3.141 2.2500 1.000
BRIDGE-330
A1 HANUCH 4 1 0.300 0.300 0.102
A1 FLY WING WALL 4 2 3.000 0.400 0.102
A1 DIRT WALL 4 1 8.100 0.350 0.102
P1 CAP 4 1 8.100 2.900 0.700
P1 CAP 4 1 8.100 1.450 0.300
P1 PEDESTALS 4 2 1.48 0.8 0.3
P2 CAP 4 1 8.100 2.900 0.915
P2 CAP 4 1 8.100 1.450 0.085
P2PEDESTALS 4 2 13.400 1.200 0.085
BRIDGE-312
P1 SHAFT 4 1 3.750 2.5000 1.000
P1 SHAFT 4 1 3.141 1.5620 1.000
BRIDGE-303 4
P2 SHAFT 4 1 4.000 3.0000 1.000
P2 SHAFT 4 1 3.141 2.2500 1.000
1.1850
0.8778
0.0376
6.0000
3.1410
6.0385
2.0469
2.8350
0.9389
0.3790
0.4032
0.0900
0.3048
18.954
0.162
0.567
0.937
8.327
2.106
5.298
1.452
0.046
1.075
3.939
0.520
8.635
0.090
0.190
0.526
0.510
0.253
1.939
0.422
0.019
2.835
0.090
10.000
4.906
9.250
4.906
9.250
4.906
3.000
1.571
3.192
5.832
3.096
3.000
1.571
3.192
5.832
3.096
9.375
4.906
12.000
7.067
7.200
3.769
6.480
7.776
12.384
0.000
10.751
0.000
1.687
11.340
0.360
4.627
2.104
0.000
8.905
0.337
0.180
2.482
1.052
5.670
0.922
1.089
0.035
20.000
9.812
18.500
9.812
18.500
9.812
27.216
1.220
27.216
1.220
18.750
9.812
24.000
14.135
0.000
0.000
46.656
1.220
0.000
14.138
0.000
17.010
0.540
11.779
1.206
0.104
3.510
0.270
0.722
0.017
6.444
8.505
15.000
7.359
35.235
19.2960
20.0840
19.2960
28.125
14.719
36.000
21.202
0.000
0.000
0.000
0.814
0.000
16.198
0.000
4.128
0.131
3.494
0.000
0.037
0.979
1.157
65.772
14.0940
2.8416
85.9734
3.9933
10.9344
37.500
19.625
48.000
28.269
0.000
0.000 1.2
0.000
9.050
25.799
0.221
9.720
0.544
0.000
32.886
32.160
32.886
32.160
50.9146 215
1.1517135
58.7250
34.5720
46.875
24.531
35.2350
32.1600
60.000
35.336
0.000
0.000
0.000
129.665 16.22
1.313
129.665
1.313
1.7354
5.7785
57.8880
56.250
29.437
126.8460
1.6415
72.000
42.404
0.000
0.000 1.5
0.000
4.213
4.213
11.813
6.182
134.833
45.024
3.8303
84.000
49.471
0.000
71.410
77.184
96.000
56.538
0.000
0.000
108.000
63.605
0.000
0.000
81.120
47.775
3320.722
SCHEDULE - B6
Item No : 41 Extra for Every increase of 1m or part thereof in the height above 10m &20m
SL NO DESCRIPTION NOS NOS LENGTH WIDTH HEIGHT
(M) (M) (M)
LEVEL 10M TO 11.0M
BRIDGE-362
A2DIRT WALL 1 1 8.100 0.350 0.418
A2 DIRT WALL 1 2 3.000 0.350 0.418
A2 HUNCH 2 0.5 0.300 0.300 0.418
P1 PIER 1 1 3.750 2.500 1.000
P1 PIER 2 0.5 3.141 1.562 1.000
P2 PIER 1 1 3.750 2.500 1.000
P2 PIER 2 0.5 3.141 1.562 1.000
P3 PIER 1 1 3.000 2.000 1.000
P3 PIER 2 0.5 3.141 1.000 1.000
BRIDGE-361
A1 WALL 1 2 2.323 1.300 1.000
BRACING 1 1 2.326 1.100 0.800
A2 DIRT WALL 1 1 8.100 0.350 1.000
A2 FLYWING WALL 1 2 1.660 0.350 0.808
A2 FLYWING WALL 1 1 1.340 0.350 0.808
A2 FLYWING WALL 1 2 3.000 0.350 0.192
A2 HUNUCH 1 1 0.300 0.300 1.000
A2 PEDESTALS 1 2 1.130 0.465 0.290
BRIDGE-360
A1 &A2 CAP 1 2 8.100 1.300 0.900
A1 &A2 HANUCH 1 2 0.300 0.300 0.900
A1& A2 DIRT WALL 1 2 8.100 0.350 0.100
A1& A2 FLY WING WALL 1 2 1.301 0.400 0.900
BRIDGE-346
A1 WALL 1 1 7.850 1.3260 0.800
A1 CAP 1 1 8.100 1.300 0.200
A1 IP 1 1 8.100 1.200 0.200
A1 HUNUCH 1 1 0.300 0.300 0.200
A1 FLY WALL 1 1 0.330 0.350 0.200
A1 DIRTWALL 1 1 8.100 0.350 0.200
A1 PEDESTALS 1 2 1.130 0.465 0.200
BRIDGE-334
A1 WALL 1 2 2.038 1.3000 1.000
LEVEL 11.0M TO 12.0M
BRIDGE-362
P1 PIER 2 1 3.750 2.500 1.000
P1 PIER 4 0.5 3.141 1.562 1.000
P2 PIER 2 1 3.750 2.500 1.000
P2 PIER 4 0.5 3.141 1.562 1.000
P3 PIER 2 1 3.000 2.000 0.600
P3 PIER 4 0.5 3.141 1.000 0.600
P3 CAP 2 1 6.750 2.400 0.200
P3 CAP 2 1 8.100 2.400 0.200
P3 IP 2 2 12.900 1.200 0.200
BRIDGE-361
A1 WALL 2 2 2.068 1.300 1.000
A2 DIRT WALL 2 1 8.100 0.350 0.808
A2 FLYWING WALL 2 2 3.000 0.350 0.808
A2 HUNUCH 2 1 0.300 0.300 0.808
BRIDGE-360
A1 & A2 PEDESTALS 2 4 1.255 0.560 0.300
A1 &A2DIRTWALL 2 2 8.100 0.350 1.000
A1 &A2 HANUCH 2 2 0.300 0.300 1.000
A1& A2 FLY WING WALL 2 4 1.446 0.400 1.000
A1& A2 FLY WING WALL 2 2 1.315 0.400 1.000
BRIDGE-346
A1 CAP 2 1 8.100 1.300 0.800
A1 DIRTWALL 2 1 8.100 0.350 1.000
A1 HUNUCH 2 1 0.300 0.300 1.000
A1 FLY WALL 2 2 0.330 0.350 1.000
A1 FLY WALL 2 1 1.649 0.350 1.000
A1 PEDESTALS 2 2 1.130 0.465 0.100
BRIDGE-334
A1 WALL 2 2 1.713 1.3000 1.000
LEVEL 12.0M TO 13.0M
BRIDGE-362
P1 PIER 3 1 3.750 2.500 1.000
P1 PIER 6 0.5 3.141 1.562 1.000
P2 PIER 3 1 3.750 2.500 1.000
P2 PIER 6 0.5 3.141 1.562 1.000
P3 CAP 3 1 8.100 2.400 0.800
P3 PEDESTALS 3 2 1.130 0.900 0.200
BRIDGE-361
A1 WALL 3 2 1.813 1.300 1.000
BRIDGE-360
A1 &A2DIRTWALL 3 2 8.100 0.350 1.000
A1 &A2 HANUCH 3 2 0.300 0.300 1.000
A1& A2 FLY WING WALL 3 4 3.000 0.400 0.818
A1& A2 FLY WING WALL 3 2 2.761 0.400 0.182
A1& A2 FLY WING WALL 3 2 0.239 0.400 0.182
BRIDGE-346
A1 DIRTWALL 3 1 8.100 0.350 1.000
A1 HUNUCH 3 1 0.300 0.300 1.000
A1 FLY WALL 3 2 1.979 0.350 0.618
A1 FLY WALL 3 1 1.021 0.350 0.618
A1 FLY WALL 3 2 3.000 0.350 0.382
BRIDGE-334
A1 WALL 3 2 1.500 1.3000 0.300
BRIDGE-346
A1 DIRTWALL 4 1 8.100 0.350 0.618
A1 HUNUCH 4 1 0.300 0.300 1.000
A1 FLY WALL 4 2 1.979 0.350 0.618
A1 FLY WALL 4 1 1.021 0.350 0.618
A1 FLY WALL 4 2 3.000 0.350 0.382
LEVEL 14.0M TO 15.0M
BRIDGE-362
P1 CAP 5 1 8.100 2.900 0.850
P1 IP 5 2 13.400 1.200 0.150
P1 CAP 5 1 8.100 1.450 0.150
P1 PEDESTALS 5 2 1.255 0.545 0.150
P2 CAP 5 1 8.100 2.900 0.316
P2 CAP 5 1 8.100 1.450 0.464
P2PEDESTALS 5 2 1.255 0.545 0.300
P2PEDESTALS 5 2 1.130 0.450 0.220
BRIDGE-361
A1 WALL 5 2 1.365 1.300 0.510
A1 CAP 5 1 8.100 1.300 0.490
A1 HUNUCH 5 1 0.300 0.300 0.490
A1 IP 5 1 8.100 1.200 0.200
A1 FLY WING WALL 5 1 0.634 0.350 0.490
BRIDGE-360
P1 CAP 5 1 8.100 2.900 0.720
P1 IP 5 2 13.400 1.200 0.200
1.185
0.878
0.038
9.375
4.906
9.375
4.906
6.000
3.141
6.039
2.047
2.835
0.939
0.379
0.403
0.090
0.305
18.954
0.162
0.567
0.937
8.327
2.106
1.944
0.018
0.023
0.567
0.210
5.298
18.750
9.812
18.750
9.812
7.200
3.769
6.480
7.776
12.384
0.000
10.751
4.581
3.394
0.145
0.000
1.687
11.340
0.360
4.627
2.104
0.000
0.000
16.848
5.670
0.180
0.462
1.154
0.210
8.905
0.000
0.000
28.125
14.719
28.125
14.719
46.656
1.220
0.000
14.138
0.000
17.010
0.540
11.779
1.206
0.104
0.000
0.000
8.505
0.270
2.568
0.663
2.407
3.510
0.000
0.000
0.000
0.000
24.375
12.756
24.882
4.698
6.432
4.350
2.276
24.882
54.873
25.728
0.814
0.000
16.198
0.000
4.128
0.131
3.494
0.000
0.000
7.008
0.360
3.424
0.883
3.209
0.000
0.000
0.000
0.000
0.000
0.000
0.000 1.2
0.000
99.833
24.120
8.809
1.026
37.114
27.248
2.052
1.119
0.000
9.050
25.799
0.221
9.720
0.544
0.000
84.564
32.160
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000 0.314
22.128
1.231
0.488
0.000
63.180
0.540
2.663
2.724
0.000
67.651
4.925
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000 1.5
0.000
0.737
0.630
2.207
19.647
2.528
7.822
2.175
0.000
0.000
0.000
0.000
0.000
0.000
0.000
18.779
13.910
0.596
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
SCHEDULE - B6
Item No : 50 RCC Raft foundation & Pile cap (Shuttering and Centering)
SL LENGTH WIDTH HEIGHT QUANTITY
DESCRIPTION NOS NOS GRADE REMARKS
NO (M) (M) (M) (M3)
BRIDG-362
A1 PILE CAP PCC 2 2 8.900 0.100 3.560
BRIDGE-361 0.000
BRIDGE-360 0.000
BRIDGE-346 0.000
A1 PCC 1 2 11.700 0.100 2.340
BRIDGE-334
A1 PCC 1 2 14.900 0.100 2.980
BRIDGE-330
A1 PCC 1 2 14.700 0.100 2.940
BRIDGE-327
A1 PCC 1 2 12.500 0.100 2.500
BRIDGE-314
A1 PCC 1 2 12.500 0.100 2.500
BRIDGE-312 0.000
A1 PCC 1 2 14.700 0.100 2.940
BRIDGE-303
A1 PCC 1 2 14.700 0.100 2.940
BRIDGE-296
A1 PCC 1 2 14.900 0.100 2.980
BRIDGE-309
A1 PCC 1 2 8.450 0.100 1.690
BRIDGE-351 448.06
A1 PCC 1 2 12.600 0.100 2.520
BRIDGE-334
A1SHAFT 2 2 3.450 12.300 169.7400
A1 SHAFT 2 2 1.300 12.300 63.9600
1ST BRACING BOTTOM 1 1 4.711 1.100 5.1821
2nd BRACING BOTTOM 1 1 3.711 1.100 4.0821
3rd BRACING BOTTOM 1 1 2.711 1.100 2.9821
BRACING SIDES 2 3 1.100 0.800 5.2800
DEDUCTION FOR BRACING -1 2 10.742 1.100 -23.6324
A2 SHAFT 1 2 7.850 7.230 113.5110
A2 SHAFT 1 2 1.600 7.230 23.1360
BRIDGE-330
A1 SHAFT 1 2 7.850 9.820 154.1740
A1 SHAFT 1 2 1.600 9.820 31.4240
A2 SHAFT 1 2 7.850 7.910 124.1870
A2 SHAFT 1 2 1.600 7.910 25.3120
A2 RWALL 1 2 77.000 4.250 654.5000
A2 RWALL 1 2 0.375 4.250 3.1875
P1 BRWALL 1 2 16.000 2.750 88.0000
P1 BRWALL 1 2 15.400 2.750 84.7000
P1 BRWALL 1 2 13.000 2.000 52.0000
P1 BRWALL 1 2 12.400 2.000 49.6000
P1 BRWALL 1 2 2.750 0.750 4.1250
P1 BRWALL 1 2 2.450 0.750 3.6750
BRIDGE-327
A1 SHAFT 1 2 7.850 7.328 115.0496
A1 SHAFT 1 2 1.600 7.328 23.4496
A2 SHAFT 1 2 7.850 7.328 115.0496
A2 SHAFT 1 2 1.600 7.328 23.4496
BRIDGE-314
A1 SHAFT 1 2 7.850 6.600 103.6200
A1 SHAFT 1 2 1.500 6.600 19.8000
A2 SHAFT 1 2 7.850 9.500 149.1500
A2 SHAFT 1 2 1.550 9.500 29.4500
P1 BRWALL 1 2 13.000 2.500 65.0000
P1 BRWALL 1 2 12.400 2.500 62.0000
P1 BRWALL 1 2 9.500 2.000 38.0000
P1 BRWALL 1 2 8.900 2.000 35.6000
P1 BRWALL 1 2 1.450 0.500 1.4500
P1 BRWALL 1 2 1.150 0.500 1.1500
P2 BRWALL 1 2 13.000 2.500 65.0000
P2 BRWALL 1 2 12.400 2.500 62.0000
P2 BRWALL 1 2 9.500 2.000 38.0000
P2 BRWALL 1 2 8.900 2.000 35.6000
P2 BRWALL 1 2 1.450 0.500 1.4500
P2 BRWALL 1 2 1.150 0.500 1.1500
BRIDGE-312
A1 SHAFT 1 2 7.850 10.249 160.9093
A1 SHAFT 1 2 1.600 10.249 32.7968
A2 SHAFT 1 2 7.850 9.840 154.4880
A2 SHAFT 1 2 1.600 9.840 31.4880
BRIDGE-303
A1 SHAFT 1 2 7.850 9.667 151.7719
A1 SHAFT 1 2 1.600 9.667 30.9344
A2 SHAFT 2 2 3.450 12.750 175.9500
A2 SHAFT 2 2 1.300 12.750 66.3000
1ST BRACING BOTTOM 1 1 4.703 1.100 5.1733
2nd BRACING BOTTOM 1 1 3.706 1.100 4.0766
3rd BRACING BOTTOM 1 1 2.709 1.100 2.9799
BRACING SIDES 2 3 1.100 0.800 5.2800
DEDUCTION FOR BRACING -1 2 10.743 1.100 -23.6346
P2 BRWALL 1 2 19.500 2.800 109.2000
P2 BRWALL 1 2 18.900 2.800 105.8400
P2 BRWALL 1 2 17.000 2.800 95.2000
P2 BRWALL 1 2 16.400 2.800 91.8400
BRIDGE-296
A1 SHAFT 2 2 3.450 12.200 168.3600
A1 SHAFT 2 2 1.300 12.200 63.4400
1ST BRACING BOTTOM 1 1 4.713 1.100 5.1843
2nd BRACING BOTTOM 1 1 3.711 1.100 4.0821
3rd BRACING BOTTOM 1 1 2.718 1.100 2.9898
BRACING SIDES 2 3 1.100 0.800 5.2800
DEDUCTION FOR BRACING -1 2 10.752 1.100 -23.6544
A2 SHAFT 2 2 3.450 15.400 212.5200
A2 SHAFT 2 2 1.300 15.400 80.0800
1ST BRACING BOTTOM 1 1 4.659 1.100 5.1249
2nd BRACING BOTTOM 1 1 3.664 1.100 4.0304
3rd BRACING BOTTOM 1 1 2.665 1.100 2.9315
BRACING SIDES 2 3 1.100 0.800 5.2800
DEDUCTION FOR BRACING -1 2 10.679 1.100 -23.4938
BRIDGE-309
A1 &A2SHAFT 2 2 14.350 9.200 528.0800
A1 &A2SHAFT 2 2 1.500 9.200 55.2000 583.28
BRIDGE-351
A1 &A2SHAFT 2 2 7.850 8.667 272.1438
A1 &A2SHAFT 2 2 1.500 8.667 52.0020
TOTAL QTY 6069.0503 0.000
SCHEDULE - B6
Item No : 52Abutment Cap,Pier Cap,Inspection Platform & Pedestal Over Pier Cap, Fender wall,
Diphram wall etc.
SL LENGTH WIDTH HEIGHT QUANTIT
NO DESCRIPTION NOS NOS (M) (M) (M) Y (M3) GRADE REMARKS
BRIDGE-362
A1 CAP SIDES 1 1 7.850 0.800 6.2800
A1 CAP SIDES 1 1 5.650 1.000 5.6500
A1 CAP SIDES 1 2 1.300 1.000 2.6000
A1 IP-BTM 1 1 7.850 1.200 9.4200
A1 IP SIDES 1 1 7.850 0.200 1.5700
A1 IP SIDES 1 1 1.200 0.200 0.2400
A1 PEDESTALS 2 2 1.130 0.300 1.3560
A1 PEDESTALS 2 2 0.465 0.300 0.5580
OHE MAST 2 4 0.900 2.058 14.8176
OHE MAST 2 1 1.571 1.400 4.3974
A2 CAP SIDES 1 1 8.100 0.800 6.4800
A2 CAP SIDES 1 1 6.800 1.000 6.8000
A2 CAP SIDES 2 1 1.300 1.000 2.6000
A2 CAP BOTTOM 1 2 0.125 1.300 0.3250
A2 IP-BOTTOM 1 1 8.100 1.200 9.7200
A2 IP-SIDES 1 1 8.100 0.200 1.6200
A2 IP-SIDES 1 2 1.200 0.200 0.4800
A2 FLYWING WALL BTM 2 1 3.507 0.350 2.4549
A2 FLYWING WALL 2 2 3.000 1.000 12.0000
A2 FLYWING WALL 2 1 0.350 1.000 0.7000
A2 FLYWING WALL SLOPE AREA 4 0.5 3.000 1.818 10.9080
HANUCH 2 1 0.424 2.818 2.3897
A2 PEDESTALS 2 2 1.130 0.300 1.3560
A2 PEDESTALS 2 2 0.465 0.300 0.5580
OHE MAST 2 4 0.900 2.058 14.8176
OHE MAST 2 1 1.571 1.400 4.3974
P1&p2 CAP BOTTOM 2 1 6.600 2.900 38.2800
P1&p2 CAP BOTTOM 2 2 0.808 2.900 9.3702
IP BOTTOM 2 2 10.500 1.200 50.4000
IP BOTTOM 2 2 2.900 1.200 13.9200
IP SIDES 2 2 10.500 0.200 8.4000
IP SIDES 2 2 5.300 0.200 4.2400
CAP SIDES 2 2 6.200 0.300 7.4400
CAP SIDES 2 2 0.808 0.300 0.9696 4X0.5
CAP SIDES 2 1 8.100 0.700 11.3400
CAP SIDES 2 1 8.100 1.164 18.8568
CAP SIDES 2 1 8.100 0.464 7.5168
CAP SIDES 2 2 2.900 0.700 8.1200
CAP SIDES 2 2 1.450 0.464 2.6912
PEDESTALS 2 2 1.255 0.300 1.5060
PEDESTALS 2 4 0.540 0.300 1.2960
PEDESTALS 2 2 1.130 0.300 1.3560
PEDESTALS 2 4 0.450 0.300 1.0800
OHE MAST 2 8 0.900 2.058 29.6352
OHE MAST 2 2 1.571 2.058 12.9284
DEDUCTION PIER AREA -2 1 3.700 2.500 -18.5000
DEDUCTION PIER AREA -2 1 3.141 1.563 -9.8156
P3 CAP BOTTOM 1 1 5.400 2.400 12.9600
P3 CAP BOTTOM 1 2 1.365 2.900 7.9155
IP BOTTOM 1 2 10.500 1.200 25.2000
IP BOTTOM 1 2 2.400 1.200 5.7600
IP SIDES 1 2 10.500 0.200 4.2000
IP SIDES 1 2 4.800 0.200 1.9200
CAP SIDES 1 2 5.400 0.200 2.1600
CAP SIDES 1 2 1.365 0.200 0.5459
CAP SIDES 1 2 8.100 0.800 12.9600
CAP SIDES 1 2 2.400 0.800 3.8400
PEDESTALS 2 2 1.130 0.300 1.3560
PEDESTALS 2 2 0.900 0.300 1.0800
OHE MAST 1 8 0.900 2.058 14.8176
OHE MAST 1 2 1.571 2.058 6.4642
DEDUCTION PIER AREA -1 1 3.000 2.000 -6.0000
DEDUCTION PIER AREA -1 1 3.141 1.000 -3.1410
BRIDGE-361
A1 CAP SIDES 1 1 8.100 1.300 10.5300
A1 CAP SIDES 1 1 6.800 1.500 10.2000
A1 CAP SIDES 2 1 1.300 1.500 3.9000
A1 CAP BOTTOM 1 2 0.125 1.300 0.3250
A1 IP-BOTTOM 1 1 8.100 1.200 9.7200
A1 IP-SIDES 1 1 8.100 0.200 1.6200
A1 IP-SIDES 1 2 1.200 0.200 0.4800
A1 FLYWING WALL BTM 2 1 3.507 0.350 2.4549
A1 FLYWING WALL 2 2 3.000 1.000 12.0000
A1 FLYWING WALL 2 1 0.350 1.000 0.7000
A1 FLYWING WALL SLOPE AREA 4 0.5 3.000 1.818 10.9080
HANUCH 2 1 0.424 2.818 2.3897
A1 PEDESTALS 2 2 1.130 0.300 1.3560
A1 PEDESTALS 2 2 0.465 0.300 0.5580
OHE MAST 2 4 0.900 2.058 14.8176
OHE MAST 2 1 1.571 1.400 4.3974
BRIDGE-360
A1 CAP SIDES 1 1 8.100 0.800 6.4800
A1 CAP SIDES 1 1 6.700 1.000 6.7000
A1 CAP SIDES 2 1 1.300 1.000 2.6000
A1 CAP BOTTOM 1 2 0.125 1.300 0.3250
A1 IP-BOTTOM 1 1 8.100 1.200 9.7200
A1 IP-SIDES 1 1 8.100 0.200 1.6200
A1 IP-SIDES 1 2 1.200 0.200 0.4800
A1 FLYWING WALL BTM 2 1 3.769 0.400 3.0152
A1 FLYWING WALL 2 2 3.000 1.000 12.0000
A1 FLYWING WALL SIDE 2 1 0.400 1.000 0.8000
A1 FLYWING WALL SLOPE AREA 4 0.5 3.000 2.282 13.6920
HANUCH 2 1 0.424 3.282 2.7831
A1 PEDESTALS 2 2 1.255 0.300 1.5060
A1 PEDESTALS 2 2 0.560 0.300 0.6720
OHE MAST 2 4 0.900 2.522 18.1584
OHE MAST 2 1 1.571 1.400 4.3974
BRIDGR-346
A1 CAP SIDES 1 1 8.100 0.800 6.4800
A1 CAP SIDES 1 1 6.800 1.000 6.8000
A1 CAP SIDES 2 1 1.300 1.000 2.6000
A1 CAP BOTTOM 1 2 0.125 1.300 0.3250
A1 IP-BOTTOM 1 1 8.100 1.200 9.7200
A1 IP-SIDES 1 1 8.100 0.200 1.6200
A1 IP-SIDES 1 2 1.200 0.200 0.4800
A1 FLYWING WALL BTM 2 1 3.507 0.350 2.4549
A1 FLYWING WALL 2 2 3.000 1.000 12.0000
A1 FLYWING WALL SIDE 2 1 0.350 1.000 0.7000
A1 FLYWING WALL SLOPE AREA 4 0.5 3.000 1.818 10.9080
HANUCH 2 1 0.424 2.818 2.3897
A1 PEDESTALS 2 2 1.255 0.300 1.5060
A1 PEDESTALS 2 2 0.560 0.300 0.6720
OHE MAST 2 4 0.900 2.058 14.8176
OHE MAST 2 1 1.571 1.400 4.3974
BRIDGE-330
A1 CAP SIDES 1 1 8.100 0.800 6.4800
A1 CAP SIDES 1 1 6.800 1.000 6.8000
A1 CAP SIDES 2 1 1.300 1.000 2.6000
A1 CAP BOTTOM 1 2 0.125 1.300 0.3250
A1 IP-BOTTOM 1 1 8.100 1.200 9.7200
A1 IP-SIDES 1 1 8.100 0.200 1.6200
A1 IP-SIDES 1 2 1.200 0.200 0.4800
A1 FLYWING WALL BTM 2 1 3.769 0.400 3.0152
A1 FLYWING WALL 2 2 3.000 1.000 12.0000
A1 FLYWING WALL SIDE 2 1 0.400 1.000 0.8000
A1 FLYWING WALL SLOPE AREA 4 0.5 3.000 2.282 13.6920
HANUCH 2 1 0.424 3.282 2.7831
A1 PEDESTALS 2 2 1.255 0.300 1.5060
A1 PEDESTALS 2 2 0.560 0.300 0.6720
OHE MAST 2 4 0.900 2.522 18.1584
OHE MAST 2 1 1.571 1.400 4.3974
BRIDGE-327
A1 CAP SIDES 1 1 7.850 0.800 6.2800
A1 CAP SIDES 1 1 5.850 1.000 5.8500
A1 CAP SIDES 1 2 1.300 1.000 2.6000
A1 IP-BTM 1 1 12.850 1.200 15.4200
A1 IP SIDES 1 1 10.250 0.200 2.0500
A1 IP SIDES 1 2 2.500 0.200 1.0000
A1 PEDESTALS 2 2 1.130 0.300 1.3560
A1 PEDESTALS 2 2 0.470 0.300 0.5640
OHE MAST 2 4 0.900 2.058 14.8176
OHE MAST 2 1 1.571 1.400 4.3974
A1 FLYWING WALL BTM 2 1 3.507 0.400 2.8056
A1 FLYWING WALL 2 2 3.000 1.000 12.0000
A1FLYWING WALL 2 1 0.400 1.000 0.8000
A1 FLYWING WALL SLOPE AREA 4 0.5 3.000 1.818 10.9080
BRIDGE-334
A1DIRT WALL 1 1 8.100 3.689 29.8809
A1DIRT WALL 1 1 6.700 3.689 24.7163
A1DIRT WALL 1 2 0.400 3.689 2.9512
A2DIRT WALL 1 1 8.100 2.282 18.4842
A2DIRT WALL 1 1 6.800 2.282 15.5176
A2DIRT WALL 1 2 0.350 2.282 1.5974
BRIDGE-330
A1DIRT WALL 1 1 8.100 2.282 18.4842
A1DIRT WALL 1 1 6.700 2.282 15.2894
A1DIRT WALL 1 2 0.350 2.282 1.5974
A2DIRT WALL 1 1 8.100 2.282 18.4842
A2DIRT WALL 1 1 6.700 2.282 15.2894
A2DIRT WALL 1 2 0.350 2.282 1.5974
BRIDGE-327
A1DIRT WALL 1 1 7.850 1.818 14.2713
A1DIRT WALL 1 1 5.850 1.818 10.6353
A1DIRT WALL 1 2 0.350 1.818 1.2726
A2DIRT WALL 1 1 7.850 1.818 14.2713
A2DIRT WALL 1 1 5.850 1.818 10.6353
A2DIRT WALL 1 2 0.350 1.818 1.2726
BRIDGE-314
A1DIRT WALL 1 1 8.100 1.818 14.7258
A1DIRT WALL 1 1 6.800 1.818 12.3624
A1DIRT WALL 1 2 0.350 1.818 1.2726
A2DIRT WALL 1 1 8.100 1.818 14.7258
A2DIRT WALL 1 1 6.800 1.818 12.3624
A2DIRT WALL 1 2 0.350 1.818 1.2726
BRIDGE-312
A1DIRT WALL 1 1 8.100 2.282 18.4842
A1DIRT WALL 1 1 6.700 2.282 15.2894
A1DIRT WALL 1 2 0.350 2.282 1.5974
A2DIRT WALL 1 1 8.100 2.282 18.4842
A2DIRT WALL 1 1 6.800 2.282 15.5176
A2DIRT WALL 1 2 0.350 2.282 1.5974
BRIDGE-303
A1DIRT WALL 1 1 8.100 2.282 18.4842
A1DIRT WALL 1 1 6.700 2.282 15.2894
A1DIRT WALL 1 2 0.350 2.282 1.5974
A2DIRT WALL 1 1 8.100 3.689 29.8809
A2DIRT WALL 1 1 6.800 3.689 25.0852
A2DIRT WALL 1 2 0.400 3.689 2.9512
BRIDGE-296
A1DIRT WALL 1 1 8.100 3.689 29.8809
A1DIRT WALL 1 1 6.800 3.689 25.0852
A1DIRT WALL 1 2 0.400 3.689 2.9512
A2DIRT WALL 1 1 8.100 3.689 29.8809
A2DIRT WALL 1 1 6.800 3.689 25.0852
A2DIRT WALL 1 2 0.400 3.689 2.9512
TOTAL QTY 791.4243
el
GRADE REMARKS
0.000
RAMNA-SINGRAULI DOUBLING WORK PROJECT UNDER DHANABAD DIVISION AT EAST CENTRAL RAILWAY
SCH-C1(1) CEMENT
SL ITEM LENGTH WIDTH HEIGHT QUANTITY
NO DESCRIPTION NO (M) (M) (M) (M3) GRADE REMARKS
SCH-C1(1)
BRG-362 -P3 PIER PCC 1 12.804 320 1000 4.097 C1-1
BRG-360 -A1 ABUTEMENT PCC 1 14.774 320 1000 4.728 C1-1
BRG-362 -P3 PIER RAFT 1 212.875 440 1000 93.665 C1-1
BRG-360 -A1 ABUTEMENT RAFT 1 314.215 440 1000 138.255 C1-1
BRG-361 -A2 ABUTEMENT PCC 1 13.313 320 1000 4.260 C1-1
362-A2 PCC 1 12.376 320 1000 3.960 C1-1
361-A2 ABUTMENT RAFT 1 269.924 440 1000 118.767 C1-1
2 361 A2 SIDE
3 360 A1 SIDE
4 334A1 SIDE
5 334A2 SIDE
6 330A1 SIDE
7 330A2 SIDE
8 314A1 SIDE
9 314A2 SIDE
SCH-A2-SLIPFORM
#REF!
TOTAL
SCH-B1(1) EARTHWORK FILLING QTY
SCH-B2(1) -PCC
10.471
1 346-P1 1 11.700 8.950 0.100
8.160
2 330A2 RWALL PCC 1 24.000 3.400 0.100
TOTAL QTY 18.631
SCH-B6(31)- EARTHWORK
1 346-P1 1 20.439 17.689 1.119 404.569
2 330-RWALL 1 24.000 3.400 1.750 142.800
TOTAL QTY 547.369
SCH-B6(33)- HARD ROCK
1 330-RWALL 1 29.00 0.60 0.50 8.700
2 346-P1 1 16.290 13.540 7.180 1583.668
1592.368
SCH-B6(35/30)-RAFT
1 346-P1 1 11.500 8.750 1.800 181.125
2 303-P2 RAFT 1 19.500 17.000 1.500 497.250
3 303-P2 RAFT 0.267 331.500 112.500 193.115 169.897
4 362-RWALL 1 17.000 4.400 0.600 44.880
5 362-RWALL 1 17.000 0.500 0.600 5.100
6 330-RWALL 1 24.000 3.200 0.500 38.400
7 330-RWALL 1 24.000 0.500 0.500 6.000
Total qty 942.652
SCH-B6(37)-SHAFT
1 334-A1 2 2.580 1.300 6.950 46.620
2 334-A1-2ND BRACING 1 3.590 1.100 0.800 3.159
3 334-A1-3RD BRACING 1 2.581 1.100 0.800 2.271
4 361-A1 2 4.353 1.300 4.428 50.115
5 361-A1-1ST BRACING 1 4.177 1.100 0.800 3.675
6 361-A1-2ND BRACING 1 3.252 1.100 0.800 2.861
TOTAL QTY 108.701
SCH-B6(38)-R/WALL
1 362/A2 RWALL 1 60.000 0.450 5.150 139.050
2 362/A2 RWALL -1 31.000 0.425 3.000 -39.525
3 330/A2 RWALL 1 24.000 0.412 3.000 29.664
TOTAL QTY 129.189
SCH-B6(39)-CAPS
6 330 A2 CAP 1 8.100 1.300 1.000 10.530
7 330A2 IP 1 8.100 1.200 0.200 1.944
8 330 A2 PEDESTALAS 2 1.255 0.560 0.300 0.421
Total qty 12.895
SCH-B6(41) 10.0m to 11.0M LEVEL
11.0M TO 12.0M LEVEL 0.000
12.0m to 13.0M LEVEL 0.000
13.0M TO 14.0M LEVEL 0.000
14.0M TO 15.0M LEVEL
GRAND TOTAL QTY #REF!
GRADE REMARKS
M-15
M-15
B6-35
B6-35
B6-35 667.148
B6-35
848.272
1212.068
5.15
B6-50
B6-50
B6-50
B6-50
2X2
3.46+3.72
2.711+2.452
1620.36 628.272
2248.632 1620.35
80.036 7.85 628.2826 2248.633
#REF!
C1-1 11.52
C1-1 138.16
523.918