SCHEDULE - B6-1

Bridges
Item No : 34 Hard rock (Blasting prohibited )
Length Breadth Height Quntity
S.No Description No's (m) (m) (m) (m3)
Br.No:296 (112/153.640)
1 Abutment-1 1 16.841 11.141 2.283 428.349
Br.No:312 (116/383.790)
1 Abutment-1 1 17.245 12.595 3.491 758.248
Br.No:314 (116.773.570)
1 Abutment-1 1 14.989 13.139 3.378 665.265
2 Pier-1 1 15.339 11.878 2.756 502.134
Br.No:327 (120/339.423)
1 Pier-2 1 15.014 16.014 4.028 968.469
Br.No:330 (122/550.300)
1 Abutment-1 1 17.179 12.529 2.958 636.667
Br.No:334 (124/030.380)
1 Abutment-1 1 16.359 10.659 1.319 229.995
2 Abutment-2 1 16.975 12.325 2.551 533.712
Br.No:346 (126/712.700)
1 Abutment-1 1 15.001 12.350 5.003 926.868
2 Pier-1 1 16.090 12.840 7.180 1483.356
3 Pier-2
4 Abutment-2
Br.No:362 (130/232.790)
1 Abutment-1
2 Pier-1
3 Pier-2
Total 7133.063
5940.000
1193.063
Remarks

Up To Date Qty.
Paid Upto 7th AC Bill
Payble Qty.
SCHEDULE - B6-
Bridges
Item No : 33 Hard rock (requiring blasting )
Length Breadth Height Quntity
S.No Description No's (m) (m) (m) (m3)
Br.No:330 (122/550.300)
1 Pier-1 1 15.294 18.294 2.188 612.177
Total 612.177
600.000
12.177
Remarks

Up To Date Qty.
Paid Upto 7th AC Bill
Payble Qty.
SCHEDULE - B6
Bridges
Item No : 31 Earth Work Excavation (All Kinds of Soils)
Length Breadth Height Quntity
S.No Description No's (m) (m) (m) (m3)
Br.No:296 (112/153.640)
1 Abutment-1 1 19.318 13.517 2.673 697.9775
2 Abutment-2 1 19.260 13.560 7.120 1859.4991
Br.No:303 (113/770.000)
1 Abutment-2 1 18.606 12.906 5.812 1395.6300
Br.No:312 (116/383.790) 0.0000
1 Abutment-1 1 20.295 15.645 2.611 829.0324
2 Abutment-2 1 18.265 13.615 5.531 1375.4379
Br.No:314 (116.773.570)
1 Abutment-1 1 19.413 17.563 5.470 1864.9993
2 Pier-1 1 17.983 14.483 2.455 639.3993
3 Pier-2 1 16.047 12.547 4.095 824.4943
4 Abutment-2 1 16.730 13.580 5.461 1240.7032
Br.No:327 (120/339.423)
1 Pier-1 1 15.486 16.486 4.972 1269.3625
2 Pier-2 1 17.876 18.876 1.697 572.6143
Br.No:330 (122/550.300)
1 Abutment-1 1 20.348 15.698 3.381 1079.9688
2 Pier-1 1 18.773 21.773 4.770 1949.7114
3 Abutment-2 1 17.431 12.781 3.463 771.5066
Br.No:334 (124/030.380)
1 Abutment-1 1 19.099 13.399 4.160 1064.5752
2 Abutment-2 1 18.738 14.088 0.976 257.6454
Br.No:346 (126/712.700)
1 Abutment-1 1 19.351 16.700 3.698 1195.0520
2 Pier-1 1 20.199 16.989 1.119 383.9969
3 Pier-2 - - - -
4 Abutment-2 - - - -
Br.No:360 (129/883.420)
1 Abutment-1 1 19.026 14.376 6.652 1819.4402
4 Abutment-2 1 18.377 13.790 5.481 1388.9886
Br.No:361 (129/973.010)
1 Abutment-1 1 17.327 14.627 9.255 2345.6060
4 Abutment-2 1 16.844 18.339 6.689 2066.2463
Br.No:362 (130/232.790)
1 Abutment-1
2 Pier-1
3 Pier-2
4 Pier-3 1 16.298 12.798 4.197 875.4178
5 Abutment-2 1 14.228 14.078 4.056 812.4240
Total 28579.729
23132.000
5447.729
)

Remarks

Up To Date Qty.
Paid Upto 7th AC Bill
Payble Qty.
SCHEDULE - B6
Bridges
Item No : 31 Earth Work Excavation (All Kinds of Soils)
Length Breadth Height Quntity
S.No Description No's (m) (m) (m) (m3)
Br.No:296 (112/153.640)
1 Abutment-1 1 19.318 13.517 2.673 697.9775
2 Abutment-2 1 19.260 13.560 7.120 1859.4991
Br.No:303 (113/770.000)
1 Abutment-2 1 18.606 12.906 5.812 1395.6300
Br.No:312 (116/383.790) 0.0000
1 Abutment-1 1 20.295 15.645 2.611 829.0324
2 Abutment-2 1 18.265 13.615 5.531 1375.4379
Br.No:314 (116.773.570)
1 Abutment-1 1 19.413 17.563 5.470 1864.9993
2 Pier-1 1 17.983 14.483 2.455 639.3993
3 Pier-2 1 16.047 12.547 4.095 824.4943
4 Abutment-2 1 16.730 13.580 5.461 1240.7032
Br.No:327 (120/339.423)
1 Pier-1 1 15.486 16.486 4.972 1269.3625
2 Pier-2 1 17.876 18.876 1.697 572.6143
Br.No:330 (122/550.300)
1 Abutment-1 1 20.348 15.698 3.381 1079.9688
2 Pier-1 1 18.773 21.773 4.770 1949.7114
3 Abutment-2 1 17.431 12.781 3.463 771.5066
Br.No:334 (124/030.380)
1 Abutment-1 1 19.099 13.399 4.160 1064.5752
2 Abutment-2 1 18.738 14.088 0.976 257.6454
Br.No:346 (126/712.700)
1 Abutment-1 1 19.351 16.700 3.698 1195.0520
2 Pier-1 1 20.199 16.989 1.119 383.9969
3 Pier-2 - - - -
4 Abutment-2 - - - -
Br.No:360 (129/883.420)
1 Abutment-1 1 19.026 14.376 6.652 1819.4402
4 Abutment-2 1 18.377 13.790 5.481 1388.9886
Br.No:361 (129/973.010)
1 Abutment-1 1 17.327 14.627 9.255 2345.6060
4 Abutment-2 1 16.844 18.339 6.689 2066.2463
Br.No:362 (130/232.790)
1 Abutment-1
2 Pier-1
3 Pier-2
4 Pier-3 1 16.298 12.798 4.197 875.4178
5 Abutment-2 1 14.228 14.078 4.056 812.4240
Total 28579.729
23132.000
5447.729
)

Remarks

Up To Date Qty.
Paid Upto 7th AC Bill
Payble Qty.
RAMNA-SINGRAULI DOUBLING WORK PROJECT UNDER DHANABAD DIVISION AT EAST CENTRAL RAILWAY
SCH-C1(1) CEMENT
SL ITEM LENGTH WIDTH HEIGHT QUANTITY
NO DESCRIPTION NO (M) (M) (M) (M3) GRADE REMARKS
SCH-C1(1)
BRG-362 -P3 PIER PCC 1 12.804 320 1000 4.097 C1-1
BRG-360 -A1 ABUTEMENT PCC 1 14.774 320 1000 4.728 C1-1
BRG-362 -P3 PIER RAFT 1 212.875 440 1000 93.665 C1-1
BRG-360 -A1 ABUTEMENT RAFT 1 314.215 440 1000 138.255 C1-1
BRG-361 -A2 ABUTEMENT PCC 1 13.313 320 1000 4.260 C1-1
362-A2 PCC 1 12.376 320 1000 3.960 C1-1
361-A2 ABUTMENT RAFT 1 269.924 440 1000 118.767 C1-1

TOTAL QTY 367.732


RAMNA-SINGRAULI DOUBLING WORK PROJECT UNDER DHANABAD DIVISION AT EAST
CENTRAL RAILWAY
SCH-B6(31) Earthwork in excavation for foundations
SL ITEM LENGTH WIDTH HEIGHT QUANTITY
NO DESCRIPTION NO (M) (M) (M) (M3) GRADE REMARKS
SCH-B6(31)
BRG-362 -P3 PIER 1 13.200 9.700 4.197 537.384 B6-31
BRG-360 -A1 ABUTEMENT 1 14.700 10.050 6.652 982.733 B6-31
BRG-361 -A2 ABUTEMENT 1 12.500 10.650 6.689 890.473 B6-31
362-A2 ABUTMENT 1 11.200 11.050 4.056 501.971 B6-31

TOTAL QTY 2912.561


RAMNA-SINGRAULI DOUBLING WORK PROJECT UNDER DHANABAD DIVISION AT EAST
CENTRAL RAILWAY
SCH-B6(31) Earthwork in excavation for foundations
SL ITEM LENGTH WIDTH HEIGHT QUANTITY
NO DESCRIPTION NO (M) (M) (M) (M3) GRADE REMARKS
SCH-B6(31)
BRG-362 -P3 PIER 1 13.200 9.700 4.197 537.384 B6-31
BRG-360 -A1 ABUTEMENT 1 14.700 10.050 6.652 982.733 B6-31
BRG-361 -A2 ABUTEMENT 1 12.500 10.650 6.689 890.473 B6-31
362-A2 ABUTMENT 1 11.200 11.050 4.056 501.971 B6-31

TOTAL QTY 2912.561


SCHEDULE - A2
Item No : 01 EXPANSION JOINTS

DESCRIPTI LENGTH WIDTH HEIGHT QUANTITY


SL NO ON ITEM NO (M) (M) (M) (M3) GRADE REMARKS
EXPANSION JOINTS
1 12.2 4.9 15 73.5
2 18.3 4.9 20 98
3 24.4 5.2 8 41.6
4 30.5 5.2 17 88.4
301.5
SCHEDULE - A2
Item No : 02 Providing slipformform shuttering work with contractor's all accessories (slipform shuttering
materials,hydraulics jack,pump,climbing rod,yoke beam,yoke leg and all other arrangements
SL DESCRIPTION ITEM NOS LENGTH WIDTH HEIGHT QUANTITY GRADE REMARKS
NO NO (M) (M) (M) (M3)

BRIDGE-362
P1&P2 2 2 3.700 13.650 202.020

P1&P2 1 1 7.8525 13.650 107.187

2 1 1 7.8525 13.116 102.993

P3 1 2 3.000 11.6 69.600

1 1 6.2820 11.6 72.871

BRIDGE-351 0.000

P1 TO P5 5 2 4.000 20.91 836.400

P1 TO P6 5 1 9.4230 20.91 985.175

BRIDGE-346 0.000

P1 &P2 2 2 4.000 14.36 229.760

P1 &P3 2 1 7.8525 14.36 225.524

BRIDGE-330 0.000

P1 1 2 4.000 12.5 100.000

P2 1 1 7.8525 12.5 98.156

BRIDGE-327 0.000

P1 &P2 2 2 3.700 12 177.600

P1 &P3 2 1 7.8525 12 188.460

BRIDGE-314 0.000

P1&P2 2 2 3.000 10.5 126.000

P1&P3 2 1 6.2820 10.5 131.922

BRIDGE-312 0.000

P1 1 2 3.750 16.18 121.350

P2 1 1 7.8525 16.18 127.053

BRIDGE-309 0.000

P1 & P2 2 2 9.4230 22.1 832.993

BRIDGE-303 0.000

P2 1 2 4.000 19.676 157.408

P2 1 1 9.4230 19.676 185.407

BRIDGE-296 0.000

P1 &P2 2 2 4.000 26.63 426.080

P1 &P2 2 1 9.4230 26.63 501.869

TOTAL QTY 6005.828


A2
A2
SCHEDULE - B1
ITEM NO:-1 Earth work filling in embankment,guide bund,around buried type
abutments,bridges gaps,trolley refuges,rain bunds,if provided,platforms etc..
Soil
S.no Chainage Area M.Area Dist Qty Remarks
111.960 637.325 - -
111.980 754.623 695.974 20.000 13919.480
112.000 699.318 726.971 20.000 14539.410
112.020 729.118 714.218 20.000 14284.355 BRG NO 296 A-1
112.040 1032.186 880.652 20.000 17613.035 SIDE

112.060 793.319 912.752 20.000 18255.048


112.080 789.542 791.430 20.000 15828.608
112.100 651.645 720.594 20.000 14411.870
112.120 510.240 580.943 20.000 11618.850
1 112.140 345.920 428.080 20.000 8561.600
River Face

Total 129032.256
Chainage Area M.Area Dist Qty Remarks
112.170 159.250 - -
River Face
112.180 498.450 328.850 10.000 3288.500
112.200 672.715 585.583 20.000 11711.650
112.220 692.476 682.596 20.000 13651.910 BRG NO 296 A-2
112.240 398.015 545.246 20.000 10904.910 SIDE

112.260 328.432 363.224 20.000 7264.470


Total 46821.440

Soil
S.no Chainage Area M.Area Dist Qty Remarks
113.710 106.889 - - - BRG NO 303 A-1
113.730 171.875 139.382 20.000 2787.640 SIDE

113.740 151.200 129.045 10.000 1290.445


River Face
113.745 102.452 137.164 5.000 685.818
Total 4763.903
Chainage Area M.Area Dist Qty Remarks
2 113.790 0.000 - - -
River Face
113.800 493.005 246.503 10.000 2465.025
113.820 421.470 457.238 20.000 9144.750
113.840 308.314 364.892 20.000 7297.836 BRG NO 303 A-2
113.860 147.414 227.864 20.000 4557.276 SIDE

113.880 11.994 79.704 20.000 1594.080


Total 25058.967

Soil
S.no Chainage Area M.Area Dist Qty Remarks
115.450 5.225 - - -
115.460 59.811 32.518 10.000 325.180
BRG NO 309 A-1
115.480 122.500 91.156 20.000 1823.110
SIDE
BRG NO 309 A-1
SIDE
115.500 305.142 213.821 20.000 4276.420
115.510 305.421 305.282 10.000 3052.815
115.520 245.960 275.691 10.000 2756.905
River Face
115.530 146.145 196.053 10.000 1960.525
3 Total 14194.955
Chainage Area M.Area Dist Qty Remarks
115.550 0.000 0.000
River Face
115.560 246.000 123.000 10.000 1230.000
115.580 321.250 283.625 20.000 5672.500
BRG NO 309 A-2
115.600 205.415 263.333 20.000 5266.650
SIDE
115.610 168.450 186.933 10.000 1869.325
Total 14038.475

Soil
S.no Chainage Area M.Area Dist Qty Remarks
116.320 0.000 - - -
116.330 101.284 50.642 10.000 506.420
BRG NO 312 A-1
116.340 187.381 144.333 10.000 1443.325
SIDE
116.350 261.781 224.581 10.000 2245.810
116.360 100.950 181.366 10.000 1813.655
116.380 92.450 96.700 20.000 1934.000 River Face
Total 7943.210 Cum
Chainage Area M.Area Dist Qty Remarks
116.382 0.000
4 116.390 120.354 60.177 8.000 481.416
River Face

116.400 204.450 162.402 10.000 1624.020


116.410 279.265 241.858 10.000 2418.575
BRG NO 312 A-2
116.420 311.948 295.606 10.000 2956.065
SIDE
116.430 147.823 229.885 10.000 2298.855
116.440 120.532 134.178 10.000 1341.776
116.450 84.170 102.351 10.000 1023.512
116.460 84.171 84.170 10.000 841.704
Total 12985.922 Cum

Soil
S.no Chainage Area M.Area Dist Qty Remarks
BRG NO 314 A-1
116.750 97.176 - - -
SIDE
116.760 128.563 112.870 10.000 1128.695
River Face
116.767 0.000 64.282 7.000 449.970
Total 1578.665
Chainage Area M.Area Dist Qty Remarks
116.780 44.410 - - -
5 116.790 220.480 132.445 10.000 1324.450
River Face

116.800 277.250 248.865 10.000 2488.650


116.810 153.880 215.565 10.000 2155.650
BRG NO 314 A-2
116.820 113.140 133.510 10.000 1335.100
SIDE
5

BRG NO 314 A-2


SIDE
116.830 122.750 117.945 10.000 1179.450
116.840 108.520 115.635 10.000 1156.348
Total 9639.648 Cum

Soil
S.no Chainage Area M.Area Dist Qty Remarks
115.450 45.256 - - -
115.470 59.811 52.534 20.000 1050.670 BRG NO 327 A-1
115.490 121.988 90.900 20.000 1817.990 SIDE

115.510 304.006 212.997 20.000 4259.940


115.520 210.250 257.128 10.000 2571.280
River Face
115.530 145.200 177.725 10.000 1777.250
Total 11477.130
6 Chainage Area M.Area Dist Qty Remarks
115.555 105.240 - - -
River Face
115.560 241.050 173.145 5.000 865.725
115.570 262.773 251.912 10.000 2519.115
BRG NO 314 A-2
115.590 179.213 220.993 20.000 4419.860
SIDE
115.610 1.448 90.331 20.000 1806.610
Total 9611.310 Cum

Soil
S.no Chainage Area M.Area Dist Qty Remarks
122.450 0.000 - - -
122.460 27.048 13.524 10.000 135.240
122.470 72.544 49.796 10.000 497.960
BRG NO 330 A-1
122.480 105.731 89.138 10.000 891.375
SIDE
122.490 158.049 131.890 10.000 1318.900
122.500 143.949 150.999 10.000 1509.990
122.514 143.949 143.949 14.000 2015.286
122.520 116.469 130.209 6.000 781.254
RIVER FACE
122.530 27.932 72.201 10.000 722.005
Total 7872.010 Cum
7 Chainage Area M.Area Dist Qty Remarks
122.570 24.215 -
RIVER FACE
122.580 180.806 102.511 10.000 1025.105
122.590 361.107 270.957 10.000 2709.565
122.600 312.965 337.036 10.000 3370.360
122.610 371.165 342.065 10.000 3420.650 BRG NO 330 A2
122.620 330.139 350.652 10.000 3506.520 SIDE

122.630 245.010 287.575 10.000 2875.745


122.640 161.757 203.384 10.000 2033.835
Total 18941.780 Cum

Soil
S.no Chainage Area M.Area Dist Qty Remarks
123.920 0.000 - - -

BRG NO 334 A-1


SIDE
123.940 252.640 126.320 20.000 2526.400
BRG NO 334 A-1
123.950 352.643 302.642 10.000 3026.415
SIDE
123.960 442.636 397.640 10.000 3976.395
123.970 561.748 502.192 10.000 5021.920
123.980 425.427 493.588 10.000 4935.875
RIVER FACE
8 123.987 0.000 212.714 7.000 1488.994
Total 20976.000 Cum
Chainage Area M.Area Dist Qty Remarks
124.050 21.416 - RIVER FACE
BRG NO 334 A2
124.060 161.815 91.616 10.000 916.155
SIDE
124.070 163.183 162.499 10.000 1624.990
124.080 18.433 90.808 10.000 908.080
Total 3449.225 Cum

Soil
S.no Chainage Area M.Area Dist Qty Remarks
126.640 54.250 - - -
BRG NO 346 A-1
126.660 195.240 124.745 20.000 2494.900
SIDE
126.680 220.000 207.620 20.000 4152.400
126.695 172.580 196.290 15.000 2944.350 River Face
Total 9591.650 Cum
9 Chainage Area M.Area Dist Qty Remarks
126.710 145.245 - River Face
126.720 287.943 216.594 10.000 2165.940
BRG NO 346 A2
126.740 145.250 216.597 20.000 4331.930
SIDE
126.760 34.250 89.750 20.000 1795.000
Total 8292.870 Cum

Soil
S.no Chainage Area M.Area Dist Qty Remarks
127.280 20.120 - - -
127.300 35.065 27.593 20.000 551.850 BRG NO 351 A-1
127.320 249.729 142.397 20.000 2847.940 SIDE

127.340 424.781 337.255 20.000 6745.100


127.360 324.142 374.462 20.000 7489.230
127.370 250.358 287.250 10.000 2872.500 RIVER FACE
127.375 100.250 175.304 5.000 876.520
Total 21383.140 Cum
Chainage Area M.Area Dist Qty Remarks
10 127.455 35.210 -
127.460 100.925 68.068 5.000 340.337 RIVER FACE
127.480 296.450 198.688 20.000 3973.750
127.500 356.081 326.266 20.000 6525.310
127.520 277.427 316.754 20.000 6335.080
BRG NO 351 A2
127.540 107.928 192.678 20.000 3853.550
SIDE
127.560 82.012 94.970 20.000 1899.400
BRG NO 351 A2
SIDE

127.570 7.568 44.790 10.000 447.900


Total 23375.328 Cum

S.no
S.no Chainage Area M.Area Dist Qty Remarks
129.760 104.358 - - -
129.780 165.091 134.724 20.000 2694.489
129.800 225.078 195.084 20.000 3901.689 BRG NO 360 A-1
129.820 251.482 238.280 20.000 4765.600 SIDE

129.830 251.564 251.523 10.000 2515.232


129.838 251.564 251.564 8.000 2012.515
129.840 184.808 218.186 2.000 436.372
129.850 108.743 146.776 10.000 1467.755 River Face
129.860 0.000 54.372 10.000 543.716
Total 18337.369 Cum
11
Chainage Area M.Area Dist Qty Remarks
129.880 0.000
River Face
129.890 312.544 156.272 10.000 1562.720
129.900 382.338 347.441 10.000 3474.410
129.910 419.649 400.994 10.000 4009.935 BRG NO 360 A2 BRG
129.920 382.085 400.867 10.000 4008.668 NO 361 A1 SIDE

129.940 386.056 384.071 20.000 7681.410


129.950 348.939 367.498 10.000 3674.977
River Face
129.960 0.000 174.470 10.000 1744.695
Total 26156.815 Cum

S.no Chainage Area M.Area Dist Qty Remarks


129.970 0.000 - - -
River Face
129.980 114.448 57.224 10.000 572.240
129.990 190.588 152.518 10.000 1525.181
130.000 180.709 185.649 10.000 1856.486
130.020 180.506 180.608 20.000 3612.150
130.040 143.034 161.770 20.000 3235.400
130.050 136.868 139.951 10.000 1399.510
130.060 107.196 122.032 10.000 1220.322
130.070 67.096 87.146 10.000 871.462
12 130.080 44.917 56.007 10.000 560.066
BRG NO 361 A2 TO
BRG NO 362 A1
130.100 43.320 44.119 20.000 882.373
130.120 48.092 45.706 20.000 914.122
130.130 52.109 50.101 10.000 501.005
130.140 82.123 67.116 10.000 671.160
130.160 117.031 99.577 20.000 1991.541
130.180 115.029 116.030 20.000 2320.600
130.190 114.120 114.575 10.000 1145.747
Total 23279.365 Cum

S.no Chainage Area M.Area Dist Qty Remarks


130.230 0.000
River Face
130.240 277.489 138.744 10.000 1387.444
130.245 305.962 291.725 5.000 1458.627
130.250 382.770 344.366 5.000 1721.829
13 BRG NO 362 A2
130.260 405.137 393.953 10.000 3939.534
SIDE
130.280 217.166 311.152 20.000 6223.033
130.290 96.876 157.021 10.000 1570.211
Total 16300.678 Cum

Grand Qty 485102.110 Cum


SCHEDULE - B2
Providind and laying cement concrete up to plinth in retaining walls,walls (any thickness)including attached
plasters,columns…..
Item No : 1 1:2:4(1Cement:2sand:2graded stone aggregate 20mm nominal size)(PCC)
SL ITEM LENGTH WIDTH HEIGHT QUANTITY
NO DESCRIPTION NO (M) (M) (M) (M3) REMARKS
SCH-B2(1)
BRIDGE-362
1 A1 PILE CAP 1 8.900 8.900 0.100 7.921
2 A2 1 11.200 11.050 0.100 12.376
3 P1 1 18.200 11.700 0.100 21.294
4 P2 1 18.200 11.700 0.100 21.294
5 P3 1 13.200 9.700 0.100 12.804
6 P3/BRWALL 1 12.4 8.9 0.1 11.036
P3/BRWALL -1 3.000 2.000 0.100 -0.600
P3/BRWALL -1 3.141 1.000 0.100 -0.314
7 RWALL PCC-60RM 1 60.000 4.600 0.100 27.600 113.411
BRIDGE-361
8 A1 1 12.400 9.200 0.100 11.408
24.720
9 A2 1 12.500 10.650 0.100 13.312
10 BRIDGE-360
11 A1 1 14.700 10.050 0.100 14.773
12 A2 1 14.700 10.050 0.100 14.773 29.546
BRIDGE-346
A1 1 11.700 9.050 0.100 10.588
A2 1 11.700 9.050 0.100 10.588
42.118
P1 1 11.700 8.950 0.100 10.471
P2 1 11.700 8.950 0.100 10.471
BRIDGE-334
A1 1 14.900 9.200 0.100 13.708
A2 1 14.700 10.050 0.100 14.773 28.481
BRIDGE-330
A1 1 14.700 10.050 0.100 14.773
A2 1 14.700 10.050 0.100 14.773
P1 1 16.200 13.200 0.100 21.384
P1/BRWALL 1 15.400 12.400 0.100 19.096 92.336
-1 3.141 1.562 0.100 -0.490
-1 4.000 2.500 0.100 -1.000
RWALL PCC-77RM(40) 1 70.000 3.400 0.100 23.800
BRIDGE-327
A1PILE CAP 1 12.500 8.900 0.100 11.125
A2 1 12.500 8.900 0.100 11.125
54.458
P1 1 13.200 12.200 0.100 16.104
P2 1 13.200 12.200 0.100 16.104
BRIDGE-314
A1 1 12.500 10.650 0.100 13.313
A2 1 13.200 10.050 0.100 13.266
P1 1 13.200 9.700 0.100 12.804
P2 1 13.200 9.700 0.100 12.804
140.03
P1 &P2 INBETWEEN PCC 1 13.000 4.000 1.300 67.600
P3/BRWALL 2 12.4 8.9 0.1 22.072
P3/BRWALL -2 3.000 2.000 0.100 -1.200
P3/BRWALL -2 3.141 1.000 0.100 -0.628
BRIDGE-312
A1 1 14.700 10.050 0.100 14.773
A2 1 14.700 10.050 0.100 14.773 29.546
BRIDGE-303
A1 1 14.700 10.050 0.100 14.773
A2 1 14.900 9.200 0.100 13.708
P2 BRWALL 1 18.900 16.400 0.100 30.996 57.570
-1 4.000 3.000 0.100 -1.200
-1 3.141 2.250 0.100 -0.707
BRIDGE-296
A1 1 14.900 9.200 0.100 13.708
A2 1 14.900 9.200 0.100 13.708
P1 1 18.200 17.200 0.100 31.304
P2 1 18.200 17.200 0.100 31.3040 90.024
BRIDGE-309 0.0000
A1 1 8.450 15.550 0.100 13.1398
A2 1 11.200 15.550 0.100 17.4160
P1GAD 1 15.200 17.450 0.100 26.5240
P2GAD 1 15.200 17.450 0.100 26.5240
BRIDGE-351 0.0000
A1 1 12.400 8.800 0.100 10.9120
A2 1 12.400 8.800 0.100 10.9120
P1 1 12.400 8.800 0.100 10.9120
P2 1 12.400 8.800 0.100 10.9120
P3 1 12.400 8.800 0.100 10.9120
P4 1 12.400 8.800 0.100 10.9120
TOTAL QTY 851.316
SCHEDULE - B6
Item No : 31 Earth Work Excavation (All Kinds of Soils)
Length Breadth Height Quntity
S.No Description No's (m) (m) (m) (m3) Remarks
Br.No:296
1 Abutment-1 1 19.318 13.517 2.673 697.9775
2 Abutment-2 1 19.260 13.560 7.120 1859.4991
Br.No:312 0.0000
1 Abutment-1 1 20.295 15.645 2.611 829.0324
2 Abutment-2 1 18.265 13.615 5.531 1375.4379
Br.No:314
1 Abutment-1 1 19.413 17.563 5.470 1864.9993
2 Pier-1 1 17.983 14.483 2.455 639.3993
3 Pier-2 1 16.047 12.547 4.095 824.4943
SCHEDULE - B6
Item No : 32 Ordinary rock
Length Breadth Height Quntity
S.No Description No's (m) (m) (m) (m3)
Br.No:296
1 Abutment-1 1 17.0415 11.3415 2.283 441.217
Total 441.217
Remarks

Up To Date Qty.
SCHEDULE - B6-
Item No : 33 Hard rock (requiring blasting )
Length Breadth Height Quntity
S.No Description No's (m) (m) (m) (m3)
Br.No:330 (122/550.300)
1 Pier-1 1 15.294 18.294 2.188 612.177
Total 612.177
600.000
12.177
Remarks

Up To Date Qty.
Paid Upto 7th AC Bill
Payble Qty.
SCHEDULE - B6-1
Item No : 34 Hard rock (Blasting prohibited )
Length Breadth Height Quntity
S.No Description No's (m) (m) (m) (m3)
Br.No:296 (112/153.640)
1 Abutment-1 1 16.841 11.141 2.283 428.349
Br.No:312 (116/383.790)
1 Abutment-1 1 17.245 12.595 3.491 758.248
Br.No:314 (116.773.570)
1 Abutment-1 1 14.989 13.139 3.378 665.265
2 Pier-1 1 15.339 11.878 2.756 502.134
Br.No:327 (120/339.423)
1 Pier-2 1 15.014 16.014 4.028 968.469
Br.No:330 (122/550.300)
1 Abutment-1 1 17.179 12.529 2.958 636.667
Br.No:334 (124/030.380)
1 Abutment-1 1 16.359 10.659 1.319 229.995
2 Abutment-2 1 16.975 12.325 2.551 533.712
Br.No:346 (126/712.700)
1 Abutment-1 1 15.001 12.350 5.003 926.868
2 Pier-1 1 16.090 12.840 7.180 1483.356
3 Pier-2
4 Abutment-2
Br.No:362 (130/232.790)
1 Abutment-1
2 Pier-1
3 Pier-2
Total 7133.063
5940.000
1193.063
Remarks

Up To Date Qty.
Paid Upto 7th AC Bill
Payble Qty.
SCHEDULE - B6
Item No : 35 Providing and laying in postion machine mixed,machine vibrated and machine
batched Design Mix cement concrete M-30/35/40 etc, in RCC raft foundation & pile cap etc,
SL ITEM LENGTH WIDTH HEIGHT QUANTITY
DESCRIPTION GRADE REMARKS
NO NO (M) (M) (M) (M3)
362-RAFT
A1 1 8.700 8.700 1.800 136.242
A2 1 11.00 10.85 1.50 179.025
P1 1 18.00 11.50 2.25 465.750
P2 1 18.00 11.50 2.25 465.750
P3 1 13.000 9.500 1.800 222.300 B6-35
P3 -1 13.000 1.450 0.500 -9.425 B6-35
A2 RWALL 1 60.000 4.400 0.600 158.400
A2 RWALL 1 60.000 0.500 0.600 18.000 1636.042
361-RAFTS
A1 1 12.200 9.000 2.000 219.600
A2 1 12.300 10.450 2.100 269.924 489.524
360-RAFTS
A1 1 14.500 9.850 2.200 314.215
A2 1 14.500 9.850 2.200 314.215 628.430
346-RAFTS 0.000
A1 1 11.500 8.850 2.000 203.550
A2 1 11.500 8.850 2.000 203.550
P1 1 11.500 8.750 1.800 181.125
P2 1 11.500 8.750 1.800 181.125 769.350
334-RAFTS
A1 1 14.700 9.000 2.200 291.060
A2 1 14.500 9.850 2.200 314.215 605.275
330-RAFTS
A1 1 14.500 9.850 2.200 314.215
A2 1 14.500 9.850 2.200 314.215
P1 1 16.000 13.000 2.000 416.000
P1 -1 16.000 2.750 0.750 -33.000
A2 RWALL 1 76.000 3.200 0.500 121.600
A2 RWALL 1 76.000 0.500 0.500 19.000 1152.030
327-RAFTS
A1 1 8.700 12.300 1.800 192.618
A2 1 8.700 12.300 1.800 192.618
P1 1 12.000 13.000 1.800 280.800
P1 -1 13.000 2.450 0.600 -19.110
P2 1 12.000 13.000 1.800 280.800
P2 -1 13.000 2.450 0.600 -19.110 908.616
314-RAFTS
A1 1 12.300 10.450 2.100 269.924
A2 1 13.000 9.850 2.000 256.100
P1 1 13.000 9.500 1.800 222.300
P1 -1 13.000 1.450 0.500 -9.425
P2 1 13.000 9.500 1.800 222.300
P2 -1 13.000 1.450 0.500 -9.425 951.774
312-RAFTS 0.000
A1 1 14.500 9.850 2.200 314.215
A2 1 14.500 9.850 2.200 314.215 628.430
303-RAFTS
A1 1 14.500 9.850 2.200 314.215
A2 1 14.700 9.000 2.200 291.060
P2 1 19.500 17.000 1.500 497.250
P2 0.2667 331.500 112.500 193.116 169.898 1272.423
296-RAFTS
A1 1 14.700 9.000 2.200 291.060
A2 1 14.700 9.000 2.200 291.060 582.120

296-RAFTS
P1GAD 1 17.000 18.000 2.000 612.000
P1GAD 0.333 306 60.9 136.512 167.804
P2 GAD 1 17.000 18.000 2.000 612.000
P2 GAD 0.333 306 60.9 136.512 167.804 1559.608
309-RAFTS
A1 1 8.250 15.350 1.500 189.956
A2 1 11.000 15.350 1.500 253.275
P1GAD 1 15.000 17.250 2.200 569.250
P2GAD 1 15.000 17.250 2.200 569.250 1581.731
351-RAFTS 0.000
A1 1 12.400 8.800 1.800 196.416 1178.496
A2 1 12.400 8.800 1.800 196.416
P1 1 12.400 8.800 1.800 196.416
P2 1 12.400 8.800 1.800 196.416
P3 1 12.400 8.800 1.800 196.416
P4 1 12.400 8.800 1.800 196.416
TOTAL QTY 13943.848 13943.848
B6-36
SCH-B6(37)
Item No : 37 ABUTMENT & PIER
SL LENGTH WIDTH HEIGHT QUANTITY
NO DESCRIPTION NOS NOS (M) (M) (M) (M3) GRADE REMARKS

BRIDGE-362
A1 1 1 7.850 1.400 4.563 50.147

A2 1 1 7.850 1.400 7.600 83.524

P1 1 1 3.700 2.500 13.650 126.263

P1 2 0.5 3.141 1.562 13.650 66.970

P2 1 1 3.700 2.500 13.116 121.323

P2 2 0.5 3.141 1.562 13.116 64.350

P3 1 1 3.000 2.000 11.600 69.600

P3 2 0.5 3.141 1.000 11.600 36.436 618.613


BRIDGE-361
A1 1 2 3.150 1.300 14.510 118.837

A1 1 1 4.176 1.100 0.800 3.674

A1 1 1 3.252 1.100 0.800 2.862

A1 1 1 2.326 1.100 0.800 2.047

A2 1 1 7.850 1.500 8.990 105.857 233.277


BRIDGE-360
A1 1 1 7.850 1.600 9.900 124.344

A2 1 1 7.850 1.600 9.900 124.344 248.688


BRIDGE-346 0.000

A1 1 1 7.850 1.650 10.800 139.887

A2 1 1 7.850 1.650 10.800 139.887

P1 1 1 4.000 2.500 14.360 143.600

P1 2 0.5 3.141 1.562 14.360 70.454

P2 1 1 4.000 2.500 14.360 143.600

P2 2 0.5 3.141 1.562 14.360 70.454 707.881


BRIDGE-334 0.000

A1 1 2 3.450 1.300 12.300 110.331

A1 1 1 4.580 1.100 0.800 4.030

A1 1 1 3.581 1.100 0.800 3.151

A1 1 1 2.581 1.100 0.800 2.271

A2 1 1 7.850 1.600 7.230 90.809 210.593


BRIDGE-330 0.000

A1 1 1 7.850 1.600 9.820 123.339

A2 1 1 7.850 1.600 7.910 99.350

P1 1 1 4.000 2.500 12.500 125.000

P1 2 0.5 3.141 1.562 12.500 61.328 409.017


BRIDGE-327
A1 1 1 7.850 1.600 7.328 92.040
A2 1 1 7.850 1.600 7.328 92.040

P1 1 1 3.700 2.500 12.000 111.000

P1 2 0.5 3.141 1.562 12.000 58.875

P2 1 1 3.700 2.500 12.000 111.000

P2 2 0.5 3.141 1.562 12.000 58.875 523.829


BRIDGE-314
A1 1 1 7.850 1.500 6.600 77.715

A2 1 1 7.850 1.550 9.500 115.591

P1 1 1 3.000 2.000 10.500 63.000

P1 2 0.5 3.141 1.000 10.500 32.981

P2 1 1 3.000 2.000 10.500 63.000

P2 2 0.5 3.141 1.000 10.500 32.981 385.267


BRIDGE-312 0.000

A1 1 1 7.850 1.600 10.249 128.727

A2 1 1 7.850 1.600 9.840 123.590

P1 1 1 3.750 2.500 16.180 151.688

P1 2 0.5 3.141 1.562 16.180 79.383 483.388


BRIDGE-303 0.000

A1 1 1 7.850 1.600 9.667 121.418

A2 1 2 3.450 1.300 12.750 114.368

A2 1 1 4.578 1.100 0.800 4.029

A2 1 1 3.581 1.100 0.800 3.151

A2 1 1 2.584 1.100 0.800 2.274

P2 1 1 4.000 3.000 19.676 236.112

P2 2 0.5 3.141 2.250 19.676 139.055 620.406


BRIDGE-296 0.000

A1 1 2 3.450 1.300 12.200 109.434

1 1 4.583 1.100 0.800 4.033

1 1 3.581 1.100 0.800 3.151

1 1 2.588 1.100 0.800 2.277

A2 1 2 3.450 1.300 15.400 138.138

1 1 4.556 1.100 0.800 4.009

1 1 3.561 1.100 0.800 3.133

1 1 2.562 1.100 0.800 2.254

P1-GAD 1 1 4.000 3.000 24.740 296.880

P1-GAD 1 1 3.141 2.250 24.740 174.844

P2-GAD 1 1 4.000 3.000 26.630 319.560

P2-GAD 1 1 3.141 2.250 26.630 188.201 1245.913


BRIDGE-309
A1-GAD 1 1 14.350 1.500 9.200 198.030

A2-GAD 1 1 14.350 1.500 3.500 75.338


P1-GAD 1 2 3.141 2.250 16.000 226.152
P2-GAD 1 2 3.141 2.250 22.100 312.372 811.892
BRIDGE-351 0.000
A1-GAD 1 1 7.850 1.300 8.667 88.447
A2-GAD 1 1 7.850 1.300 8.667 88.447
P1-GAD 1 1 4.000 3.000 14.610 175.320
P1-GAD 2 0.5 3.141 2.250 14.610 103.253
P2-GAD 1 1 4.000 3.000 20.910 250.920
P2-GAD 2 0.5 3.141 2.250 20.910 147.776
P3-GAD 1 1 4.000 3.000 20.910 250.920
P3-GAD 2 0.5 3.141 2.250 20.910 147.776
P4-GAD 1 1 4.000 3.000 18.400 220.800
P4-GAD 2 0.5 3.141 2.250 18.400 130.037
P5-GAD 1 1 4.000 3.000 7.300 87.600
P5-GAD 2 0.5 3.141 2.250 7.300 51.591 1742.887
TOTAL QTY 8241.652 8241.652
SCHEDULE - B6
Item No : 38 Wingwall & Return wall concrete
SL DESCRIPTION ITEM NOS LENGTH WIDTH HEIGHT QUANTITY GRADE REMARKS
NO NO (M) (M) (M) (M3)
BRIDGE-362
P3/BOULDER RWALL 1 2 13.000 0.300 2.500 19.500

P3/BOULDER RWALL 1 2 8.900 0.300 2.000 10.680

P3/BOULDER RWALL 4 0.5 1.150 0.300 0.500 0.345

A2 RWALL 1 1 60.000 0.450 5.150 139.050

A1 RWALL 1 2 4.450 0.500 7.231 32.178

BRIDGE-330 0.000

P1/BOULDER RWALL 1 2 16.000 0.300 2.750 26.400

P1/BOULDER RWALL 1 2 12.400 0.300 2.000 14.880

P1/BOULDER RWALL 4 0.5 2.450 0.300 0.750 1.103

A2 RWALL 1 1 77.000 0.375 4.250 122.719

BRIDGE-314 0.000

P1/BOULDER RWALL 1 2 13.000 0.300 2.500 19.500

P1/BOULDER RWALL 1 2 8.900 0.300 2.000 10.680

P1/BOULDER RWALL 4 0.5 1.150 0.300 0.500 0.345

P2/BOULDER RWALL 1 2 13.000 0.300 2.500 19.500

P2/BOULDER RWALL 1 2 8.900 0.300 2.000 10.680

P2/BOULDER RWALL 4 0.5 1.150 0.300 0.500 0.345

BRIDGE-303
P2/BOULDER RWALL 1 2 19.500 0.300 2.800 32.760

P2/BOULDER RWALL 1 2 16.400 0.300 2.800 27.552

TOTAL QTY 488.216


SCHEDULE - B6
Item No : 39 Abutment Cap,Pier Cap,Inspection Platform & Pedestal Over Pier Cap, Fender wall, Diphram wall
SL LENGTH WIDTH HEIGHT QUANTIT
NO DESCRIPTION NOS NOS (M) (M) (M) Y (M3) GRADE

BRIDGE-362
A1 CAP 1 1 7.850 1.300 1.000 10.2050
A1 INSPECTION PLATFORM 1 1 7.850 1.200 0.200 1.8840
A1 PEDESTALS 1 2 1.130 0.465 0.300 0.3153
OHE MAST 2 1 0.900 0.900 2.058 3.3340
OHE MAST -2 1 3.141 0.0625 1.400 -0.5497
A2 CAP 1 1 8.100 1.300 1.000 10.5300
A2 INSPECTION PLATFORM 1 1 8.100 1.200 0.200 1.9440
A2 PEDESTALS 1 2 1.130 0.465 0.300 0.3153
A2 FLYWING WALL 2 1 3.000 0.350 1.000 2.1000
A2 FLYWING WALL 2 0.5 3.000 0.350 1.818 1.9089
HANUCH 2 0.5 0.300 0.300 2.818 0.2536
OHE MAST 2 1 0.900 0.900 2.058 3.3340
OHE MAST -2 1 3.141 0.0625 1.400 -0.5497
P1 CAP & P2 CAP 2 1 8.100 2.9000 0.900 42.2820
P1 CAP & P2 CAP 2 1 7.350 2.9000 0.300 12.7890
P1 CAP & P2 CAP 2 1 8.100 1.4500 0.464 10.8994
P1 IP & P2 IP 2 2 10.500 1.2000 0.200 10.0800
P1 IP & P2 IP 2 2 2.900 1.2000 0.200 2.7840
P1 PEDESTALS & P2 PEDESTALS 2 2 1.255 0.5400 0.300 0.8132
P1 PEDESTALS & P2 PEDESTALS 2 2 1.130 0.4500 0.300 0.6102
OHE MAST 2 2 0.900 0.900 2.058 6.6679
OHE MAST -2 2 3.141 0.0625 1.400 -1.0994
P3 CAP 1 1 8.100 2.400 1.000 19.4400
P3 CAP 1 1 6.750 2.400 0.200 3.2400
P3 IP 1 2 10.500 1.200 0.200 5.0400
P3 IP 1 2 2.400 1.200 0.200 1.1520
P3 PEDESTALS 1 2 1.130 0.900 0.300 0.6102
P3 OHE MAST 1 2 0.900 0.900 2.058 3.3340
P3 OHE MAST -1 2 0.500 0.500 1.400 -0.7000
BRIDGE-361
A1 CAP 1 1 8.100 1.300 1.500 15.7950
A1 INSPECTION PLATFORM 1 1 8.100 1.200 0.200 1.9440
A1 PEDESTALS 1 2 1.130 0.465 0.300 0.3153
A1 FLYWING WALL 2 1 3.000 0.350 1.000 2.1000
A1 FLYWING WALL 2 0.5 3.000 0.350 1.818 1.9089
HANUCH 2 0.5 0.300 0.3000 3.318 0.2986
OHE MAST 2 1 0.900 0.900 2.058 3.3340
OHE MAST -2 1 3.141 0.0625 1.400 -0.5497
A2 CAP 1 1 8.100 1.300 1.000 10.5300
A2 INSPECTION PLATFORM 1 1 8.100 1.200 0.200 1.9440
A2 PEDESTALS 1 2 1.130 0.465 0.300 0.3153
A2 FLYWING WALL 2 1 3.000 0.350 1.000 2.1000
A2 FLYWING WALL 2 0.5 3.000 0.350 1.818 1.9089
HANUCH 2 0.5 0.300 0.3000 2.818 0.2536
OHE MAST 2 1 0.900 0.900 2.058 3.3340
OHE MAST -2 1 3.141 0.0625 1.400 -0.5497
BRIDGE-360
A1 CAP 1 1 8.100 1.300 1.000 10.5300
A1 INSPECTION PLATFORM 1 1 8.100 1.200 0.200 1.9440
A1 PEDESTALS 1 2 1.255 0.560 0.300 0.4217
A1 FLYWING WALL 2 1 3.000 0.400 1.000 2.4000
A1 FLYWING WALL 2 0.5 3.000 0.400 2.282 2.7384
HANUCH 2 0.5 0.300 0.3000 3.282 0.2954
OHE MAST 2 1 0.900 0.900 2.522 4.0856
OHE MAST -2 1 3.141 0.0625 1.400 -0.5497
A2 CAP 1 1 8.100 1.300 1.000 10.5300
A2 INSPECTION PLATFORM 1 1 8.100 1.200 0.200 1.9440
A2 PEDESTALS 1 2 1.255 0.560 0.300 0.4217
A2 FLYWING WALL 2 1 3.000 0.400 1.000 2.4000
A2 FLYWING WALL 2 0.5 3.000 0.400 2.282 2.7384
HANUCH 2 0.5 0.300 0.3000 3.282 0.2954
OHE MAST 2 1 0.900 0.900 2.522 4.0856
OHE MAST -2 1 3.141 0.0625 1.400 -0.5497
P1 CAP 1 1 8.100 2.9000 1.200 28.1880
P1IP 1 2 10.500 1.2000 0.200 5.0400
P1 IP 1 2 2.900 1.2000 0.200 1.3920
P1 PEDESTALS 1 2 1.255 1.090 0.300 0.8208
OHE MAST 1 2 0.900 0.9000 2.522 4.0856
OHE MAST -1 2 3.141 0.0625 1.400 -0.5497
P2 CAP 1 1 8.100 2.9000 1.200 28.1880
P2IP 1 2 10.500 1.2000 0.200 5.0400
P2 IP 1 2 2.900 1.2000 0.200 1.3920
P2 PEDESTALS 1 2 1.255 1.0900 0.300 0.8208
OHE MAST 1 2 0.900 0.9000 2.522 4.0856
OHE MAST -1 2 3.141 0.0625 1.400 -0.5497
BRIDGE-346
A1 CAP 1 1 8.100 1.300 1.000 10.5300
A1 INSPECTION PLATFORM 1 1 8.100 1.200 0.200 1.9440
A1 PEDESTALS 1 2 1.130 0.465 0.300 0.3153
A1 FLYWING WALL 2 1 3.000 0.350 1.000 2.1000
A1 FLYWING WALL 2 0.5 3.000 0.350 1.818 1.9089
HANUCH 2 0.5 0.300 0.3000 2.818 0.2536
OHE MAST 2 1 0.900 0.900 2.058 3.3340
OHE MAST -2 1 3.141 0.0625 1.400 -0.5497
A2 CAP 1 1 8.100 1.300 1.000 10.5300
A2 INSPECTION PLATFORM 1 1 8.100 1.200 0.200 1.9440
A2PEDESTALS 1 2 1.130 0.465 0.300 0.3153
A2 FLYWING WALL 2 1 3.000 0.350 1.000 2.1000
A2FLYWING WALL 2 0.5 3.000 0.350 1.818 1.9089
HANUCH 2 0.5 0.300 0.3000 2.818 0.2536
OHE MAST 2 1 0.900 0.900 2.058 3.3340
OHE MAST -2 1 3.141 0.0625 1.400 -0.5497
P1 CAP 1 1 8.100 2.900 1.200 28.1880
P1IP 1 2 10.500 1.200 0.200 5.0400
P1 IP 1 2 2.900 1.200 0.200 1.3920
P1 PEDESTALS 1 2 1.130 0.900 0.300 0.6102
OHE MAST 1 2 0.900 0.900 2.058 3.3340
OHE MAST -1 2 3.141 0.063 1.400 -0.5497
P2 CAP 1 1 8.100 2.900 1.200 28.1880
P2IP 1 2 10.500 1.200 0.200 5.0400
P2 IP 1 2 2.900 1.200 0.200 1.3920
P2 PEDESTALS 1 2 1.130 0.900 0.300 0.6102
OHE MAST 1 2 0.900 0.900 2.058 3.3340
OHE MAST -1 2 3.141 0.063 1.400 -0.5497
BRIDGE-334 0.0000

A1 CAP 1 1 8.100 1.450 1.500 17.6175


A1 INSPECTION PLATFORM 1 1 8.100 1.200 0.200 1.9440
A1 PEDESTALS 1 2 1.480 0.820 0.300 0.7282
A1 FLYWING WALL 2 1 3.000 0.400 1.000 2.4000
A1 FLYWING WALL 2 0.5 3.000 0.400 3.949 4.7388
HANUCH 2 0.5 0.300 0.3000 4.949 0.4454
OHE MAST 2 1 0.900 0.900 3.689 5.9762
OHE MAST -2 1 3.141 0.0625 1.400 -0.5497
A2 CAP 1 1 8.100 1.300 1.000 10.5300
A2 INSPECTION PLATFORM 1 1 8.100 1.200 0.200 1.9440
A2 PEDESTALS 1 2 1.255 0.560 0.300 0.4217
A2 FLYWING WALL 2 1 3.000 0.400 1.000 2.4000
A2 FLYWING WALL 2 0.5 3.000 0.400 2.282 2.7384
HANUCH 2 0.5 0.300 0.300 3.282 0.2954
OHE MAST 2 1 0.900 0.900 2.522 4.0856
OHE MAST -2 1 3.141 0.0625 1.400 -0.5497
P1 CAP 1 1 9.100 3.150 1.000 28.6650
P1 CAP 1 1 1325.000 3.150 0.200 834.7500
P1IP 1 2 11.500 1.200 0.200 5.5200
P1 IP 1 2 3.150 1.200 0.200 1.5120
P1 PEDESTALS 1 2 1.480 1.600 0.300 1.4208
OHE MAST 1 1 0.900 0.900 3.689 2.9881
OHE MAST -1 1 3.141 0.0625 1.400 -0.2748
TROLLEY REFUSE
COLUMNS 1 4 0.300 0.300 3.889 1.4000
TIE BEAM 1 2 1.300 0.300 0.300 0.2340
TIE BEAM 1 2 1.600 0.300 0.300 0.2880
SLAB BEAMS 1 2 2.700 0.300 0.175 0.2835
SLAB BEAMS 1 2 3.700 0.300 0.175 0.3885
SLAB 1 1 3.700 2.700 0.125 1.2488
P2 CAP 1 1 8.100 2.650 1.200 25.7580
P2 CAP 1 1 8.100 1.325 1.167 12.5248
P2IP 1 2 10.500 1.200 0.200 5.0400
P2 IP 1 2 2.650 1.200 0.200 1.2720
P2 PEDESTALS 1 2 1.255 0.690 0.300 0.5196
P2 PEDESTALS 1 2 1.480 0.800 0.300 0.7104
OHE MAST 1 2 0.900 0.9000 2.522 4.0856
OHE MAST -1 2 3.141 0.0625 1.400 -0.5497
BRIDGE-330 0.0000

A1 CAP 1 1 8.100 1.300 1.000 10.5300


A1 INSPECTION PLATFORM 1 1 8.100 1.200 0.200 1.9440
A1 PEDESTALS 1 2 1.255 0.560 0.300 0.4217
A1 FLYWING WALL 2 1 3.000 0.400 1.000 2.4000
A1 FLYWING WALL 2 0.5 3.000 0.400 2.282 2.7384
HANUCH 2 0.5 0.300 0.3000 3.282 0.2954
OHE MAST 2 1 0.900 0.900 2.522 4.0856
OHE MAST -2 1 3.141 0.0625 1.400 -0.5497
A2 CAP 1 1 8.100 1.300 1.000 10.5300
A2 INSPECTION PLATFORM 1 1 8.100 1.200 0.200 1.9440
A2 PEDESTALS 1 2 1.255 0.560 0.300 0.4217
A2 FLYWING WALL 2 1 3.000 0.400 1.000 2.4000
A2 FLYWING WALL 2 0.5 3.000 0.400 2.282 2.7384
OHE MAST 2 0.5 0.300 0.3000 3.282 0.2954
OHE MAST 2 1 0.900 0.900 2.522 4.0856
HANUCH -2 1 3.141 0.0625 1.400 -0.5497
P1 CAP 1 1 8.100 2.900 1.200 28.1880
P1 CAP 1 1 8.100 1.450 1.167 13.7064
P1IP 1 2 11.500 1.200 0.200 5.5200
P1 IP 1 2 2.900 1.200 0.200 1.3920
P1 PEDESTALS 1 2 1.480 0.800 0.300 0.7104
P1 PEDESTALS 1 2 1.255 0.690 0.300 0.5196
OHE MAST 1 2 0.900 0.900 2.522 4.0856
OHE MAST -1 2 3.141 0.0625 1.400 -0.5497
P2 CAP 1 1 8.100 2.900 1.200 28.1880
P2 CAP 1 1 8.100 1.450 1.167 13.7064
P2 IP 1 2 10.500 1.200 0.200 5.0400
P2 IP 1 2 2.900 1.200 0.200 1.3920
P2 PEDESTALS 1 2 1.255 0.690 0.300 0.5196
P2 PEDESTALS 1 2 1.480 0.800 0.300 0.7104
OHE MAST 1 2 0.900 0.9000 2.522 4.0856
OHE MAST -1 2 3.141 0.0625 1.400 -0.5497
BRIDGE-327
A1 CAP 1 1 7.850 1.300 1.000 10.2050
A1 INSPECTION PLATFORM 1 1 7.850 1.000 0.200 1.5700
A1 INSPECTION PLATFORM 1 2 2.300 1.000 0.200 0.9200
A1 PEDESTALS 1 2 1.130 0.470 0.300 0.3187
A1 FLYWING WALL 2 1 3.000 0.400 1.000 2.4000
A1 FLYWING WALL 2 0.5 3.000 0.400 1.818 2.1816
HANUCH 2 0.5 0.600 0.6000 2.818 1.0145
OHE MAST 2 1 0.900 0.900 2.058 3.3340
OHE MAST -2 1 3.141 0.0625 1.400 -0.5497
A2 CAP 1 1 7.850 1.300 1.000 10.2050
A2 INSPECTION PLATFORM 1 1 7.850 1.000 0.200 1.5700
A2 INSPECTION PLATFORM 1 2 2.300 1.000 0.200 0.9200
A2 PEDESTALS 1 2 1.130 0.470 0.300 0.3187
A2 FLYWING WALL 2 1 3.000 0.400 1.000 2.4000
A2 FLYWING WALL 2 0.5 3.000 0.400 1.818 2.1816
HANUCH 2 0.5 0.600 0.6000 2.818 1.0145
OHE MAST 2 1 0.900 0.900 2.058 3.3340
OHE MAST -2 1 3.141 0.0625 1.400 -0.5497
P1 CAP 1 1 8.100 2.900 1.000 23.4900
P1 CAP 1 1 7.350 2.900 0.200 4.2630
P1 CAP 1 1 8.100 1.450 0.464 5.4497
P1 IP 1 2 10.500 1.200 0.200 5.0400
P1 IP 1 2 2.900 1.200 0.200 1.3920
P1 PEDESTALS 1 2 1.255 0.545 0.300 0.4104
P1 PEDESTALS 1 2 1.130 0.600 0.300 0.4068
OHE MAST 1 2 0.900 0.900 2.058 3.3340
OHE MAST -1 2 3.141 0.0625 1.400 -0.5497
P2 CAP 1 1 8.100 2.900 1.000 23.4900
P2 CAP 1 1 7.350 2.900 0.200 4.2630
P2 CAP 1 1 8.100 1.450 0.464 5.4497
P2 IP 1 2 10.500 1.200 0.200 5.0400
P2 IP 1 2 2.900 1.200 0.200 1.3920
P2 PEDESTALS 1 2 1.255 0.545 0.300 0.4104
P2 PEDESTALS 1 2 1.130 0.600 0.300 0.4068
OHE MAST 1 2 0.900 0.900 2.058 3.3340
OHE MAST -1 2 3.141 0.0625 1.400 -0.5497
BRIDGE-314
A1 CAP 1 1 8.100 1.300 1.000 10.5300
A1 INSPECTION PLATFORM 1 1 8.100 1.200 0.200 1.9440
A1 PEDESTALS 1 2 1.130 0.465 0.300 0.3153
A1 FLYWING WALL 2 1 3.000 0.350 1.000 2.1000
A1 FLYWING WALL 2 0.5 3.000 0.350 1.818 1.9089
HANUCH 2 0.5 0.300 0.3000 2.818 0.2536
OHE MAST 2 1 0.900 0.900 2.058 3.3340
OHE MAST -2 1 3.141 0.0625 1.400 -0.5497
HANUCH 2 0.5 0.300 0.3000 2.818 0.2536
A2 CAP 1 1 8.100 1.300 1.000 10.5300
A2 INSPECTION PLATFORM 1 1 8.100 1.200 0.200 1.9440
A2 PEDESTALS 1 2 1.130 0.465 0.300 0.3153
A2 FLYWING WALL 2 1 3.000 0.350 1.000 2.1000
A2 FLYWING WALL 2 0.5 3.000 0.350 1.818 1.9089
HANUCH 2 0.5 0.300 0.3000 2.818 0.2536
OHE MAST 2 1 0.900 0.900 2.058 3.3340
OHE MAST -2 1 3.141 0.0625 1.400 -0.5497
P1 CAP 1 1 8.100 2.400 1.000 19.4400
P1 CAP 1 1 6.750 2.400 0.200 3.2400
P1IP 1 2 10.500 1.200 0.200 5.0400
P1 IP 1 2 2.400 1.200 0.200 1.1520
P1 PEDESTALS 1 2 1.130 0.900 0.300 0.6102
OHE MAST 1 2 0.900 0.900 2.058 3.3340
OHE MAST -1 2 3.141 0.0625 1.400 -0.5497
P2 CAP 1 1 8.100 2.400 1.000 19.4400
P2 CAP 1 1 6.750 2.400 0.200 3.2400
P2 IP 1 2 10.500 1.200 0.200 5.0400
P2 IP 1 2 2.400 1.200 0.200 1.1520
P2 PEDESTALS 1 2 1.130 0.900 0.300 0.6102
OHE MAST 1 2 0.900 0.900 2.058 3.3340
OHE MAST -1 2 3.141 0.0625 1.400 -0.5497
BRIDGE-312
A1 CAP 1 1 8.100 1.300 1.000 10.5300
A1 INSPECTION PLATFORM 1 1 8.100 1.200 0.200 1.9440
A1 PEDESTALS 1 2 1.255 0.560 0.300 0.4217
A1 FLYWING WALL 2 1 3.000 0.400 1.000 2.4000
A1 FLYWING WALL 2 0.5 3.000 0.400 2.282 2.7384
OHE MAST 2 1 0.900 0.900 2.522 4.0856
OHE MAST -2 1 3.141 0.0625 1.400 -0.5497
HANUCH 2 0.5 0.300 0.3000 3.282 0.2954
A2 CAP 1 1 8.100 1.300 1.000 10.5300
A2 INSPECTION PLATFORM 1 1 8.100 1.200 0.200 1.9440
A2 PEDESTALS 1 2 1.255 0.560 0.300 0.4217
A2 FLYWING WALL 2 1 3.000 0.350 1.000 2.1000
A2 FLYWING WALL 2 0.5 3.000 0.350 2.282 2.3961
OHE MAST 2 1 0.900 0.900 2.522 4.0856
OHE MAST -2 1 3.141 0.0625 1.400 -0.5497
HANUCH 2 0.5 0.300 0.3000 3.282 0.2954
P1 CAP 1 1 8.100 2.900 1.200 28.1880
P1IP 1 2 10.500 1.200 0.200 5.0400
P1 IP 1 2 2.900 1.200 0.200 1.3920
P1 PEDESTALS 1 2 1.255 1.090 0.300 0.8208
OHE MAST 1 2 0.900 0.900 2.522 4.0856
OHE MAST -1 2 3.141 0.0625 1.400 -0.5497
P2 CAP 1 1 8.100 2.900 1.200 28.1880
P2 IP 1 2 10.500 1.200 0.200 5.0400
P2 IP 1 2 2.900 1.200 0.200 1.3920
P2 PEDESTALS 1 2 1.255 1.090 0.300 0.8208
OHE MAST 1 2 0.900 0.900 2.522 4.0856
OHE MAST -1 2 3.141 0.0625 1.400 -0.5497
BRIDGE-303
A1 CAP 1 1 7.850 1.300 1.000 10.2050
A1 INSPECTION PLATFORM 1 1 7.850 1.000 0.200 1.5700
A1 INSPECTION PLATFORM 1 2 2.300 1.000 0.200 0.9200
A1 PEDESTALS 1 2 1.255 0.560 0.300 0.4217
A1 FLYWING WALL 2 1 3.000 0.400 1.000 2.4000
A1 FLYWING WALL 2 0.5 3.000 0.400 2.282 2.7384
HANUCH 2 0.5 0.350 0.3500 3.282 0.4020
OHE MAST 2 1 0.900 0.900 2.522 4.0856
OHE MAST -2 1 3.141 0.0625 1.400 -0.5497

A2 CAP 1 1 8.100 1.450 1.500 17.6175


A2 INSPECTION PLATFORM 1 1 8.100 1.200 0.200 1.9440
A2 PEDESTALS 1 2 1.480 0.820 0.300 0.7282
A2 FLYWING WALL 2 1 3.000 0.400 1.000 2.4000
A2 FLYWING WALL 2 0.5 3.000 0.400 3.949 4.7388
HANUCH 2 0.5 0.300 0.3000 4.949 0.4454
OHE MAST 2 1 0.900 0.900 3.689 5.9762
OHE MAST -2 1 3.141 0.0625 1.400 -0.5497

P2 CAP 1 1 9.100 3.400 1.200 37.1280


P2IP 1 2 11.500 1.200 0.200 5.5200
P2 IP 1 2 3.400 1.200 0.200 1.6320
P2 PEDESTALS 1 2 1.480 1.600 0.300 1.4208
OHE MAST 1 1 0.900 0.900 3.689 2.9881
OHE MAST -1 1 3.141 0.0625 1.400 -0.2748
TROLLEY REFUSE
COLUMNS 1 4 0.300 0.300 3.889 1.4000
TIE BEAM 1 2 1.300 0.300 0.300 0.2340
TIE BEAM 1 2 1.600 0.300 0.300 0.2880
SLAB BEAMS 1 2 2.700 0.300 0.175 0.2835
SLAB BEAMS 1 2 3.700 0.300 0.175 0.3885
SLAB 1 1 3.700 2.700 0.125 1.2488
BRIDGE-296
A1 CAP 1 1 8.100 1.450 1.500 17.6175
A1 INSPECTION PLATFORM 1 1 8.100 1.200 0.200 1.9440
A1 PEDESTALS 1 2 1.480 0.820 0.300 0.7282
A1 FLYWING WALL 2 1 3.000 0.400 1.000 2.4000
A1 FLYWING WALL 2 0.5 3.000 0.400 3.949 4.7388
HANUCH 2 0.5 0.300 0.3000 4.949 0.4454
OHE MAST 2 1 0.900 0.900 3.689 5.9762
OHE MAST -2 1 3.141 0.0625 1.400 -0.5497
A2 CAP 1 1 8.100 1.450 1.500 17.6175
A2 INSPECTION PLATFORM 1 1 8.100 1.200 0.200 1.9440
A2 PEDESTALS 1 2 1.480 0.820 0.300 0.7282
A2 FLYWING WALL 2 1 3.000 0.400 1.000 2.4000
A2 FLYWING WALL 2 0.5 3.000 0.400 3.949 4.7388
HANUCH 2 0.5 0.300 0.3000 4.949 0.4454
OHE MAST 2 1 0.900 0.900 3.689 5.9762
OHE MAST -2 1 3.141 0.0625 1.400 -0.5497
P1 CAP 1 1 8.100 3.400 1.000 27.5400
P1 CAP 1 1 7.750 3.400 0.200 5.2700
P1IP 1 2 10.500 1.200 0.200 5.0400
P1 IP 1 2 3.400 1.200 0.200 1.6320
P1PEDESTALS 1 2 1.480 1.600 0.300 1.4208
OHE MAST 1 2 0.900 0.900 3.689 5.9762
OHE MAST -1 2 3.141 0.0625 1.400 -0.5497
P2 CAP 1 1 8.100 3.400 1.000 27.5400
P2 CAP 1 1 7.750 3.400 0.200 5.2700
P2IP 1 2 10.500 1.200 0.200 5.0400
P2 IP 1 2 3.400 1.200 0.200 1.6320
P2PEDESTALS 1 2 1.480 1.600 0.300 1.4208
OHE MAST 1 1 0.900 0.900 3.689 2.9881
OHE MAST -1 1 3.141 0.0625 1.400 -0.2748
TROLLEY REFUSE
COLUMNS 1 4 0.300 0.300 3.889 1.4000
TIE BEAM 1 2 1.300 0.300 0.300 0.2340
TIE BEAM 1 2 1.600 0.300 0.300 0.2880
SLAB BEAMS 1 2 2.700 0.300 0.175 0.2835
SLAB BEAMS 1 2 3.700 0.300 0.175 0.3885
SLAB 1 1 3.700 2.700 0.125 1.2488
BRIDGE-351 0.0000
A1 CAP 1 1 7.850 1.300 1.000 10.2050
A1 INSPECTION PLATFORM 1 1 7.850 1.200 0.200 1.8840
A1 INSPECTION PLATFORM 1 1 1.200 2.500 0.200 0.6000
A1 PEDESTALS 1 2 1.255 0.560 0.300 0.4217
A1 FLYWING WALL 2 1 3.000 0.400 1.000 2.4000
A1 FLYWING WALL 2 0.5 3.000 0.400 2.282 2.7384
HANUCH 2 0.5 0.300 0.3000 3.282 0.2954
OHE MAST 2 1 0.900 0.900 2.522 4.0856
OHE MAST -2 1 3.141 0.0625 1.400 -0.5497
A1 CAP 1 1 7.850 1.300 1.000 10.2050
A1 INSPECTION PLATFORM 1 1 7.850 1.200 0.200 1.8840
A1 INSPECTION PLATFORM 1 1 1.200 2.500 0.200 0.6000
A1 PEDESTALS 1 2 1.255 0.560 0.300 0.4217
A1 FLYWING WALL 2 1 3.000 0.400 1.000 2.4000
A1 FLYWING WALL 2 0.5 3.000 0.400 2.282 2.7384
HANUCH 2 0.5 0.300 0.3000 3.282 0.2954
OHE MAST 2 1 0.900 0.900 2.522 4.0856
OHE MAST -2 1 3.141 0.0625 1.400 -0.5497
P1CAP 5 1 8.100 3.4000 1.000 137.7000
P1 TO P5 CAP 5 1 7.750 3.400 0.200 26.3500
P1IP 5 2 10.500 1.200 0.200 25.2000
P1 IP 5 2 3.400 1.200 0.200 8.1600
P1PEDESTALS 5 2 1.480 1.600 0.300 7.1040
OHE MAST 5 2 0.900 0.900 3.689 29.8809
OHE MAST -5 2 3.141 0.0625 1.400 -2.7484
TROLLEY REFUSE
COLUMNS 2 4 0.300 0.300 3.889 2.8001
TIE BEAM 2 2 1.300 0.300 0.300 0.4680
TIE BEAM 2 2 1.600 0.300 0.300 0.5760
SLAB BEAMS 2 2 2.700 0.300 0.175 0.5670
SLAB BEAMS 2 2 3.700 0.300 0.175 0.7770
SLAB 2 1 3.700 2.700 0.125 2.4975
BRIDGE-309
A1 CAP 1 1 14.350 1.500 1.000 21.5250
A1 INSPECTION PLATFORM 1 1 14.350 1.200 0.200 3.4440
A1 INSPECTION PLATFORM 1 1 1.500 1.200 0.200 0.3600
A1 PEDESTALS 1 4 1.360 0.900 0.300 1.4688
A1 FLYWING WALL 2 1 3.000 0.400 1.000 2.4000
A1 FLYWING WALL 2 0.5 3.000 0.400 2.784 3.3408
HANUCH 2 0.5 0.300 0.3000 3.784 0.3406
OHE MAST 2 1 0.900 0.900 3.024 4.8989
OHE MAST -2 1 3.141 0.0625 1.400 -0.5497
A2 CAP 1 1 14.350 1.500 1.000 21.5250
A2 INSPECTION PLATFORM 1 1 14.350 1.200 0.200 3.4440
1 1 1.500 1.200 0.200 0.3600
A2 PEDESTALS 1 4 1.360 0.900 0.300 1.4688
A2 FLYWING WALL 2 1 3.000 0.400 1.000 2.4000
A2 FLYWING WALL 2 0.5 3.000 0.400 2.784 3.3408
HANUCH 2 0.5 0.300 0.3000 3.784 0.3406
OHE MAST 2 1 0.900 0.900 3.024 4.8989
OHE MAST -2 1 3.141 0.0625 1.400 -0.5497
P1 CAP 1 1 14.600 3.400 1.000 49.6400
P1 CAP 1 1 10.900 3.400 0.200 7.4120
P1IP 1 2 17.000 1.200 0.200 8.1600
P1 IP 1 2 3.400 1.200 0.200 1.6320
P1PEDESTALS 1 4 1.360 1.760 0.300 2.8723
OHE MAST 1 1 0.900 0.900 3.024 2.4494
OHE MAST -1 1 3.141 0.0625 1.400 -0.2748
P1 CAP 1 1 14.600 3.400 1.000 49.6400
P1 CAP 1 1 10.900 3.400 0.200 7.4120
P1IP 1 2 17.000 1.200 0.200 8.1600
P1 IP 1 2 3.400 1.200 0.200 1.6320
P1PEDESTALS 1 4 1.360 1.760 0.300 2.8723
OHE MAST 1 1 0.900 0.900 3.024 2.4494
OHE MAST -1 1 3.141 0.0625 1.400 -0.2748
TROLLEY REFUSE
COLUMNS 1 4 0.300 0.300 3.889 1.4000
TIE BEAM 1 2 1.300 0.300 0.300 0.2340
TIE BEAM 1 2 1.600 0.300 0.300 0.2880
SLAB BEAMS 1 2 2.700 0.300 0.175 0.2835
SLAB BEAMS 1 2 3.700 0.300 0.175 0.3885
SLAB 1 1 3.700 2.700 0.125 1.2488
TOTAL QTY 2697.1553 0.000
EDULE - B6
rm & Pedestal Over Pier Cap, Fender wall, Diphram wall etc.

REMARKS
SCHEDULE - B6
Item No : 40 Approach Slab at formation level, Dirt Wall,ballast wall at Formation level
SL DESCRIPTION NOS NOS LENGTH WIDTH HEIGHT QUANTITY
NO (M) (M) (M) (M3)
BRIDGE-362
A1DIRT WALL 1 1 7.850 0.350 1.818 4.995

A2 DIRT WALL 1 1 8.100 0.350 1.818 5.154

SLAB A1-P1 1 1 13.460 4.825 0.220 14.288

HANUCH 1 2 13.460 0.450 0.100 1.211

WEARING COAT 1 1 13.460 4.500 0.025 1.514

CRASH BARRIER 2 1 13.460 0.150 0.820 3.311

SLAB P1-P2 30.156

SLAB P2-P3 20.325

SLAB P3-A2 20.325

BRIDGE-361
A1DIRT WALL 1 1 8.100 0.350 1.818 5.154

A2 DIRT WALL 1 1 8.100 0.350 1.818 5.154

SLAB A1-P1 20.325

SLAB P1-P2 30.157

SLAB P2-A2 20.325

BRIDGE-360
A1DIRT WALL 1 1 8.100 0.350 2.828 8.017

A2 DIRT WALL 1 1 8.100 0.350 2.828 8.017

SLAB A1-P1 1 1 19.840 4.825 0.220 21.060

HANUCH 1 2 19.840 0.500 0.100 1.984

WEARING COAT 1 1 19.840 4.500 0.025 2.232

CRASH BARRIER 2 1 19.840 0.150 0.820 4.881

SLAB P1-P2 30.156

SLAB P2-A2 30.156

BRIDGE-351
A1DIRT WALL 1 1 7.850 0.350 2.828 7.770

A2 DIRT WALL 1 1 7.850 0.350 2.828 7.770

SLAB A1-P1 30.157

SLAB P1-P2 57.334

SLAB P2-P3 57.334

SLAB P3-P4 57.334

SLAB P4-P5 57.334

SLAB P5-A2 30.157

BRIDGE-346
A1DIRT WALL 1 1 8.100 0.350 1.818 5.154

A2 DIRT WALL 1 1 8.100 0.350 1.818 5.154


SLAB A1-P1 20.325

SLAB P1-P2 20.325

SLAB P2-P3 20.325

BRIDGE-334
A1DIRT WALL 1 1 8.100 0.400 3.949 12.795

A2 DIRT WALL 1 1 8.100 0.350 2.828 8.017

SLAB A1-P1 30.157

SLAB P1-P2 57.334

SLAB P2-P3 57.334

BRIDGE-330
A1DIRT WALL 1 1 8.100 0.350 2.828 8.017

A2 DIRT WALL 1 1 8.100 0.350 2.828 8.017

SLAB A1-P1 30.157

SLAB P1-P2 57.334

SLAB P2-P3 30.157

BRIDGE-327
A1DIRT WALL 1 1 7.850 0.350 1.818 4.995

A2 DIRT WALL 1 1 7.850 0.350 1.818 4.995

SLAB A1-P1 20.325

SLAB P1-P2 30.157

SLAB P2-P3 20.325

BRIDGE-314
A1DIRT WALL 1 1 8.100 0.350 1.818 5.154

A2 DIRT WALL 1 1 8.100 0.350 1.818 5.154

SLAB A1-P1 20.325

SLAB P1-P2 20.325

SLAB P2-P3 20.325

BRIDGE-312
A1DIRT WALL 1 1 8.100 0.350 2.828 8.017

A2 DIRT WALL 1 1 8.100 0.350 2.828 8.017

SLAB A1-P1 30.157

SLAB P1-P2 30.157

SLAB P2-P3 30.157

BRIDGE-309
A1DIRT WALL 1 1 14.350 0.400 2.784 15.980

A2 DIRT WALL 1 1 14.350 0.400 2.784 15.980

SLAB A1-P1 45.154

SLAB P1-P2 45.154

SLAB P2-P3 45.154


135.462

BRIDGE-303
A1DIRT WALL 1 1 8.100 0.350 2.828 8.017

A2 DIRT WALL 1 1 8.100 0.400 3.949 12.795

SLAB A1-P1 57.334

SLAB P1-P2 57.334

SLAB P2-P3 30.157

BRIDGE-296
A1DIRT WALL 1 1 8.100 0.400 3.949 12.795

A2 DIRT WALL 1 1 8.100 0.400 3.949 12.795

SLAB A1-P1 57.334


SLAB P1-P2 57.334
SLAB P2-P3 57.334
TOTAL QTY 1889.390
at Formation level
GRADE REMARKS

20.325 12.2

16.035

30.156 18.3
302.884
SCHEDULE - B6
Item No : 41 Extra for Every increase of 1m or part thereof in the height above 10m &20m
LENGTH WIDTH HEIGHT
SL NO DESCRIPTION NOS NOS (M) (M) (M)
LEVEL 10M TO 11.0M
BRIDGE-362
A2DIRT WALL 1 1 8.100 0.350 0.418
A2 DIRT WALL 1 2 3.000 0.350 0.418
A2 HUNCH 2 0.5 0.300 0.300 0.418
P3 PIER 1 1 3.000 2.000 1.000
P3 PIER 2 0.5 3.141 1.000 1.000
BRIDGE-361
A1 WALL 1 2 2.323 1.300 1.000
BRACING 1 1 2.326 1.100 0.800
A2 DIRT WALL 1 1 8.100 0.350 1.000
A2 FLYWING WALL 1 2 1.660 0.350 0.808
A2 FLYWING WALL 1 1 1.340 0.350 0.808
A2 FLYWING WALL 1 2 3.000 0.350 0.192
A2 HUNUCH 1 1 0.300 0.300 1.000
A2 PEDESTALS 1 2 1.130 0.465 0.290

BRIDGE-360
A1 &A2 CAP 1 2 8.100 1.300 0.900
A1 &A2 HANUCH 1 2 0.300 0.300 0.900
A1& A2 DIRT WALL 1 2 8.100 0.350 0.100
A1& A2 FLY WING WALL 1 2 1.301 0.400 0.900

BRIDGE-346
A1 WALL 1 1 7.850 1.3260 0.800
A1 CAP 1 1 8.100 1.300 0.200

BRIDGE-334
A1 WALL 1 2 2.038 1.3000 1.000
A2 DIRT WALL 1 1 8.100 0.350 0.512
A2 HUNCH 1 1 0.300 0.300 0.512
A2 FLY WING WALL 1 2 3.000 0.350 0.512
P2 CAP 1 1 8.100 1.325 0.367
P2 PEDESTALS 1 2 1.255 0.690 0.300
BRIDGE-330
A1CAP 1 1 8.100 1.3000 0.820
A1 HANUCH 1 1 0.300 0.300 1.000
A1 FLY WING WALL 1 2 0.237 0.400 1.000
A1 FLY WING WALL 1 1 1.314 0.400 1.000
A1 DIRT WALL 1 1 8.100 0.350 0.180
A1PEDESTALS 1 2 1.255 0.5600 0.180
A2FLY WING WALL 1 2 3.000 0.400 0.808
A2FLY WING WALL 1 2 2.748 0.400 0.192
A2FLY WING WALL 1 1 0.252 0.400 0.192
A2 DIRT WALL 1 1 8.100 0.350 1.000
A2 HANUCH 1 1 0.300 0.300 1.000
P1 SHAFT 1 1 4.000 2.500 1.000
P1 SHAFT 1 1 3.141 1.5620 1.000
BRIDGE-327
P1 SHAFT 1 1 3.700 2.5000 1.000
P1 SHAFT 1 1 3.141 1.5620 1.000
P2 SHAFT 1 1 3.700 2.5000 1.000
P2 SHAFT 1 1 3.141 1.5620 1.000
BRIDGE-314
P1 SHAFT 1 1 3.000 2.0000 0.500
P1 SHAFT 1 1 3.141 1.0000 0.500
P1 CAP 1 1 6.650 2.4000 0.200
P1 CAP 1 1 8.100 2.4000 0.300
P1 IP 1 1 12.900 1.2000 0.200
P2 SHAFT 1 1 3.000 2.0000 0.500
P2 SHAFT 1 1 3.141 1.0000 0.500
P2 CAP 1 1 6.650 2.4000 0.200
P2 CAP 1 1 8.100 2.4000 0.300
P2 IP 1 1 12.900 1.2000 0.200
BRIDGE-312
P1 SHAFT 1 1 3.750 2.5000 1.000
P1 SHAFT 1 1 3.141 1.5620 1.000
BRIDGE-303
P2 SHAFT 1 1 4.000 3.0000 1.000
P2 SHAFT 1 1 3.141 2.2500 1.000

LEVEL 11.0M TO 12.0M


BRIDGE-362
P3 PIER 2 1 3.000 2.000 0.600
P3 PIER 4 0.5 3.141 1.000 0.600
P3 CAP 2 1 6.750 2.400 0.200
P3 CAP 2 1 8.100 2.400 0.200
P3 IP 2 2 12.900 1.200 0.200
BRIDGE-361
A1 WALL 2 2 2.068 1.300 1.000
BRIDGE-360
A1 & A2 PEDESTALS 2 4 1.255 0.560 0.300
A1 &A2DIRTWALL 2 2 8.100 0.350 1.000
A1 &A2 HANUCH 2 2 0.300 0.300 1.000
A1& A2 FLY WING WALL 2 4 1.446 0.400 1.000
A1& A2 FLY WING WALL 2 2 1.315 0.400 1.000

BRIDGE-334
A1 WALL 2 2 1.713 1.3000 1.000
BRIDGE-330
A1PEDESTALS 2 2 1.255 0.5600 0.120
A1 HANUCH 2 1 0.300 0.300 1.000
A1 FLY WING WALL 2 2 1.551 0.400 1.000
A1 FLY WING WALL 2 1 1.315 0.400 1.000
A1 DIRT WALL 2 1 8.100 0.350 1.000
A2FLY WING WALL 2 2 3.000 0.400 0.192
A2 DIRT WALL 2 1 8.100 0.350 0.192
A2 HANUCH 2 1 0.300 0.300 0.192
P1 SHAFT 2 1 4.000 2.500 1.000
P1 SHAFT 2 1 3.141 1.5620 1.000
BRIDGE-327
P1 SHAFT 2 1 3.700 2.5000 1.000
P1 SHAFT 2 1 3.141 1.5620 1.000
P2 SHAFT 2 1 3.700 2.5000 1.000
P2 SHAFT 2 1 3.141 1.5620 1.000
BRIDGE-314
P1 CAP 2 1 8.100 2.4000 0.700
P1 PEDESTALS 2 2 1.130 0.9000 0.300
P2 CAP 2 1 8.100 2.4000 0.700
P2 PEDESTALS 2 2 1.130 0.9000 0.300
BRIDGE-312
P1 SHAFT 2 1 3.750 2.5000 1.000
P1 SHAFT 2 1 3.141 1.5620 1.000
BRIDGE-303
P2 SHAFT 2 1 4.000 3.0000 1.000
P2 SHAFT 2 1 3.141 2.2500 1.000

LEVEL 12.0M TO 13.0M


BRIDGE-362
P3 CAP 3 1 8.100 2.400 0.800
P3 PEDESTALS 3 2 1.130 0.900 0.200
BRIDGE-361
A1 WALL 3 2 1.813 1.300 1.000
BRIDGE-360
A1 &A2DIRTWALL 3 2 8.100 0.350 1.000
A1 &A2 HANUCH 3 2 0.300 0.300 1.000
A1& A2 FLY WING WALL 3 4 3.000 0.400 0.818
A1& A2 FLY WING WALL 3 2 2.761 0.400 0.182
A1& A2 FLY WING WALL 3 2 0.239 0.400 0.182
BRIDGE-334
A1 WALL 3 2 1.500 1.3000 0.300
BRIDGE-330
A1 HANUCH 3 1 0.300 0.300 1.000
A1 FLY WING WALL 3 2 2.866 0.400 0.105
A1 FLY WING WALL 3 1 0.134 0.400 0.105
A1 FLY WING WALL 3 2 3.000 0.400 0.895
A1 DIRT WALL 3 1 8.100 0.350 1.000
P1 SHAFT 3 1 4.000 2.500 0.500
P1 SHAFT 3 1 3.141 1.5620 0.500
P1 CAP 3 1 8.100 2.900 0.500
P1 IP 3 2 13.400 1.200 0.200
P2 CAP 3 1 8.100 2.900 0.285
P2 IP 3 2 13.400 1.200 0.200
BRIDGE-312
P1 SHAFT 3 1 3.750 2.5000 1.000
P1 SHAFT 3 1 3.141 1.5620 1.000
BRIDGE-303 3
P2 SHAFT 3 1 4.000 3.0000 1.000
P2 SHAFT 3 1 3.141 2.2500 1.000

LEVEL 13.0M TO 14.0M


BRIDGE-362
P3 PEDESTALS 4 2 1.130 0.900 0.100
BRIDGE-361
A1 WALL 4 2 1.558 1.300 1.000
BRIDGE-360
A1 &A2DIRTWALL 4 2 8.100 0.350 0.182
A1 &A2 HANUCH 4 2 0.300 0.300 0.182
A1& A2 FLY WING WALL 4 4 3.000 0.400 0.182

BRIDGE-330
A1 HANUCH 4 1 0.300 0.300 0.102
A1 FLY WING WALL 4 2 3.000 0.400 0.102
A1 DIRT WALL 4 1 8.100 0.350 0.102
P1 CAP 4 1 8.100 2.900 0.700
P1 CAP 4 1 8.100 1.450 0.300
P1 PEDESTALS 4 2 1.48 0.8 0.3
P2 CAP 4 1 8.100 2.900 0.915
P2 CAP 4 1 8.100 1.450 0.085
P2PEDESTALS 4 2 13.400 1.200 0.085
BRIDGE-312
P1 SHAFT 4 1 3.750 2.5000 1.000
P1 SHAFT 4 1 3.141 1.5620 1.000
BRIDGE-303 4
P2 SHAFT 4 1 4.000 3.0000 1.000
P2 SHAFT 4 1 3.141 2.2500 1.000

LEVEL 14.0M TO 15.0M


BRIDGE-361
A1 WALL 5 2 1.365 1.300 0.510
A1 CAP 5 1 8.100 1.300 0.490
A1 HUNUCH 5 1 0.300 0.300 0.490
A1 IP 5 1 8.100 1.200 0.200
A1 FLY WING WALL 5 1 0.634 0.350 0.490
BRIDGE-360
P1 CAP 5 1 8.100 2.900 0.280
P1 IP 5 2 13.400 1.200 0.200
P2 CAP 5 1 8.100 2.900 0.280
P2 IP 5 2 13.400 1.200 0.200
BRIDGE-330
P1 CAP 5 1 8.100 1.450 0.867
P1 PEDESTALS 5 2 1.255 0.69 0.133
P2 CAP 5 1 8.100 1.450 1.000
P2PEDESTALS 5 2 13.400 1.200 0.215
BRIDGE-312
P1 SHAFT 5 1 3.750 2.5000 1.000
P1 SHAFT 5 1 3.141 1.5620 1.000
P2 CAP 5 1 8.100 2.900 0.300
P2 IP 5 2 13.400 1.200 0.200
BRIDGE-303
P2 SHAFT 5 1 4.000 3.0000 1.000
P2 SHAFT 5 1 3.141 2.2500 1.000

LEVEL 15.0M TO 16.0M


BRIDGE-360
P1 CAP 6 1 8.100 2.900 0.920
P1 PEDESTALS 6 2 1.255 1.090 0.080
P2 CAP 6 1 8.100 2.900 0.920
P2 PEDESTALS 6 2 1.255 1.090 0.080
BRIDGE-330
P1 PEDESTALS 6 2 1.255 0.69 0.167
P2 CAP 6 1 8.100 1.450 0.082
P2PEDESTALS 6 2 13.400 1.200 0.300
BRIDGE-312
P1 SHAFT 6 1 3.750 2.5000 1.000
P1 SHAFT 6 1 3.141 1.5620 1.000
P2 CAP 6 1 8.100 2.900 0.900
P2 PEDESTALS 6 2 1.255 1.090 0.100
BRIDGE-303
P2 SHAFT 6 1 4.000 3.0000 1.000
P2 SHAFT 6 1 3.141 2.2500 1.000

LEVEL 16.0M TO 17.0M


BRIDGE-360
P1 PEDESTALS 7 2 1.255 1.090 0.220
P2 PEDESTALS 7 2 1.255 1.090 0.220
BRIDGE-312
P1 SHAFT 7 1 3.750 2.5000 0.180
P1 SHAFT 7 1 3.141 1.5620 0.180
P1 CAP 7 1 8.100 2.9000 0.820
P1 IP 7 2 13.400 1.2000 0.200
P2 PEDESTALS 7 2 1.255 1.090 0.200
BRIDGE-303
P2 SHAFT 7 1 4.000 3.0000 1.000
P2 SHAFT 7 1 3.141 2.2500 1.000
LEVEL 17.0M TO 18.0M
BRIDGE-312
P1 CAP 8 1 8.100 2.9000 0.380
P1PEDESTALS 8 2 13.400 1.2000 0.300
BRIDGE-303
P2 SHAFT 8 1 4.000 3.0000 1.000
P2 SHAFT 8 1 3.141 2.2500 1.000

LEVEL 18.0M TO 19.0M


BRIDGE-303
P2 SHAFT 9 1 4.000 3.0000 1.000
P2 SHAFT 9 1 3.141 2.2500 1.000

LEVEL 19.0M TO 20.0M


BRIDGE-303
P2 SHAFT 10 1 4.000 3.0000 0.676
P2 SHAFT 10 1 3.141 2.2500 0.676
ht above 10m &20m
QUANTITY
(M3) GRADE REMARKS

1.1850
0.8778
0.0376
6.0000
3.1410

6.0385
2.0469
2.8350
0.9389
0.3790
0.4032
0.0900
0.3048

18.954
0.162
0.567
0.937

8.327
2.106

5.298
1.452
0.046
1.075
3.939
0.520

8.635
0.090
0.190
0.526
0.510
0.253
1.939
0.422
0.019
2.835
0.090
10.000
4.906

9.250
4.906
9.250
4.906

3.000
1.571
3.192
5.832
3.096
3.000
1.571
3.192
5.832
3.096

9.375
4.906

12.000
7.067

7.200
3.769
6.480
7.776
12.384
0.000
10.751
0.000
1.687
11.340
0.360
4.627
2.104
0.000

8.905
0.337
0.180
2.482
1.052
5.670
0.922
1.089
0.035
20.000
9.812

18.500
9.812
18.500
9.812

27.216
1.220
27.216
1.220

18.750
9.812

24.000
14.135

0.000
0.000
46.656
1.220
0.000
14.138
0.000
17.010
0.540
11.779
1.206
0.104

3.510

0.270
0.722
0.017
6.444
8.505
15.000
7.359
35.235
19.2960
20.0840
19.2960

28.125
14.719

36.000
21.202

0.000
0.000
0.000
0.814
0.000
16.198
0.000
4.128
0.131
3.494
0.000

0.037
0.979
1.157
65.772
14.0940
2.8416
85.9734
3.9933
10.9344

37.500
19.625

48.000
28.269
0.000
0.000 1.2
0.000
9.050
25.799
0.221
9.720
0.544
0.000
32.886
32.160
32.886
32.160

50.9146 215
1.1517135
58.7250
34.5720

46.875
24.531
35.2350
32.1600

60.000
35.336
0.000
0.000
0.000
129.665 16.22
1.313
129.665
1.313

1.7354
5.7785
57.8880

56.250
29.437
126.8460
1.6415

72.000
42.404
0.000
0.000 1.5
0.000
4.213
4.213

11.813
6.182
134.833
45.024
3.8303

84.000
49.471
0.000

71.410
77.184

96.000
56.538
0.000
0.000

108.000
63.605
0.000
0.000

81.120
47.775

3320.722
SCHEDULE - B6
Item No : 41 Extra for Every increase of 1m or part thereof in the height above 10m &20m
SL NO DESCRIPTION NOS NOS LENGTH WIDTH HEIGHT
(M) (M) (M)
LEVEL 10M TO 11.0M
BRIDGE-362
A2DIRT WALL 1 1 8.100 0.350 0.418
A2 DIRT WALL 1 2 3.000 0.350 0.418
A2 HUNCH 2 0.5 0.300 0.300 0.418
P1 PIER 1 1 3.750 2.500 1.000
P1 PIER 2 0.5 3.141 1.562 1.000
P2 PIER 1 1 3.750 2.500 1.000
P2 PIER 2 0.5 3.141 1.562 1.000
P3 PIER 1 1 3.000 2.000 1.000
P3 PIER 2 0.5 3.141 1.000 1.000

BRIDGE-361
A1 WALL 1 2 2.323 1.300 1.000
BRACING 1 1 2.326 1.100 0.800
A2 DIRT WALL 1 1 8.100 0.350 1.000
A2 FLYWING WALL 1 2 1.660 0.350 0.808
A2 FLYWING WALL 1 1 1.340 0.350 0.808
A2 FLYWING WALL 1 2 3.000 0.350 0.192
A2 HUNUCH 1 1 0.300 0.300 1.000
A2 PEDESTALS 1 2 1.130 0.465 0.290

BRIDGE-360
A1 &A2 CAP 1 2 8.100 1.300 0.900
A1 &A2 HANUCH 1 2 0.300 0.300 0.900
A1& A2 DIRT WALL 1 2 8.100 0.350 0.100
A1& A2 FLY WING WALL 1 2 1.301 0.400 0.900

BRIDGE-346
A1 WALL 1 1 7.850 1.3260 0.800
A1 CAP 1 1 8.100 1.300 0.200
A1 IP 1 1 8.100 1.200 0.200
A1 HUNUCH 1 1 0.300 0.300 0.200
A1 FLY WALL 1 1 0.330 0.350 0.200
A1 DIRTWALL 1 1 8.100 0.350 0.200
A1 PEDESTALS 1 2 1.130 0.465 0.200

BRIDGE-334
A1 WALL 1 2 2.038 1.3000 1.000
LEVEL 11.0M TO 12.0M
BRIDGE-362
P1 PIER 2 1 3.750 2.500 1.000
P1 PIER 4 0.5 3.141 1.562 1.000
P2 PIER 2 1 3.750 2.500 1.000
P2 PIER 4 0.5 3.141 1.562 1.000
P3 PIER 2 1 3.000 2.000 0.600
P3 PIER 4 0.5 3.141 1.000 0.600
P3 CAP 2 1 6.750 2.400 0.200
P3 CAP 2 1 8.100 2.400 0.200
P3 IP 2 2 12.900 1.200 0.200
BRIDGE-361
A1 WALL 2 2 2.068 1.300 1.000
A2 DIRT WALL 2 1 8.100 0.350 0.808
A2 FLYWING WALL 2 2 3.000 0.350 0.808
A2 HUNUCH 2 1 0.300 0.300 0.808
BRIDGE-360
A1 & A2 PEDESTALS 2 4 1.255 0.560 0.300
A1 &A2DIRTWALL 2 2 8.100 0.350 1.000
A1 &A2 HANUCH 2 2 0.300 0.300 1.000
A1& A2 FLY WING WALL 2 4 1.446 0.400 1.000
A1& A2 FLY WING WALL 2 2 1.315 0.400 1.000

BRIDGE-346
A1 CAP 2 1 8.100 1.300 0.800
A1 DIRTWALL 2 1 8.100 0.350 1.000
A1 HUNUCH 2 1 0.300 0.300 1.000
A1 FLY WALL 2 2 0.330 0.350 1.000
A1 FLY WALL 2 1 1.649 0.350 1.000
A1 PEDESTALS 2 2 1.130 0.465 0.100
BRIDGE-334
A1 WALL 2 2 1.713 1.3000 1.000
LEVEL 12.0M TO 13.0M
BRIDGE-362
P1 PIER 3 1 3.750 2.500 1.000
P1 PIER 6 0.5 3.141 1.562 1.000
P2 PIER 3 1 3.750 2.500 1.000
P2 PIER 6 0.5 3.141 1.562 1.000
P3 CAP 3 1 8.100 2.400 0.800
P3 PEDESTALS 3 2 1.130 0.900 0.200
BRIDGE-361
A1 WALL 3 2 1.813 1.300 1.000
BRIDGE-360
A1 &A2DIRTWALL 3 2 8.100 0.350 1.000
A1 &A2 HANUCH 3 2 0.300 0.300 1.000
A1& A2 FLY WING WALL 3 4 3.000 0.400 0.818
A1& A2 FLY WING WALL 3 2 2.761 0.400 0.182
A1& A2 FLY WING WALL 3 2 0.239 0.400 0.182

BRIDGE-346
A1 DIRTWALL 3 1 8.100 0.350 1.000
A1 HUNUCH 3 1 0.300 0.300 1.000
A1 FLY WALL 3 2 1.979 0.350 0.618
A1 FLY WALL 3 1 1.021 0.350 0.618
A1 FLY WALL 3 2 3.000 0.350 0.382
BRIDGE-334
A1 WALL 3 2 1.500 1.3000 0.300

LEVEL 13.0M TO 14.0M


BRIDGE-362
P1 PIER 4 1 3.750 2.500 0.650
P1 PIER 8 0.5 3.141 1.562 0.650
P1 CAP 4 1 7.150 2.900 0.300
P1 CAP 4 1 8.100 2.900 0.050
P1 IP 4 2 13.400 1.200 0.050
P2 PIER 4 1 3.750 2.500 0.116
P2 PIER 8 0.5 3.141 1.562 0.116
P2 CAP 4 1 7.150 2.900 0.300
P2 CAP 4 1 8.100 2.900 0.584
P2 IP 4 2 13.400 1.200 0.200
P3 PEDESTALS 4 2 1.130 0.900 0.100
BRIDGE-361
A1 WALL 4 2 1.558 1.300 1.000
BRIDGE-360
A1 &A2DIRTWALL 4 2 8.100 0.350 0.182
A1 &A2 HANUCH 4 2 0.300 0.300 0.182
A1& A2 FLY WING WALL 4 4 3.000 0.400 0.182

BRIDGE-346
A1 DIRTWALL 4 1 8.100 0.350 0.618
A1 HUNUCH 4 1 0.300 0.300 1.000
A1 FLY WALL 4 2 1.979 0.350 0.618
A1 FLY WALL 4 1 1.021 0.350 0.618
A1 FLY WALL 4 2 3.000 0.350 0.382
LEVEL 14.0M TO 15.0M
BRIDGE-362
P1 CAP 5 1 8.100 2.900 0.850
P1 IP 5 2 13.400 1.200 0.150
P1 CAP 5 1 8.100 1.450 0.150
P1 PEDESTALS 5 2 1.255 0.545 0.150
P2 CAP 5 1 8.100 2.900 0.316
P2 CAP 5 1 8.100 1.450 0.464
P2PEDESTALS 5 2 1.255 0.545 0.300
P2PEDESTALS 5 2 1.130 0.450 0.220
BRIDGE-361
A1 WALL 5 2 1.365 1.300 0.510
A1 CAP 5 1 8.100 1.300 0.490
A1 HUNUCH 5 1 0.300 0.300 0.490
A1 IP 5 1 8.100 1.200 0.200
A1 FLY WING WALL 5 1 0.634 0.350 0.490
BRIDGE-360
P1 CAP 5 1 8.100 2.900 0.720
P1 IP 5 2 13.400 1.200 0.200

LEVEL 15.0M TO 16.0M


BRIDGE-362
P1 CAP 6 1 8.100 1.450 0.314
P1 PEDESTALS 6 2 1.255 0.545 0.150
P2PEDESTALS 6 2 1.130 0.450 0.080
BRIDGE-361
A1 CAP 6 1 8.100 1.300 1.000
A1 HUNUCH 6 1 0.300 0.300 1.000
A1 FLY WING WALL 6 2 0.634 0.350 1.000
A1 FLY WING WALL 6 1 1.297 0.350 1.000
BRIDGE-360
P1 CAP 6 1 8.100 2.900 0.480
P1 IP 6 2 1.255 1.090 0.300

LEVEL 16.0M TO 17.0M


BRIDGE-361
A1 CAP 7 1 8.100 1.300 0.010
A1 HUNUCH 7 1 0.300 0.300 1.000
A1 PEDESTALS 7 2 1.130 0.465 0.300
A1 DIRTWALL 7 1 8.100 0.350 0.990
A1 FLY WING WALL 7 2 3.000 0.350 0.172
A1 FLY WING WALL 7 2 1.928 0.350 0.828
A1 FLY WING WALL 7 1 1.072 0.350 0.828

LEVEL 17.0M TO 18.0M


BRIDGE-361
A1 DIRTWALL 8 1 8.100 0.350 0.828
A1 FLY WING WALL 8 2 3.000 0.350 0.828
A1 HUNUCH 8 1 0.300 0.300 0.828
ht above 10m &20m
QUANTITY GRADE REMARKS
(M3)

1.185
0.878
0.038
9.375
4.906
9.375
4.906
6.000
3.141

6.039
2.047
2.835
0.939
0.379
0.403
0.090
0.305

18.954
0.162
0.567
0.937

8.327
2.106
1.944
0.018
0.023
0.567
0.210

5.298
18.750
9.812
18.750
9.812
7.200
3.769
6.480
7.776
12.384
0.000
10.751
4.581
3.394
0.145
0.000
1.687
11.340
0.360
4.627
2.104
0.000
0.000
16.848
5.670
0.180
0.462
1.154
0.210

8.905
0.000
0.000
28.125
14.719
28.125
14.719
46.656
1.220
0.000
14.138
0.000
17.010
0.540
11.779
1.206
0.104
0.000
0.000
8.505
0.270
2.568
0.663
2.407

3.510
0.000
0.000
0.000
0.000
24.375
12.756
24.882
4.698
6.432
4.350
2.276
24.882
54.873
25.728
0.814
0.000
16.198
0.000
4.128
0.131
3.494
0.000
0.000
7.008
0.360
3.424
0.883
3.209
0.000
0.000
0.000
0.000
0.000
0.000
0.000 1.2
0.000
99.833
24.120
8.809
1.026
37.114
27.248
2.052
1.119
0.000
9.050
25.799
0.221
9.720
0.544
0.000
84.564
32.160
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000 0.314
22.128
1.231
0.488
0.000
63.180
0.540
2.663
2.724
0.000
67.651
4.925
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000 1.5
0.000
0.737
0.630
2.207
19.647
2.528
7.822
2.175
0.000
0.000
0.000
0.000
0.000
0.000
0.000
18.779
13.910
0.596
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
SCHEDULE - B6
Item No : 50 RCC Raft foundation & Pile cap (Shuttering and Centering)
SL LENGTH WIDTH HEIGHT QUANTITY
DESCRIPTION NOS NOS GRADE REMARKS
NO (M) (M) (M) (M3)
BRIDG-362
A1 PILE CAP PCC 2 2 8.900 0.100 3.560

A1 PILE CAP RAFT 2 2 8.700 1.800 62.640

A2 PCC 1 2 11.200 0.100 2.240

A2 PCC 1 2 11.050 0.100 2.210

A2 RAFT 1 2 11.000 1.500 33.000

A2 RAFT 1 2 10.850 1.500 32.550

P1 PCC 1 2 18.200 0.100 3.640

P1 PCC 1 2 11.700 0.100 2.340

P1 RAFT 1 2 18.000 2.250 81.000

P1 RAFT 1 2 11.500 2.250 51.750

P2 PCC 1 2 18.200 0.100 3.640

P2 PCC 1 2 11.700 0.100 2.340

P2 RAFT 1 2 18.000 2.250 81.000

P2 RAFT 1 2 11.500 2.250 51.750

P3 PCC 1 2 13.200 0.100 2.640

P3 PCC 1 2 9.700 0.100 1.940

P3 RAFT 1 2 13.000 1.300 33.800

P3 RAFT 1 2 9.500 1.300 24.700

P3 RAFT 1 2 8.050 0.500 8.050

A2 RWALL PCC 1 2 60.200 0.100 12.040

A2 RWALL PCC 1 2 4.600 0.100 0.920

A2 RWALL RAFT 1 2 60.000 0.600 72.000

A2 RWALL RAFT 1 5 4.400 0.600 13.200

BRIDGE-361 0.000

A1 PCC 1 2 12.400 0.100 2.480

A1 PCC 1 2 9.200 0.100 1.840

A1 RAFT 1 2 12.200 2.000 48.800

A1 RAFT 1 2 9.000 2.000 36.000

A2 PCC 1 2 12.500 0.100 2.500

A2 PCC 1 2 10.650 0.100 2.130

A2 RAFT 1 2 12.300 2.100 51.660

A2 RAFT 1 2 10.450 2.100 43.890

BRIDGE-360 0.000

A1 PCC 1 2 14.700 0.100 2.940

A1 PCC 1 2 10.050 0.100 2.010

A1 RAFT 1 2 14.500 2.200 63.800

A1 RAFT 1 2 9.850 2.200 43.340


A2 PCC 1 2 14.700 0.100 2.940

A2 PCC 1 2 10.050 0.100 2.010

A2 RAFT 1 2 14.500 2.200 63.800

A2 RAFT 1 2 9.850 2.200 43.340

BRIDGE-346 0.000
A1 PCC 1 2 11.700 0.100 2.340

A1 PCC 1 2 9.050 0.100 1.810

A1 RAFT 1 2 11.500 2.000 46.000

A1 RAFT 1 2 8.850 2.000 35.400

A2 PCC 1 2 11.700 0.100 2.340

A2 PCC 1 2 9.050 0.100 1.810

A2 RAFT 1 2 11.500 2.000 46.000

A2 RAFT 1 2 8.850 2.000 35.400

P1 PCC 1 2 11.700 0.100 2.340

P1 PCC 1 2 8.950 0.100 1.790

P1 RAFT 1 2 11.500 1.800 41.400

P1 RAFT 1 2 8.750 1.800 31.500

P2 PCC 1 2 11.700 0.100 2.340

P2 PCC 1 2 8.950 0.100 1.790

P2 RAFT 1 2 11.500 1.800 41.400

P2 RAFT 1 2 8.750 1.800 31.500

BRIDGE-334
A1 PCC 1 2 14.900 0.100 2.980

A1 PCC 1 2 9.200 0.100 1.840

A1 RAFT 1 2 14.700 2.200 64.680

A1 RAFT 1 2 9.000 2.200 39.600

A2 PCC 1 2 14.700 0.100 2.940

A2 PCC 1 2 10.050 0.100 2.010

A2 RAFT 1 2 14.500 2.200 63.800

A2 RAFT 1 2 9.850 2.200 43.340

BRIDGE-330
A1 PCC 1 2 14.700 0.100 2.940

A1 PCC 1 2 10.050 0.100 2.010

A1 RAFT 1 2 14.500 2.200 63.800

A1 RAFT 1 2 9.850 2.200 43.340

A2 PCC 1 2 14.700 0.100 2.940

A2 PCC 1 2 10.050 0.100 2.010

A2 RAFT 1 2 14.500 2.200 63.800

A2 RAFT 1 2 9.850 2.200 43.340

P1 PCC 1 2 16.200 0.100 3.240

P1 PCC 1 2 13.200 0.100 2.640

P1 RAFT 1 2 16.000 1.250 40.000


P1 RAFT 1 2 13.000 1.250 32.500

P1 RAFT 1 2 10.250 0.750 15.375

A2 WALL PCC 1 2 76.200 0.100 15.240

A2 WALL PCC 1 2 3.400 0.100 0.680

A2 RAFT 1 2 76.000 0.500 76.000

A2 RAFT 1 6 3.200 0.500 9.600

BRIDGE-327
A1 PCC 1 2 12.500 0.100 2.500

A1 PCC 1 2 8.900 0.100 1.780

A1 RAFT 1 2 12.300 1.800 44.280

A1 RAFT 1 2 8.700 1.800 31.320

A2 PCC 1 2 12.500 0.100 2.500

A2 PCC 1 2 8.900 0.100 1.780

A2 RAFT 1 2 12.300 1.800 44.280

A2 RAFT 1 2 8.700 1.800 31.320

P1 PCC 1 2 13.200 0.100 2.640

P1 PCC 1 2 12.200 0.100 2.440

P1 RAFT 1 2 13.000 1.200 31.200

P1 RAFT 1 2 12.000 1.200 28.800

P1 RAFT 1 2 9.550 0.600 11.460

P2 PCC 1 2 13.200 0.100 2.640

P2 PCC 1 2 12.200 0.100 2.440

P2 RAFT 1 2 13.000 1.200 31.200

P2 RAFT 1 2 12.000 1.200 28.800

P2 RAFT 1 2 9.550 0.600 11.460

BRIDGE-314
A1 PCC 1 2 12.500 0.100 2.500

A1 PCC 1 2 10.650 0.100 2.130

A1 RAFT 1 2 12.300 2.100 51.660

A1 RAFT 1 2 10.450 2.100 43.890

A2 PCC 1 2 13.200 0.100 2.640

A2 PCC 1 2 10.050 0.100 2.010

A2 RAFT 1 2 13.000 2.000 52.000

A2 RAFT 1 2 9.850 2.000 39.400

P1 PCC 1 2 13.200 0.100 2.640

P1 PCC 1 2 9.700 0.100 1.940

P1 RAFT 1 2 13.000 1.200 31.200

P1 RAFT 1 2 9.500 1.200 22.800

P1 RAFT 1 2 8.050 0.600 9.660

P2 PCC 1 2 13.200 0.100 2.640

P2 PCC 1 2 9.700 0.100 1.940

P2 RAFT 1 2 13.000 1.200 31.200


P2 RAFT 1 2 9.500 1.200 22.800

P2 RAFT 1 2 8.050 0.600 9.660

BRIDGE-312 0.000
A1 PCC 1 2 14.700 0.100 2.940

A1 PCC 1 2 10.050 0.100 2.010

A1 RAFT 1 2 14.500 2.200 63.800

A1 RAFT 1 2 9.850 2.200 43.340

A2 PCC 1 2 14.700 0.100 2.940

A2 PCC 1 2 10.050 0.100 2.010

A2 RAFT 1 2 14.500 2.200 63.800

A2 RAFT 1 2 9.850 2.200 43.340

BRIDGE-303
A1 PCC 1 2 14.700 0.100 2.940

A1 PCC 1 2 10.050 0.100 2.010

A1 RAFT 1 2 14.500 2.200 63.800

A1 RAFT 1 2 9.850 2.200 43.340

A2 PCC 1 2 14.900 0.100 2.980

A2 PCC 1 2 9.200 0.100 1.840

A2 RAFT 1 2 14.700 2.200 64.680

A2 RAFT 1 2 9.000 2.200 39.600

P2 RAFT 1 2 19.500 1.500 58.500

P2 RAFT 1 2 17.000 1.500 51.000

BRIDGE-296
A1 PCC 1 2 14.900 0.100 2.980

A1 PCC 1 2 9.200 0.100 1.840

A1 RAFT 1 2 14.700 2.200 64.680

A1 RAFT 1 2 9.000 2.200 39.600

A2 PCC 1 2 14.900 0.100 2.980

A2 PCC 1 2 9.200 0.100 1.840

A2 RAFT 1 2 14.700 2.200 64.680

A2 RAFT 1 2 9.000 2.200 39.600

P1 PCC 1 2 18.200 0.100 3.640

P1 PCC 1 2 17.200 0.100 3.440

P1 RAFT 1 2 18.000 2.000 72.000

P1 RAFT 1 2 17.000 2.000 68.000

P2 PCC 1 2 18.200 0.100 3.640

P2 PCC 1 2 17.200 0.100 3.440

P2 RAFT 1 2 18.000 2.000 72.000

P2 RAFT 1 2 17.000 2.000 68.000

BRIDGE-309
A1 PCC 1 2 8.450 0.100 1.690

A1 PCC 1 2 15.550 0.100 3.110


A1 RAFT 1 2 8.250 1.500 24.750

A1 RAFT 1 2 15.350 1.500 46.050

A2 PCC 1 2 8.450 0.100 1.690

A2 PCC 1 2 15.550 0.100 3.110

A2 RAFT 1 2 8.250 1.500 24.750

A2 RAFT 1 2 15.350 1.500 46.050

P1 PCC 1 2 15.200 0.100 3.040

P1 PCC 1 2 17.450 0.100 3.490

P1 RAFT 1 2 15.000 2.200 66.000

P1 RAFT 1 2 17.250 2.200 75.900

P2 PCC 1 2 15.200 0.100 3.040

P2 PCC 1 2 17.450 0.100 3.490

P2 RAFT 1 2 15.000 2.200 66.000

P2 RAFT 1 2 17.250 2.200 75.900

BRIDGE-351 448.06
A1 PCC 1 2 12.600 0.100 2.520

A1 PCC 1 2 9.000 0.100 1.800

A1 RAFT 1 2 12.400 1.800 44.640

A1 RAFT 1 2 8.800 1.800 31.680

A2 PCC 1 2 12.600 0.100 2.520

A2 PCC 1 2 9.000 0.100 1.800

A2 RAFT 1 2 12.400 1.800 44.640

A2 RAFT 1 2 8.800 1.800 31.680

P1 PCC 5 2 12.600 0.100 12.600

P1 PCC 5 2 9.000 0.100 9.000

P1 RAFT 5 2 12.400 2.000 248.000


P1 RAFT 5 2 8.800 2.000 176.000
TOTAL QTY 4729.955 448.060
SCHEDULE - B6
Item No : 51 Abutment,Pier,wingwall and return wall
SL LENGTH WIDTH HEIGHT QUANTIT
DESCRIPTION NOS NOS GRADE REMARKS
NO (M) (M) (M) Y (M3)
BRIDG-362
A1 SHAFT 1 1 5.650 4.563 25.7810
A1 SHAFT 1 1 7.850 4.563 35.8196
A1 SHAFT 1 2 1.400 4.563 12.7764
A1 RETURN WALL 1 2 4.450 7.381 65.6909
A1 RETURN WALL 1 2 3.850 7.381 56.8337
A1 RETURN WALL-HUNCH 1 2 0.848 3.000 5.0880
A2 SHAFT 1 2 7.850 7.600 119.3200
A2 SHAFT 1 2 1.400 7.600 21.2800
P3 BRWALL 1 2 13.000 2.500 65.0000
P3 BRWALL 1 2 12.400 2.500 62.0000
P3 BRWALL 1 2 9.500 2.000 38.0000
P3 BRWALL 1 2 8.900 2.000 35.6000
P3 BRWALL 1 2 1.450 0.500 1.4500
P3 BRWALL 1 2 1.150 0.500 1.1500
BRIDGE-361
A1SHAFT 2 2 3.150 14.510 182.8260
A1 SHAFT 2 2 1.300 14.510 75.4520
1ST BRACING BOTTOM 1 1 4.277 1.100 4.7047
2nd BRACING BOTTOM 1 1 3.354 1.100 3.6894
3rd BRACING BOTTOM 1 1 2.428 1.100 2.6708
BRACING SIDES 2 3 1.100 0.800 5.2800
DEDUCTION FOR BRACING -1 2 9.754 0.800 -15.6064
A2 SHAFT 1 2 7.850 8.990 141.1430
A2 SHAFT 1 2 1.500 8.990 26.9700
BRIDGE-360
A1SHAFT 1 2 7.850 9.900 155.4300
A1SHAFT 1 2 1.600 9.900 31.6800
A2SHAFT 1 2 7.850 9.900 155.4300
A2SHAFT 1 2 1.600 9.900 31.6800
BRIDGE-346
A1SHAFT 1 2 7.850 10.800 169.5600
A1SHAFT 1 2 1.650 10.800 35.6400
A2SHAFT 1 2 7.850 10.800 169.5600
A2SHAFT 1 2 1.650 10.800 35.6400

BRIDGE-334
A1SHAFT 2 2 3.450 12.300 169.7400
A1 SHAFT 2 2 1.300 12.300 63.9600
1ST BRACING BOTTOM 1 1 4.711 1.100 5.1821
2nd BRACING BOTTOM 1 1 3.711 1.100 4.0821
3rd BRACING BOTTOM 1 1 2.711 1.100 2.9821
BRACING SIDES 2 3 1.100 0.800 5.2800
DEDUCTION FOR BRACING -1 2 10.742 1.100 -23.6324
A2 SHAFT 1 2 7.850 7.230 113.5110
A2 SHAFT 1 2 1.600 7.230 23.1360

BRIDGE-330
A1 SHAFT 1 2 7.850 9.820 154.1740
A1 SHAFT 1 2 1.600 9.820 31.4240
A2 SHAFT 1 2 7.850 7.910 124.1870
A2 SHAFT 1 2 1.600 7.910 25.3120
A2 RWALL 1 2 77.000 4.250 654.5000
A2 RWALL 1 2 0.375 4.250 3.1875
P1 BRWALL 1 2 16.000 2.750 88.0000
P1 BRWALL 1 2 15.400 2.750 84.7000
P1 BRWALL 1 2 13.000 2.000 52.0000
P1 BRWALL 1 2 12.400 2.000 49.6000
P1 BRWALL 1 2 2.750 0.750 4.1250
P1 BRWALL 1 2 2.450 0.750 3.6750
BRIDGE-327
A1 SHAFT 1 2 7.850 7.328 115.0496
A1 SHAFT 1 2 1.600 7.328 23.4496
A2 SHAFT 1 2 7.850 7.328 115.0496
A2 SHAFT 1 2 1.600 7.328 23.4496
BRIDGE-314
A1 SHAFT 1 2 7.850 6.600 103.6200
A1 SHAFT 1 2 1.500 6.600 19.8000
A2 SHAFT 1 2 7.850 9.500 149.1500
A2 SHAFT 1 2 1.550 9.500 29.4500
P1 BRWALL 1 2 13.000 2.500 65.0000
P1 BRWALL 1 2 12.400 2.500 62.0000
P1 BRWALL 1 2 9.500 2.000 38.0000
P1 BRWALL 1 2 8.900 2.000 35.6000
P1 BRWALL 1 2 1.450 0.500 1.4500
P1 BRWALL 1 2 1.150 0.500 1.1500
P2 BRWALL 1 2 13.000 2.500 65.0000
P2 BRWALL 1 2 12.400 2.500 62.0000
P2 BRWALL 1 2 9.500 2.000 38.0000
P2 BRWALL 1 2 8.900 2.000 35.6000
P2 BRWALL 1 2 1.450 0.500 1.4500
P2 BRWALL 1 2 1.150 0.500 1.1500
BRIDGE-312
A1 SHAFT 1 2 7.850 10.249 160.9093
A1 SHAFT 1 2 1.600 10.249 32.7968
A2 SHAFT 1 2 7.850 9.840 154.4880
A2 SHAFT 1 2 1.600 9.840 31.4880
BRIDGE-303
A1 SHAFT 1 2 7.850 9.667 151.7719
A1 SHAFT 1 2 1.600 9.667 30.9344
A2 SHAFT 2 2 3.450 12.750 175.9500
A2 SHAFT 2 2 1.300 12.750 66.3000
1ST BRACING BOTTOM 1 1 4.703 1.100 5.1733
2nd BRACING BOTTOM 1 1 3.706 1.100 4.0766
3rd BRACING BOTTOM 1 1 2.709 1.100 2.9799
BRACING SIDES 2 3 1.100 0.800 5.2800
DEDUCTION FOR BRACING -1 2 10.743 1.100 -23.6346
P2 BRWALL 1 2 19.500 2.800 109.2000
P2 BRWALL 1 2 18.900 2.800 105.8400
P2 BRWALL 1 2 17.000 2.800 95.2000
P2 BRWALL 1 2 16.400 2.800 91.8400
BRIDGE-296
A1 SHAFT 2 2 3.450 12.200 168.3600
A1 SHAFT 2 2 1.300 12.200 63.4400
1ST BRACING BOTTOM 1 1 4.713 1.100 5.1843
2nd BRACING BOTTOM 1 1 3.711 1.100 4.0821
3rd BRACING BOTTOM 1 1 2.718 1.100 2.9898
BRACING SIDES 2 3 1.100 0.800 5.2800
DEDUCTION FOR BRACING -1 2 10.752 1.100 -23.6544
A2 SHAFT 2 2 3.450 15.400 212.5200
A2 SHAFT 2 2 1.300 15.400 80.0800
1ST BRACING BOTTOM 1 1 4.659 1.100 5.1249
2nd BRACING BOTTOM 1 1 3.664 1.100 4.0304
3rd BRACING BOTTOM 1 1 2.665 1.100 2.9315
BRACING SIDES 2 3 1.100 0.800 5.2800
DEDUCTION FOR BRACING -1 2 10.679 1.100 -23.4938
BRIDGE-309
A1 &A2SHAFT 2 2 14.350 9.200 528.0800
A1 &A2SHAFT 2 2 1.500 9.200 55.2000 583.28
BRIDGE-351
A1 &A2SHAFT 2 2 7.850 8.667 272.1438
A1 &A2SHAFT 2 2 1.500 8.667 52.0020
TOTAL QTY 6069.0503 0.000
SCHEDULE - B6
Item No : 52Abutment Cap,Pier Cap,Inspection Platform & Pedestal Over Pier Cap, Fender wall,
Diphram wall etc.
SL LENGTH WIDTH HEIGHT QUANTIT
NO DESCRIPTION NOS NOS (M) (M) (M) Y (M3) GRADE REMARKS
BRIDGE-362
A1 CAP SIDES 1 1 7.850 0.800 6.2800
A1 CAP SIDES 1 1 5.650 1.000 5.6500
A1 CAP SIDES 1 2 1.300 1.000 2.6000
A1 IP-BTM 1 1 7.850 1.200 9.4200
A1 IP SIDES 1 1 7.850 0.200 1.5700
A1 IP SIDES 1 1 1.200 0.200 0.2400
A1 PEDESTALS 2 2 1.130 0.300 1.3560
A1 PEDESTALS 2 2 0.465 0.300 0.5580
OHE MAST 2 4 0.900 2.058 14.8176
OHE MAST 2 1 1.571 1.400 4.3974
A2 CAP SIDES 1 1 8.100 0.800 6.4800
A2 CAP SIDES 1 1 6.800 1.000 6.8000
A2 CAP SIDES 2 1 1.300 1.000 2.6000
A2 CAP BOTTOM 1 2 0.125 1.300 0.3250
A2 IP-BOTTOM 1 1 8.100 1.200 9.7200
A2 IP-SIDES 1 1 8.100 0.200 1.6200
A2 IP-SIDES 1 2 1.200 0.200 0.4800
A2 FLYWING WALL BTM 2 1 3.507 0.350 2.4549
A2 FLYWING WALL 2 2 3.000 1.000 12.0000
A2 FLYWING WALL 2 1 0.350 1.000 0.7000
A2 FLYWING WALL SLOPE AREA 4 0.5 3.000 1.818 10.9080
HANUCH 2 1 0.424 2.818 2.3897
A2 PEDESTALS 2 2 1.130 0.300 1.3560
A2 PEDESTALS 2 2 0.465 0.300 0.5580
OHE MAST 2 4 0.900 2.058 14.8176
OHE MAST 2 1 1.571 1.400 4.3974
P1&p2 CAP BOTTOM 2 1 6.600 2.900 38.2800
P1&p2 CAP BOTTOM 2 2 0.808 2.900 9.3702
IP BOTTOM 2 2 10.500 1.200 50.4000
IP BOTTOM 2 2 2.900 1.200 13.9200
IP SIDES 2 2 10.500 0.200 8.4000
IP SIDES 2 2 5.300 0.200 4.2400
CAP SIDES 2 2 6.200 0.300 7.4400
CAP SIDES 2 2 0.808 0.300 0.9696 4X0.5
CAP SIDES 2 1 8.100 0.700 11.3400
CAP SIDES 2 1 8.100 1.164 18.8568
CAP SIDES 2 1 8.100 0.464 7.5168
CAP SIDES 2 2 2.900 0.700 8.1200
CAP SIDES 2 2 1.450 0.464 2.6912
PEDESTALS 2 2 1.255 0.300 1.5060
PEDESTALS 2 4 0.540 0.300 1.2960
PEDESTALS 2 2 1.130 0.300 1.3560
PEDESTALS 2 4 0.450 0.300 1.0800
OHE MAST 2 8 0.900 2.058 29.6352
OHE MAST 2 2 1.571 2.058 12.9284
DEDUCTION PIER AREA -2 1 3.700 2.500 -18.5000
DEDUCTION PIER AREA -2 1 3.141 1.563 -9.8156
P3 CAP BOTTOM 1 1 5.400 2.400 12.9600
P3 CAP BOTTOM 1 2 1.365 2.900 7.9155
IP BOTTOM 1 2 10.500 1.200 25.2000
IP BOTTOM 1 2 2.400 1.200 5.7600
IP SIDES 1 2 10.500 0.200 4.2000
IP SIDES 1 2 4.800 0.200 1.9200
CAP SIDES 1 2 5.400 0.200 2.1600
CAP SIDES 1 2 1.365 0.200 0.5459
CAP SIDES 1 2 8.100 0.800 12.9600
CAP SIDES 1 2 2.400 0.800 3.8400
PEDESTALS 2 2 1.130 0.300 1.3560
PEDESTALS 2 2 0.900 0.300 1.0800
OHE MAST 1 8 0.900 2.058 14.8176
OHE MAST 1 2 1.571 2.058 6.4642
DEDUCTION PIER AREA -1 1 3.000 2.000 -6.0000
DEDUCTION PIER AREA -1 1 3.141 1.000 -3.1410
BRIDGE-361
A1 CAP SIDES 1 1 8.100 1.300 10.5300
A1 CAP SIDES 1 1 6.800 1.500 10.2000
A1 CAP SIDES 2 1 1.300 1.500 3.9000
A1 CAP BOTTOM 1 2 0.125 1.300 0.3250
A1 IP-BOTTOM 1 1 8.100 1.200 9.7200
A1 IP-SIDES 1 1 8.100 0.200 1.6200
A1 IP-SIDES 1 2 1.200 0.200 0.4800
A1 FLYWING WALL BTM 2 1 3.507 0.350 2.4549
A1 FLYWING WALL 2 2 3.000 1.000 12.0000
A1 FLYWING WALL 2 1 0.350 1.000 0.7000
A1 FLYWING WALL SLOPE AREA 4 0.5 3.000 1.818 10.9080
HANUCH 2 1 0.424 2.818 2.3897
A1 PEDESTALS 2 2 1.130 0.300 1.3560
A1 PEDESTALS 2 2 0.465 0.300 0.5580
OHE MAST 2 4 0.900 2.058 14.8176
OHE MAST 2 1 1.571 1.400 4.3974

A2 CAP SIDES 1 1 8.100 0.800 6.4800


A2 CAP SIDES 1 1 6.800 1.000 6.8000
A2 CAP SIDES 2 1 1.300 1.000 2.6000
A2 CAP BOTTOM 1 2 0.125 1.300 0.3250
A2 IP-BOTTOM 1 1 8.100 1.200 9.7200
A2 IP-SIDES 1 1 8.100 0.200 1.6200
A2 IP-SIDES 1 2 1.200 0.200 0.4800
A2 FLYWING WALL BTM 2 1 3.507 0.350 2.4549
A2 FLYWING WALL 2 2 3.000 1.000 12.0000
A2 FLYWING WALL 2 1 0.350 1.000 0.7000
A2 FLYWING WALL SLOPE AREA 4 0.5 3.000 1.818 10.9080
HANUCH 2 1 0.424 2.818 2.3897
A2 PEDESTALS 2 2 1.130 0.300 1.3560
A2 PEDESTALS 2 2 0.465 0.300 0.5580
OHE MAST 2 4 0.900 2.058 14.8176
OHE MAST 2 1 1.571 1.400 4.3974

BRIDGE-360
A1 CAP SIDES 1 1 8.100 0.800 6.4800
A1 CAP SIDES 1 1 6.700 1.000 6.7000
A1 CAP SIDES 2 1 1.300 1.000 2.6000
A1 CAP BOTTOM 1 2 0.125 1.300 0.3250
A1 IP-BOTTOM 1 1 8.100 1.200 9.7200
A1 IP-SIDES 1 1 8.100 0.200 1.6200
A1 IP-SIDES 1 2 1.200 0.200 0.4800
A1 FLYWING WALL BTM 2 1 3.769 0.400 3.0152
A1 FLYWING WALL 2 2 3.000 1.000 12.0000
A1 FLYWING WALL SIDE 2 1 0.400 1.000 0.8000
A1 FLYWING WALL SLOPE AREA 4 0.5 3.000 2.282 13.6920
HANUCH 2 1 0.424 3.282 2.7831
A1 PEDESTALS 2 2 1.255 0.300 1.5060
A1 PEDESTALS 2 2 0.560 0.300 0.6720
OHE MAST 2 4 0.900 2.522 18.1584
OHE MAST 2 1 1.571 1.400 4.3974

A2 CAP SIDES 1 1 8.100 0.800 6.4800


A2 CAP SIDES 1 1 6.700 1.000 6.7000
A2 CAP SIDES 2 1 1.300 1.000 2.6000
A2 CAP BOTTOM 1 2 0.125 1.300 0.3250
A2 IP-BOTTOM 1 1 8.100 1.200 9.7200
A2 IP-SIDES 1 1 8.100 0.200 1.6200
A2 IP-SIDES 1 2 1.200 0.200 0.4800
A2 FLYWING WALL BTM 2 1 3.769 0.400 3.0152
A2 FLYWING WALL 2 2 3.000 1.000 12.0000
A2 FLYWING WALL 2 1 0.400 1.000 0.8000
A2 FLYWING WALL SLOPE AREA 4 0.5 3.000 2.282 13.6920
HANUCH 2 1 0.424 3.282 2.7831
A2 PEDESTALS 2 2 1.255 0.300 1.5060
A2 PEDESTALS 2 2 0.560 0.300 0.6720
OHE MAST 2 4 0.900 2.522 18.1584
OHE MAST 2 1 1.571 1.400 4.3974

P1 CAP BOTTOM 1 1 10.500 5.300 55.6500


IP SIDES 1 2 10.500 0.200 4.2000
IP SIDES 1 2 5.300 0.200 2.1200
CAP SIDES 1 2 8.100 1.000 16.2000
CAP SIDES 1 2 2.900 1.000 5.8000
PEDESTALS 2 2 1.255 0.300 1.5060
PEDESTALS 2 2 1.090 0.300 1.3080
OHE MAST 1 8 0.900 2.522 18.1584
OHE MAST 1 2 1.571 1.400 4.3974
DEDUCTION PIER AREA -1 1 3.750 2.500 -9.3750
DEDUCTION PIER AREA -1 1 3.141 1.563 -4.9078

P2 CAP BOTTOM 1 1 10.500 5.300 55.6500


IP SIDES 1 2 10.500 0.200 4.2000
IP SIDES 1 2 5.300 0.200 2.1200
CAP SIDES 1 2 8.100 1.000 16.2000
CAP SIDES 1 2 2.900 1.000 5.8000
PEDESTALS 2 2 1.255 0.300 1.5060
PEDESTALS 2 2 1.090 0.300 1.3080
OHE MAST 1 8 0.900 2.522 18.1584
OHE MAST 1 2 1.571 1.400 4.3974
DEDUCTION PIER AREA -1 1 3.750 2.500 -9.3750
DEDUCTION PIER AREA -1 1 3.141 1.563 -4.9078

BRIDGR-346
A1 CAP SIDES 1 1 8.100 0.800 6.4800
A1 CAP SIDES 1 1 6.800 1.000 6.8000
A1 CAP SIDES 2 1 1.300 1.000 2.6000
A1 CAP BOTTOM 1 2 0.125 1.300 0.3250
A1 IP-BOTTOM 1 1 8.100 1.200 9.7200
A1 IP-SIDES 1 1 8.100 0.200 1.6200
A1 IP-SIDES 1 2 1.200 0.200 0.4800
A1 FLYWING WALL BTM 2 1 3.507 0.350 2.4549
A1 FLYWING WALL 2 2 3.000 1.000 12.0000
A1 FLYWING WALL SIDE 2 1 0.350 1.000 0.7000
A1 FLYWING WALL SLOPE AREA 4 0.5 3.000 1.818 10.9080
HANUCH 2 1 0.424 2.818 2.3897
A1 PEDESTALS 2 2 1.255 0.300 1.5060
A1 PEDESTALS 2 2 0.560 0.300 0.6720
OHE MAST 2 4 0.900 2.058 14.8176
OHE MAST 2 1 1.571 1.400 4.3974

A2 CAP SIDES 1 1 8.100 0.800 6.4800


A2 CAP SIDES 1 1 6.800 1.000 6.8000
A2 CAP SIDES 2 1 1.300 1.000 2.6000
A2 CAP BOTTOM 1 2 0.125 1.300 0.3250
A2 IP-BOTTOM 1 1 8.100 1.200 9.7200
A2 IP-SIDES 1 1 8.100 0.200 1.6200
A2 IP-SIDES 1 2 1.200 0.200 0.4800
A2 FLYWING WALL BTM 2 1 3.507 0.350 2.4549
A2 FLYWING WALL 2 2 3.000 1.000 12.0000
A2 FLYWING WALL 2 1 0.350 1.000 0.7000
A2 FLYWING WALL SLOPE AREA 4 0.5 3.000 1.818 10.9080
HANUCH 2 1 0.424 2.818 2.3897
A2 PEDESTALS 2 2 1.255 0.300 1.5060
A2 PEDESTALS 2 2 0.560 0.300 0.6720
OHE MAST 2 4 0.900 2.058 14.8176
OHE MAST 2 1 1.571 1.400 4.3974

P1 CAP BOTTOM 1 1 10.500 5.300 55.6500


IP SIDES 1 2 10.500 0.200 4.2000
IP SIDES 1 2 5.300 0.200 2.1200
CAP SIDES 1 2 8.100 1.000 16.2000
CAP SIDES 1 2 2.900 1.000 5.8000
PEDESTALS 2 2 1.130 0.300 1.3560
PEDESTALS 2 2 0.900 0.300 1.0800
OHE MAST 1 8 0.900 2.058 14.8176
OHE MAST 1 2 1.571 1.400 4.3974
DEDUCTION PIER AREA -1 1 4.000 2.500 -10.0000
DEDUCTION PIER AREA -1 1 3.141 1.563 -4.9078

P2 CAP BOTTOM 1 1 10.500 5.300 55.6500


IP SIDES 1 2 10.500 0.200 4.2000
IP SIDES 1 2 5.300 0.200 2.1200
CAP SIDES 1 2 8.100 1.000 16.2000
CAP SIDES 1 2 2.900 1.000 5.8000
PEDESTALS 2 2 1.130 0.300 1.3560
PEDESTALS 2 2 0.900 0.300 1.0800
OHE MAST 1 8 0.900 2.058 14.8176
OHE MAST 1 2 1.571 1.400 4.3974
DEDUCTION PIER AREA -1 1 4.000 2.500 -10.0000
DEDUCTION PIER AREA -1 1 3.141 1.563 -4.9078
BRIDGE-334
A1 CAP SIDES 1 1 8.100 1.300 10.5300
A1 CAP SIDES 1 1 6.700 1.500 10.0500
A1 CAP SIDES 2 1 1.300 1.500 3.9000
A1 CAP BOTTOM 1 2 0.125 1.450 0.3625
A1 IP-BOTTOM 1 1 8.100 1.200 9.7200
A1 IP-SIDES 1 1 8.100 0.200 1.6200
A1 IP-SIDES 1 2 1.200 0.200 0.4800
A1 FLYWING WALL BTM 2 1 4.959 0.400 3.9672
A1 FLYWING WALL 2 2 3.000 1.000 12.0000
A1 FLYWING WALL SIDE 2 1 0.400 1.000 0.8000
A1 FLYWING WALL SLOPE AREA 4 0.5 3.000 3.949 23.6940
HANUCH 2 1 0.424 4.949 4.1968
A1 PEDESTALS 2 2 1.480 0.300 1.7760
A1 PEDESTALS 2 2 0.820 0.300 0.9840
OHE MAST 2 4 0.900 3.689 26.5608
OHE MAST 2 1 1.571 1.400 4.3974

A2 CAP SIDES 1 1 8.100 0.800 6.4800


A2 CAP SIDES 1 1 6.800 1.000 6.8000
A2 CAP SIDES 2 1 1.300 1.000 2.6000
A2 CAP BOTTOM 1 2 0.125 1.300 0.3250
A2 IP-BOTTOM 1 1 8.100 1.200 9.7200
A2 IP-SIDES 1 1 8.100 0.200 1.6200
A2 IP-SIDES 1 2 1.200 0.200 0.4800
A2 FLYWING WALL BTM 2 1 3.769 0.350 2.6383
A2 FLYWING WALL 2 2 3.000 1.000 12.0000
A2 FLYWING WALL 2 1 0.350 1.000 0.7000
A2 FLYWING WALL SLOPE AREA 4 0.5 3.000 2.282 13.6920
HANUCH 2 1 0.424 3.282 2.7831
A2 PEDESTALS 2 2 1.255 0.300 1.5060
A2 PEDESTALS 2 2 0.560 0.300 0.6720
OHE MAST 2 4 0.900 2.522 18.1584
OHE MAST 2 1 1.571 1.400 4.3974

P1 CAP BOTTOM 1 1 7.150 3.150 22.5225


P1 CAP BOTTOM 1 2 0.514 3.150 3.2382
P1 CAP BOTTOM 1 1 1.000 3.150 3.1500
IP SIDES 1 2 11.500 0.200 4.6000
IP SIDES 1 2 5.550 0.200 2.2200
CAPSIDES 1 2 7.150 0.200 2.8600
CAPSIDES 1 2 0.514 0.200 0.2056 4X0.5
CAP SIDES 1 2 9.100 0.800 14.5600
CAP SIDES 1 2 2.900 0.800 4.6400
PEDESTALS 2 2 1.480 0.300 1.7760
PEDESTALS 2 2 1.600 0.300 1.9200
OHE MAST 1 8 0.900 3.689 26.5608
OHE MAST 1 2 1.571 1.400 4.3974
DEDUCTION PIER AREA -1 1 4.000 2.750 -11.0000
DEDUCTION PIER AREA -1 1 3.141 1.891 -5.9385
TROLLEY REFUSE
COLUMNS 4 4 0.300 3.889
TIE BEAM BTM 1 2 1.300 0.300
TIE BEAM BTM 1 2 1.600 0.300
TIE BEAM 2 2 1.300 0.300
TIE BEAM 2 2 1.600 0.300
SLAB 1 1 3.700 2.700
TIE BEAM 2 2 1.900 0.175
TIE BEAM 2 2 3.000 0.175
SALB SIDES 2 1 3.700 0.125
SALB SIDES 2 1 2.700 0.125

P2 CAP BOTTOM 1 1 10.500 5.050 53.0250


IP SIDES 1 2 10.500 0.200 4.2000
IP SIDES 1 2 5.050 0.200 2.0200
CAP SIDES 1 2 8.100 1.000 16.2000
CAP SIDES 1 2 2.650 1.000 5.3000
CAP SIDES 1 2 8.100 1.167 18.9054
CAP SIDES 1 2 1.325 1.167 3.0926
PEDESTALS 2 2 1.255 0.300 1.5060
PEDESTALS 2 2 0.690 0.300 0.8280
PEDESTALS 2 1 1.480 0.300 0.8880
PEDESTALS 2 2 0.690 0.300 0.8280
OHE MAST 1 8 0.900 2.522 18.1584
OHE MAST 1 2 1.571 1.400 4.3974
DEDUCTION PIER AREA -1 1 4.000 2.500 -10.0000
DEDUCTION PIER AREA -1 1 3.141 1.563 -4.9078

BRIDGE-330
A1 CAP SIDES 1 1 8.100 0.800 6.4800
A1 CAP SIDES 1 1 6.800 1.000 6.8000
A1 CAP SIDES 2 1 1.300 1.000 2.6000
A1 CAP BOTTOM 1 2 0.125 1.300 0.3250
A1 IP-BOTTOM 1 1 8.100 1.200 9.7200
A1 IP-SIDES 1 1 8.100 0.200 1.6200
A1 IP-SIDES 1 2 1.200 0.200 0.4800
A1 FLYWING WALL BTM 2 1 3.769 0.400 3.0152
A1 FLYWING WALL 2 2 3.000 1.000 12.0000
A1 FLYWING WALL SIDE 2 1 0.400 1.000 0.8000
A1 FLYWING WALL SLOPE AREA 4 0.5 3.000 2.282 13.6920
HANUCH 2 1 0.424 3.282 2.7831
A1 PEDESTALS 2 2 1.255 0.300 1.5060
A1 PEDESTALS 2 2 0.560 0.300 0.6720
OHE MAST 2 4 0.900 2.522 18.1584
OHE MAST 2 1 1.571 1.400 4.3974

A2 CAP SIDES 1 1 8.100 0.800 6.4800


A2 CAP SIDES 1 1 6.800 1.000 6.8000
A2 CAP SIDES 2 1 1.300 1.000 2.6000
A2 CAP BOTTOM 1 2 0.125 1.300 0.3250
A2 IP-BOTTOM 1 1 8.100 1.200 9.7200
A2 IP-SIDES 1 1 8.100 0.200 1.6200
A2 IP-SIDES 1 2 1.200 0.200 0.4800
A2 FLYWING WALL BTM 2 1 3.769 0.400 3.0152
A2 FLYWING WALL 2 2 3.000 1.000 12.0000
A2 FLYWING WALL 2 1 0.400 1.000 0.8000
A2 FLYWING WALL SLOPE AREA 4 0.5 3.000 2.282 13.6920
HANUCH 2 1 0.424 3.282 2.7831
A2 PEDESTALS 2 2 1.255 0.300 1.5060
A2 PEDESTALS 2 2 0.560 0.300 0.6720
OHE MAST 2 4 0.900 2.522 18.1584
OHE MAST 2 1 1.571 1.400 4.3974

P1 CAP BOTTOM 1 1 10.500 5.300 55.6500


IP SIDES 1 2 10.500 0.200 4.2000
IP SIDES 1 2 5.300 0.200 2.1200
CAP SIDES 1 2 8.100 1.000 16.2000
CAP SIDES 1 2 2.900 1.000 5.8000
CAP SIDES 1 2 8.100 1.167 18.9054
CAP SIDES 1 2 1.450 1.167 3.3843
PEDESTALS 2 2 1.480 0.300 1.7760
PEDESTALS 2 2 0.800 0.300 0.9600
PEDESTALS 2 2 1.255 0.300 1.5060
PEDESTALS 2 2 0.690 0.300 0.8280
OHE MAST 1 8 0.900 2.522 18.1584
OHE MAST 1 2 1.571 1.400 4.3974
DEDUCTION PIER AREA -1 1 4.000 2.500 -10.0000
DEDUCTION PIER AREA -1 1 3.141 1.563 -4.9078

P2 CAP BOTTOM 1 1 10.500 5.300 55.6500


IP SIDES 1 2 10.500 0.200 4.2000
IP SIDES 1 2 5.300 0.200 2.1200
CAP SIDES 1 2 8.100 1.000 16.2000
CAP SIDES 1 2 2.900 1.000 5.8000
CAP SIDES 1 2 8.100 1.167 18.9054
CAP SIDES 1 2 1.450 1.167 3.3843
PEDESTALS 2 2 1.480 0.300 1.7760
PEDESTALS 2 2 0.800 0.300 0.9600
PEDESTALS 2 2 1.255 0.300 1.5060
PEDESTALS 2 2 0.690 0.300 0.8280
OHE MAST 1 8 0.900 2.522 18.1584
OHE MAST 1 2 1.571 1.400 4.3974
DEDUCTION PIER AREA -1 1 4.000 2.500 -10.0000
DEDUCTION PIER AREA -1 1 3.141 1.563 -4.9078

BRIDGE-327
A1 CAP SIDES 1 1 7.850 0.800 6.2800
A1 CAP SIDES 1 1 5.850 1.000 5.8500
A1 CAP SIDES 1 2 1.300 1.000 2.6000
A1 IP-BTM 1 1 12.850 1.200 15.4200
A1 IP SIDES 1 1 10.250 0.200 2.0500
A1 IP SIDES 1 2 2.500 0.200 1.0000
A1 PEDESTALS 2 2 1.130 0.300 1.3560
A1 PEDESTALS 2 2 0.470 0.300 0.5640
OHE MAST 2 4 0.900 2.058 14.8176
OHE MAST 2 1 1.571 1.400 4.3974
A1 FLYWING WALL BTM 2 1 3.507 0.400 2.8056
A1 FLYWING WALL 2 2 3.000 1.000 12.0000
A1FLYWING WALL 2 1 0.400 1.000 0.8000
A1 FLYWING WALL SLOPE AREA 4 0.5 3.000 1.818 10.9080

A2 CAP SIDES 1 1 7.850 0.800 6.2800


A2 CAP SIDES 1 1 5.850 1.000 5.8500
A2 CAP SIDES 1 2 1.300 1.000 2.6000
A2 IP-BTM 1 1 12.850 1.200 15.4200
A2 IP SIDES 1 1 10.250 0.200 2.0500
A2 IP SIDES 1 2 2.500 0.200 1.0000
A2 PEDESTALS 2 2 1.130 0.300 1.3560
A2 PEDESTALS 2 2 0.470 0.300 0.5640
OHE MAST 2 4 0.900 2.058 14.8176
OHE MAST 2 1 1.571 1.400 4.3974
A1 FLYWING WALL BTM 2 1 3.507 0.400 2.8056
A1 FLYWING WALL 2 2 3.000 1.000 12.0000
A1FLYWING WALL 2 1 0.400 1.000 0.8000
A1 FLYWING WALL SLOPE AREA 4 0.5 3.000 1.818 10.9080
OHE MAST 2 4 0.900 2.058 14.8176
OHE MAST 2 1 1.571 1.400 4.3974

P1 CAP BOTTOM 1 1 6.600 2.900 19.1400


P1 CAP BOTTOM 2 1 0.776 2.900 4.5008
IP BOTTOM 1 2 10.500 1.200 25.2000
IP BOTTOM 1 2 2.900 1.200 6.9600
IP SIDES 1 2 10.500 0.200 4.2000
IP SIDES 1 2 5.300 0.200 2.1200
CAP SIDES 1 2 6.600 0.200 2.6400
CAP SIDES 1 2 0.776 0.200 0.3104
CAP SIDES 1 2 8.100 0.800 12.9600
CAP SIDES 1 2 2.900 0.800 4.6400
CAP SIDES 1 2 8.100 0.464 7.5168
CAP SIDES 1 2 1.450 0.464 1.3456
PEDESTALS 2 1 1.255 0.300 0.7530
PEDESTALS 2 2 0.545 0.300 0.6540
PEDESTALS 2 2 1.130 0.300 1.3560
PEDESTALS 2 2 0.600 0.300 0.7200
OHE MAST 1 8 0.900 2.058 14.8176
OHE MAST 1 2 1.571 1.400 4.3974
DEDUCTION PIER AREA -1 1 3.700 2.500 -9.2500
DEDUCTION PIER AREA -1 1 3.141 1.563 -4.9078

P1 CAP BOTTOM 1 1 6.600 2.900 19.1400


P1 CAP BOTTOM 2 1 0.776 2.900 4.5008
IP BOTTOM 1 2 10.500 1.200 25.2000
IP BOTTOM 1 2 2.900 1.200 6.9600
IP SIDES 1 2 10.500 0.200 4.2000
IP SIDES 1 2 5.300 0.200 2.1200
CAP SIDES 1 2 6.600 0.200 2.6400
CAP SIDES 1 2 0.776 0.200 0.3104
CAP SIDES 1 2 8.100 0.800 12.9600
CAP SIDES 1 2 2.900 0.800 4.6400
CAP SIDES 1 2 8.100 0.464 7.5168
CAP SIDES 1 2 1.450 0.464 1.3456
PEDESTALS 2 1 1.255 0.300 0.7530
PEDESTALS 2 2 0.545 0.300 0.6540
PEDESTALS 2 2 1.130 0.300 1.3560
PEDESTALS 2 2 0.600 0.300 0.7200
OHE MAST 1 8 0.900 2.058 14.8176
OHE MAST 1 2 1.571 1.400 4.3974
DEDUCTION PIER AREA -1 1 3.700 2.500 -9.2500
DEDUCTION PIER AREA -1 1 3.141 1.563 -4.9078
BRIDGE-314
A1 CAP SIDES 1 1 8.100 0.800 6.4800
A1 CAP SIDES 1 1 6.800 1.000 6.8000
A1 CAP SIDES 2 1 1.300 1.000 2.6000
A1 CAP BOTTOM 1 2 0.125 1.300 0.3250
A1 IP-BOTTOM 1 1 8.100 1.200 9.7200
A1 IP-SIDES 1 1 8.100 0.200 1.6200
A1 IP-SIDES 1 2 1.200 0.200 0.4800
A1 FLYWING WALL BTM 2 1 3.507 0.350 2.4549
A1 FLYWING WALL 2 2 3.000 1.000 12.0000
A1 FLYWING WALL SIDE 2 1 0.350 1.000 0.7000
A1 FLYWING WALL SLOPE AREA 4 0.5 3.000 1.818 10.9080
HANUCH 2 1 0.424 2.818 2.3897
A1 PEDESTALS 2 2 1.130 0.300 1.3560
A1 PEDESTALS 2 2 0.465 0.300 0.5580
OHE MAST 2 4 0.900 2.058 14.8176
OHE MAST 2 1 1.571 1.400 4.3974

A2 CAP SIDES 1 1 8.100 0.800 6.4800


A2 CAP SIDES 1 1 6.800 1.000 6.8000
A2 CAP SIDES 2 1 1.300 1.000 2.6000
A2 CAP BOTTOM 1 2 0.125 1.300 0.3250
A2 IP-BOTTOM 1 1 8.100 1.200 9.7200
A2 IP-SIDES 1 1 8.100 0.200 1.6200
A2 IP-SIDES 1 2 1.200 0.200 0.4800
A2 FLYWING WALL BTM 2 1 3.507 0.350 2.4549
A2 FLYWING WALL 2 2 3.000 1.000 12.0000
A2 FLYWING WALL 2 1 0.350 1.000 0.7000
A2 FLYWING WALL SLOPE AREA 4 0.5 3.000 1.818 10.9080
HANUCH 2 1 0.424 2.818 2.3897
A2 PEDESTALS 2 2 1.130 0.300 1.3560
A2 PEDESTALS 2 2 0.465 0.300 0.5580
OHE MAST 2 4 0.900 2.058 14.8176
OHE MAST 2 1 1.571 1.400 4.3974

P1 CAP BOTTOM 1 2 5.200 2.400 24.9600


P1 CAP BOTTOM 1 2 1.364 2.400 6.5472
IP BOTTOM 1 2 10.500 1.200 25.2000
IP BOTTOM 1 2 2.400 1.200 5.7600
IP SIDES 1 2 10.500 0.200 4.2000
IP SIDES 1 2 4.800 0.200 1.9200
CAP SIDES 1 2 5.200 0.200 2.0800
CAP SIDES 1 2 1.364 0.200 0.5456
CAP SIDES 1 2 8.100 0.800 12.9600
CAP SIDES 1 2 2.400 0.800 3.8400
PEDESTALS 2 1 1.130 0.300 0.6780
PEDESTALS 2 2 0.545 0.300 0.6540
PEDESTALS 2 2 1.130 0.300 1.3560
PEDESTALS 2 2 0.600 0.300 0.7200
OHE MAST 1 8 0.900 2.058 14.8176
OHE MAST 1 2 1.571 1.400 4.3974
DEDUCTION PIER AREA -1 1 3.000 2.000 -6.0000
DEDUCTION PIER AREA -1 1 3.141 1.000 -3.1410

P2 CAP BOTTOM 1 2 5.200 2.400 24.9600


P2 CAP BOTTOM 1 2 1.364 2.400 6.5472
IP BOTTOM 1 2 10.500 1.200 25.2000
IP BOTTOM 1 2 2.400 1.200 5.7600
IP SIDES 1 2 10.500 0.200 4.2000
IP SIDES 1 2 4.800 0.200 1.9200
CAP SIDES 1 2 5.200 0.200 2.0800
CAP SIDES 1 2 1.364 0.200 0.5456
CAP SIDES 1 2 8.100 0.800 12.9600
CAP SIDES 1 2 2.400 0.800 3.8400
PEDESTALS 2 1 1.130 0.300 0.6780
PEDESTALS 2 2 0.545 0.300 0.6540
PEDESTALS 2 2 1.130 0.300 1.3560
PEDESTALS 2 2 0.600 0.300 0.7200
OHE MAST 1 8 0.900 2.058 14.8176
OHE MAST 1 2 1.571 1.400 4.3974
DEDUCTION PIER AREA -1 1 3.000 2.000 -6.0000
DEDUCTION PIER AREA -1 1 3.141 1.000 -3.1410
BRIDGE-312
A1 CAP SIDES 1 1 8.100 0.800 6.4800
A1 CAP SIDES 1 1 6.800 1.000 6.8000
A1 CAP SIDES 2 1 1.300 1.000 2.6000
A1 CAP BOTTOM 1 2 0.125 1.300 0.3250
A1 IP-BOTTOM 1 1 8.100 1.200 9.7200
A1 IP-SIDES 1 1 8.100 0.200 1.6200
A1 IP-SIDES 1 2 1.200 0.200 0.4800
A1 FLYWING WALL BTM 2 1 3.769 0.400 3.0152
A1 FLYWING WALL 2 2 3.000 1.000 12.0000
A1 FLYWING WALL SIDE 2 1 0.400 1.000 0.8000
A1 FLYWING WALL SLOPE AREA 4 0.5 3.000 2.282 13.6920
HANUCH 2 1 0.424 3.282 2.7831
A1 PEDESTALS 2 2 1.255 0.300 1.5060
A1 PEDESTALS 2 2 0.560 0.300 0.6720
OHE MAST 2 4 0.900 2.522 18.1584
OHE MAST 2 1 1.571 1.400 4.3974

A2 CAP SIDES 1 1 8.100 0.800 6.4800


A2 CAP SIDES 1 1 6.800 1.000 6.8000
A2 CAP SIDES 2 1 1.300 1.000 2.6000
A2 CAP BOTTOM 1 2 0.125 1.300 0.3250
A2 IP-BOTTOM 1 1 8.100 1.200 9.7200
A2 IP-SIDES 1 1 8.100 0.200 1.6200
A2 IP-SIDES 1 2 1.200 0.200 0.4800
A2 FLYWING WALL BTM 2 1 3.507 0.350 2.4549
A2 FLYWING WALL 2 2 3.000 1.000 12.0000
A2 FLYWING WALL 2 1 0.350 1.000 0.7000
A2 FLYWING WALL SLOPE AREA 4 0.5 3.000 2.282 13.6920
HANUCH 2 1 0.424 3.282 2.7831
A2 PEDESTALS 2 2 1.255 0.300 1.5060
A2 PEDESTALS 2 2 0.560 0.300 0.6720
OHE MAST 2 4 0.900 2.522 18.1584
OHE MAST 2 1 1.571 1.400 4.3974
P1 CAP BOTTOM 1 1 10.500 5.300 55.6500
IP SIDES 1 2 10.500 0.200 4.2000
IP SIDES 1 2 5.300 0.200 2.1200
CAP SIDES 1 2 8.100 1.000 16.2000
CAP SIDES 1 2 2.900 1.000 5.8000
PEDESTALS 2 2 1.255 0.300 1.5060
PEDESTALS 2 2 1.090 0.300 1.3080
OHE MAST 1 8 0.900 2.522 18.1584
OHE MAST 1 2 1.571 1.400 4.3974
DEDUCTION PIER AREA -1 1 3.750 2.500 -9.3750
DEDUCTION PIER AREA -1 1 3.141 1.563 -4.9078

P2 CAP BOTTOM 1 2 5.200 2.400 24.9600


P2 CAP BOTTOM 1 2 1.364 2.400 6.5472
IP BOTTOM 1 2 10.500 1.200 25.2000
IP BOTTOM 1 2 2.400 1.200 5.7600
IP SIDES 1 2 10.500 0.200 4.2000
IP SIDES 1 2 4.800 0.200 1.9200
CAP SIDES 1 2 5.200 0.200 2.0800
CAP SIDES 1 2 1.364 0.200 0.5456
CAP SIDES 1 2 8.100 0.800 12.9600
CAP SIDES 1 2 2.400 0.800 3.8400
PEDESTALS 2 1 1.255 0.300 0.7530
PEDESTALS 2 2 1.090 0.300 1.3080
OHE MAST 1 8 0.900 2.522 18.1584
OHE MAST 1 2 1.571 1.400 4.3974
DEDUCTION PIER AREA -1 1 3.750 2.500 -9.3750
DEDUCTION PIER AREA -1 1 3.141 1.563 -4.9078
BRIDGE-303
A1 CAP SIDES 1 1 8.100 0.800 6.4800
A1 CAP SIDES 1 1 6.800 1.000 6.8000
A1 CAP SIDES 2 1 1.300 1.000 2.6000
A1 CAP BOTTOM 1 2 0.125 1.300 0.3250
A1 IP-BOTTOM 1 1 8.100 1.200 9.7200
A1 IP-SIDES 1 1 8.100 0.200 1.6200
A1 IP-SIDES 1 2 1.200 0.200 0.4800
A1 FLYWING WALL BTM 2 1 3.769 0.400 3.0152
A1 FLYWING WALL 2 2 3.000 1.000 12.0000
A1 FLYWING WALL SIDE 2 1 0.400 1.000 0.8000
A1 FLYWING WALL SLOPE AREA 4 0.5 3.000 2.282 13.6920
HANUCH 2 1 0.424 3.282 2.7831
A1 PEDESTALS 2 2 1.255 0.300 1.5060
A1 PEDESTALS 2 2 0.560 0.300 0.6720
OHE MAST 2 4 0.900 2.522 18.1584
OHE MAST 2 1 1.571 1.400 4.3974

A2 CAP SIDES 1 1 8.100 0.800 6.4800


A2 CAP SIDES 1 1 6.800 1.000 6.8000
A2 CAP SIDES 2 1 1.300 1.000 2.6000
A2 CAP BOTTOM 1 2 0.125 1.300 0.3250
A2 IP-BOTTOM 1 1 8.100 1.200 9.7200
A2 IP-SIDES 1 1 8.100 0.200 1.6200
A2 IP-SIDES 1 2 1.200 0.200 0.4800
A2 FLYWING WALL BTM 2 1 4.959 0.400 3.9672
A2 FLYWING WALL 2 2 3.000 1.000 12.0000
A2 FLYWING WALL 2 1 0.400 1.000 0.8000
A2 FLYWING WALL SLOPE AREA 4 0.5 3.000 3.949 23.6940
HANUCH 2 1 0.424 4.949 4.1968
A2 PEDESTALS 2 2 1.480 0.300 1.7760
A2 PEDESTALS 2 2 0.820 0.300 0.9840
OHE MAST 2 4 0.900 3.689 26.5608
OHE MAST 2 1 1.571 1.400 4.3974
P2 CAP BOTTOM 1 1 11.500 5.800 66.7000
IP SIDES 1 2 11.500 0.200 4.6000
IP SIDES 1 2 5.800 0.200 2.3200
CAP SIDES 1 2 9.100 1.000 18.2000
CAP SIDES 1 2 3.400 1.000 6.8000
PEDESTALS 2 2 1.480 0.300 1.7760
PEDESTALS 2 2 1.600 0.300 1.9200
OHE MAST 1 8 0.900 3.689 26.5608
OHE MAST 1 2 1.571 1.400 4.3974
DEDUCTION PIER AREA -1 1 3.750 2.500 -9.3750
DEDUCTION PIER AREA -1 1 3.141 1.563 -4.9078
TROLLEY REFUSE 0.0000
COLUMNS 4 4 0.300 3.889 18.6672
TIE BEAM BTM 1 2 1.300 0.300 0.7800
TIE BEAM BTM 1 2 1.600 0.300 0.9600
TIE BEAM 2 2 1.300 0.300 1.5600
TIE BEAM 2 2 1.600 0.300 1.9200
SLAB 1 1 3.700 2.700 9.9900
TIE BEAM 2 2 1.900 0.175 1.3300
TIE BEAM 2 2 3.000 0.175 2.1000
SALB SIDES 2 1 3.700 0.125 0.9250
TOTAL QTY 3527.3027
SCHEDULE - B6
Item No : 53 Approach slabs at formation level,dirtwall/ballast wall at formation level
SL LENGTH WIDTH HEIGHT QUANTIT
NO DESCRIPTION NOS NOS (M) (M) (M) Y (M3)
BRIDGE-362
A1DIRT WALL 1 1 7.850 1.818 14.2713
A1DIRT WALL 1 1 5.650 1.818 10.2717
A1DIRT WALL 1 2 0.350 1.818 1.2726
A2DIRT WALL 1 1 8.100 1.818 14.7258
A2DIRT WALL 1 1 6.800 1.818 12.3624
A2DIRT WALL 1 2 0.350 1.818 1.2726
BRIDGE-361
A1DIRT WALL 1 1 8.100 1.818 14.7258
A1DIRT WALL 1 1 6.800 1.818 12.3624
A1DIRT WALL 1 2 0.350 1.818 1.2726
A2DIRT WALL 1 1 8.100 1.818 14.7258
A2DIRT WALL 1 1 6.800 1.818 12.3624
A2DIRT WALL 1 2 0.350 1.818 1.2726
BRIDGE-360
A1DIRT WALL 1 1 8.100 2.282 18.4842
A1DIRT WALL 1 1 6.700 2.282 15.2894
A1DIRT WALL 1 2 0.350 2.282 1.5974
A2DIRT WALL 1 1 8.100 2.282 18.4842
A2DIRT WALL 1 1 6.700 2.282 15.2894
A2DIRT WALL 1 2 0.350 2.282 1.5974
BRIDGE-346
A1DIRT WALL 1 1 8.100 1.818 14.7258
A1DIRT WALL 1 1 6.800 1.818 12.3624
A1DIRT WALL 1 2 0.350 1.818 1.2726
A2DIRT WALL 1 1 8.100 1.818 14.7258
A2DIRT WALL 1 1 6.800 1.818 12.3624
A2DIRT WALL 1 2 0.350 1.818 1.2726

BRIDGE-334
A1DIRT WALL 1 1 8.100 3.689 29.8809
A1DIRT WALL 1 1 6.700 3.689 24.7163
A1DIRT WALL 1 2 0.400 3.689 2.9512
A2DIRT WALL 1 1 8.100 2.282 18.4842
A2DIRT WALL 1 1 6.800 2.282 15.5176
A2DIRT WALL 1 2 0.350 2.282 1.5974

BRIDGE-330
A1DIRT WALL 1 1 8.100 2.282 18.4842
A1DIRT WALL 1 1 6.700 2.282 15.2894
A1DIRT WALL 1 2 0.350 2.282 1.5974
A2DIRT WALL 1 1 8.100 2.282 18.4842
A2DIRT WALL 1 1 6.700 2.282 15.2894
A2DIRT WALL 1 2 0.350 2.282 1.5974
BRIDGE-327
A1DIRT WALL 1 1 7.850 1.818 14.2713
A1DIRT WALL 1 1 5.850 1.818 10.6353
A1DIRT WALL 1 2 0.350 1.818 1.2726
A2DIRT WALL 1 1 7.850 1.818 14.2713
A2DIRT WALL 1 1 5.850 1.818 10.6353
A2DIRT WALL 1 2 0.350 1.818 1.2726
BRIDGE-314
A1DIRT WALL 1 1 8.100 1.818 14.7258
A1DIRT WALL 1 1 6.800 1.818 12.3624
A1DIRT WALL 1 2 0.350 1.818 1.2726
A2DIRT WALL 1 1 8.100 1.818 14.7258
A2DIRT WALL 1 1 6.800 1.818 12.3624
A2DIRT WALL 1 2 0.350 1.818 1.2726
BRIDGE-312
A1DIRT WALL 1 1 8.100 2.282 18.4842
A1DIRT WALL 1 1 6.700 2.282 15.2894
A1DIRT WALL 1 2 0.350 2.282 1.5974
A2DIRT WALL 1 1 8.100 2.282 18.4842
A2DIRT WALL 1 1 6.800 2.282 15.5176
A2DIRT WALL 1 2 0.350 2.282 1.5974
BRIDGE-303
A1DIRT WALL 1 1 8.100 2.282 18.4842
A1DIRT WALL 1 1 6.700 2.282 15.2894
A1DIRT WALL 1 2 0.350 2.282 1.5974
A2DIRT WALL 1 1 8.100 3.689 29.8809
A2DIRT WALL 1 1 6.800 3.689 25.0852
A2DIRT WALL 1 2 0.400 3.689 2.9512
BRIDGE-296
A1DIRT WALL 1 1 8.100 3.689 29.8809
A1DIRT WALL 1 1 6.800 3.689 25.0852
A1DIRT WALL 1 2 0.400 3.689 2.9512
A2DIRT WALL 1 1 8.100 3.689 29.8809
A2DIRT WALL 1 1 6.800 3.689 25.0852
A2DIRT WALL 1 2 0.400 3.689 2.9512
TOTAL QTY 791.4243
el

GRADE REMARKS
0.000
RAMNA-SINGRAULI DOUBLING WORK PROJECT UNDER DHANABAD DIVISION AT EAST CENTRAL RAILWAY
SCH-C1(1) CEMENT
SL ITEM LENGTH WIDTH HEIGHT QUANTITY
NO DESCRIPTION NO (M) (M) (M) (M3) GRADE REMARKS
SCH-C1(1)
BRG-362 -P3 PIER PCC 1 12.804 320 1000 4.097 C1-1
BRG-360 -A1 ABUTEMENT PCC 1 14.774 320 1000 4.728 C1-1
BRG-362 -P3 PIER RAFT 1 212.875 440 1000 93.665 C1-1
BRG-360 -A1 ABUTEMENT RAFT 1 314.215 440 1000 138.255 C1-1
BRG-361 -A2 ABUTEMENT PCC 1 13.313 320 1000 4.260 C1-1
362-A2 PCC 1 12.376 320 1000 3.960 C1-1
361-A2 ABUTMENT RAFT 1 269.924 440 1000 118.767 C1-1

TOTAL QTY 367.732


RAMNA-SINGRAULI DOUBLING WORK PROJECT UNDER DHANABAD DIVISION AT EAST CENTRAL RAILWA
SCH-C2
SL ITEM LENGTH WIDTH HEIGHT QUANTITY
NO DESCRIPTION NO (M) (M) (M) (M3) GRADE REMARKS
SCH-C2 8MM 10MM 12MM 16MM 20MM 25MM 32MM
BRG-362 -P3 RAFT 1874.446 0.000 520.589 5916.151 0 15150.442
362-SHAFT 1856.989 1860.556 13009.553
362-B/RWALL 690.999 2790.456 3481.455
362-A2 RAFT 5286.802 572.776 0.000 11606.484 19398.687
361-A2 RAFT 7922.280 595.499 0.000 19805.437 10718.867
361-A2SHAFT 0.000 0.000 9014.964
361-A1 RAFT 9067.741 587.420 13039.276 7404.391
361-A1 SHAFT 7500.000 4200
360A2 RAFT 9552.937 820.118 9717.322 4030.816 23844.176
360A2 SHAFT 3385.696 9161.741
360A1 RAFT 9552.937 820.118 9717.322 4030.816 23844.176
360A1 SHAFT 3385.696 9161.741
360A1 SHAFT 895.056 575.673 4717.572
330A2 RAFT 9552.937 0.000 820.118 9717.322 4030.816 23844.176
330 A2 SHAFT 2898.677 11270.276
330-P1RAFT 10522.768 941.618 10400.703 21824.319
330-P1 SHAFT 10795.23
330-B/RWALL 3769.324
312-P1 SHAFT 4095.967 5502.959 412.047 8388.178
70871.859 5502.959 15086.312 55607.393 84194.496 208610.589
Total Qty in kgs
TOTAL
23461.628
16727.098
6962.910
36864.749
39042.083
9014.964
30098.828
11700.000
47965.369
12547.437
47965.369
12547.437
6188.301
47965.369
14168.953
43689.408
10795.230
3769.324
18399.151
439873.608
8TH AC BILL (DEATILED)
RAMNA-SINGRAULI DOUBLING WORK PROJECT UNDER DHANABAD DIVISION AT
CENTRAL RAILWAY
SL LENGTH WIDTH HEIGHT QUANTITY
NO DESCRIPTION ITEM NO (M) (M) (M) (M3)
SCH-A1

1 362 A2SIDE 1 238.20

2 361 A2 SIDE

3 360 A1 SIDE

4 334A1 SIDE

5 334A2 SIDE

6 330A1 SIDE

7 330A2 SIDE

8 314A1 SIDE

9 314A2 SIDE

TOTAL QTY 0.000

SCH-A2-SLIPFORM
#REF!
TOTAL
SCH-B1(1) EARTHWORK FILLING QTY

334A1 SIDE (CH 122+920 TO 990) 12444.807


1
334A2 SIDE (CH123+050 TO 080) 1495.528
2
360A2 Side 7863.000
3
21803.335
TOTAL QTY

SCH-B2(1) -PCC
10.471
1 346-P1 1 11.700 8.950 0.100
8.160
2 330A2 RWALL PCC 1 24.000 3.400 0.100
TOTAL QTY 18.631
SCH-B6(31)- EARTHWORK
1 346-P1 1 20.439 17.689 1.119 404.569
2 330-RWALL 1 24.000 3.400 1.750 142.800
TOTAL QTY 547.369
SCH-B6(33)- HARD ROCK
1 330-RWALL 1 29.00 0.60 0.50 8.700
2 346-P1 1 16.290 13.540 7.180 1583.668
1592.368
SCH-B6(35/30)-RAFT
1 346-P1 1 11.500 8.750 1.800 181.125
2 303-P2 RAFT 1 19.500 17.000 1.500 497.250
3 303-P2 RAFT 0.267 331.500 112.500 193.115 169.897
4 362-RWALL 1 17.000 4.400 0.600 44.880
5 362-RWALL 1 17.000 0.500 0.600 5.100
6 330-RWALL 1 24.000 3.200 0.500 38.400
7 330-RWALL 1 24.000 0.500 0.500 6.000
Total qty 942.652
SCH-B6(37)-SHAFT
1 334-A1 2 2.580 1.300 6.950 46.620
2 334-A1-2ND BRACING 1 3.590 1.100 0.800 3.159
3 334-A1-3RD BRACING 1 2.581 1.100 0.800 2.271
4 361-A1 2 4.353 1.300 4.428 50.115
5 361-A1-1ST BRACING 1 4.177 1.100 0.800 3.675
6 361-A1-2ND BRACING 1 3.252 1.100 0.800 2.861
TOTAL QTY 108.701
SCH-B6(38)-R/WALL
1 362/A2 RWALL 1 60.000 0.450 5.150 139.050
2 362/A2 RWALL -1 31.000 0.425 3.000 -39.525
3 330/A2 RWALL 1 24.000 0.412 3.000 29.664
TOTAL QTY 129.189
SCH-B6(39)-CAPS
6 330 A2 CAP 1 8.100 1.300 1.000 10.530
7 330A2 IP 1 8.100 1.200 0.200 1.944
8 330 A2 PEDESTALAS 2 1.255 0.560 0.300 0.421
Total qty 12.895
SCH-B6(41) 10.0m to 11.0M LEVEL
11.0M TO 12.0M LEVEL 0.000
12.0m to 13.0M LEVEL 0.000
13.0M TO 14.0M LEVEL 0.000
14.0M TO 15.0M LEVEL
GRAND TOTAL QTY #REF!

SCH-B6(50)-SHUTTERING FOR RAFTS


1 346/P1 PCC 2 11.700 0.100 2.340
2 346/P1 PCC 2 8.950 0.100 1.790
3 346/P1 RAFT 2 11.500 1.800 41.400
4 346/P1 RAFT 2 8.750 1.800 31.500
5 330 /A2 RWALL PCC 2 24.000 0.100 4.800
6 330 /A2 RWALL PCC 2 3.400 0.100 0.680
7 330 /A2 RWALL RAFT 2 24.000 0.500 24.000
8 330 /A2 RWALL RAFT 2 3.200 0.500 3.200
9 303/P2 RAFT 2 19.500 1.500 58.500
10 303/P2 RAFT 2 17.000 1.500 51.000
TOTAL RAFTS QTY 219.210
SCH-B6(51)-SHUTTERING FOR SHAFTS
1 361-A1 WALL 4 3.714 4.428 65.782
2 361-A1 WALL 4 1.3 4.428 23.025
3 361-A1-1ST BRACING 2 1.1 0.8 1.760
4 BOTTOM 1 4.279 1.1 4.707
5 361-A1-2ND BRACING 2 1.1 0.8 1.760
6 BOTTOM 1 3.354 1.1 3.689
362/A2 RWALL 2 60.00 5.150 618.000
362/A2 RWALL 2 0.450 5.150 4.635
DEDUCTION -2 31.00 3.000 -186.000
DEDUCTION -2 0.425 3.000 -2.550
7 334/A1 SHAFT 4 2.580 6.950 71.724
8 334/A1 SHAFT 4 1.300 6.950 36.140
9 334/A1 (2ND BRACING) 2 1.100 0.800 1.760
10 334/A1 2ND BRACING BOTTOM) 1 3.720 1.100 4.092
11 334/A1 (3RD BRACING) 2 1.100 0.800 1.760
12 334/A1 (3RD BRACING BOTTOM) 1 2.711 1.100 2.982
13 330/A2 RWALL 2 24.000 3.000 144.000
14 330/A2 RWALL 2 0.413 3.000 2.478
TOTAL SHAFTS QTY 799.745
SCH-B6(52)-SHUTTERING FOR CAPS
1 330/A2 CAP BOTTOM 1 8.100 1.200 9.720
2 IP SIDES 1 8.100 0.200 1.620
3 IP SIDES 2 1.200 0.200 0.480
4 CAP SIDES 1 8.100 0.800 6.480
5 CAP SIDES 1 7.400 1.000 7.400
6 CAP SIDES 2 0.424 1.000 0.848
7 CAP SIDES 2 1.300 1.000 2.600
8 A2 PEDESTALS 4 1.255 0.300 1.506
9 A2 PEDESTALS 4 0.560 0.300 0.672
TOTAL CAPS& DIRTWALLS QTY 31.326
SCH-B6 (58)
PROVINDING LAYING GRANULAR
334A1 SIDE 2015.193
334A2 1037.472
Total qty 3052.665
Qty Per Cum Qty (MT)
SCH-C1(1)-CEMENT Nos Cement
1 PCC 1 18.631 320 1000 5.961
2 RAFT 1 848.272 440 1000 373.239
3 RAFT-M30 1 94.380 408 1000 38.507
4 BRWALL-M30 1 129.189 408 1000 52.709
5 SHAFT 1 108.701 440 1000 47.828
6 CAPS 1 12.895 440 1000 5.673
Total Qty in MT 523.917
SCH-C2
SCH-C2-STEEL 8MM 10MM 12MM 16MM 20MM
1 362/A2 RWALL-17M-5 0.000 4695.570 0.000 779.134 2877.023
2 361/A1 SHAFT 1407.963 156.334
3 346 RAFT 0 2670.179 0.000 678.098 0.000
4 346SHAFT
5 330/A2 CAP 182.835 440.828 616.521 1983.549 379.310
6 330A2 RWALL 0.000 2605.906 96.858 1410.121 0.000
7 330A2 RWALL 0.000 2605.906 96.858 1410.121 0.000
8 334/A1 SHAFT 0 188.352 176.534 0.000 0.000
9 314/A2 SHAFT 1334.201 1453.855
10 303P2 RAFT 0 10226.109 0.000 851.337 19001.484
11 303P2 SHAFT
12 303 P2 BRWALL 5223.521
Total Qty in kgs
DHANABAD DIVISION AT EAST

GRADE REMARKS

211.259 204.079 7.18

M-15

M-15

B6-31 404.569 20.4395 17.6895


B6-31
B6-33 16.29 13.54

B6-35
B6-35
B6-35 667.148
B6-35

848.272

B6-37 1.45+3.71 4.21


3.46+3.72
2.711+2.452
B6-37 4.428+4.279 401.833 0.255 0.344
4.279+4.075
3.15+3.354
1.0M 1.35M
24.127
60 67.207
91.334 0.6
(0.5+0.325)/2

1212.068
5.15

B6-50
B6-50
B6-50
B6-50

2X2

3.46+3.72

2.711+2.452

1620.36 628.272
2248.632 1620.35
80.036 7.85 628.2826 2248.633
#REF!

C1-1 11.52
C1-1 138.16
523.918

25MM 32MM TOTAL


0.000 0.000 8351.727 5863.667 33.95
13411.269 2051.019 17026.585
4949.3172 8147.255 16444.849
11691.676 11691.676
0 0 3603.043
0 0 4112.885
0 0 4112.885
3198.0208 0 3562.907
2788.056
0.000 49288.684 79367.614
9899.360 9899.360
5223.521
166185.107