INSPECTION & TESTING REQUIREMENTS REVISION: 12/31/2018 CODE NUMBER: PAGE:

SAUDI ARAMCO FORM-175 REPLACES: 10/31/2016 IR150200 1 of 2


SCOPE: Medium Voltage Power Cable: Solid Dielectric Insulated Cables for Rated Voltages of 5kV through 35kV .

TEST AND INSPECTION PER: 15-SAMSS-502, IEC 60502-2, AEIC CS8, and Specifications As Noted Below.

(1).VISUAL INSPECTION BY BUYER INSPECTION REPRESENTATIVE


(2) REVIEW AND VERIFICATION OF MATERIAL CERTIFICATES AND INSPECTION RECORDS
(3) SUBMISSION OF MANUFACTURING, INSPECTION AND QUALITY RECORDS
0010
0010
*** R
Pre-Fabrication/Production Requirements
Design Type Test
Specification Details / Notes:
Design type test or Saudi Aramco approved third party type test
certificates.

0020 X Material Test reports

0020 *** In process inspection & test requirement Specification Details / Notes:
0030
0010
***
W
Final inspection & test requirements
General Description
Specification Details / Notes:
Minimum cable requirements as per Purchase Order (PO),
15-SAMSS-502

0020 H R Routine / Production Test Per (A) IEC 60502-2, or (B) AEIC CS8

0030 Construction: The construction shall meet all requirements listed in


15-SAMSS-502 section 6,7 and 8

0040 W a) Conductor Shall be stranded annealed copper in accordance with (A) IEC
60228 Class 2 or (B) ASTM B8 Class B or ASTM B496.

0050 W b) Conductor Shield Shall be extruded semicon, bonded to the insulation, in


accordance with (A) IEC , 60502-2, or (B) AEIC CS8

0060 W c) Insulation Shall be XLPE or EPR in accordance with (A) IEC 60502-2, or
(B) AEIC CS8

0070 W d) Insulation Semicon Shield Shall be extruded semicon in accordance with (A) IEC 60502-2,
Or (B) AEIC CS8

0080 W e) Insulation Metallic Shield Shall be copper tape(s), 0.1 mm min. thickness, 10% overlap.

0090 W f) Metal Armor or Sheath If specified, shall be (A) galvanized steel double tape or steel
wire armor (Aluminum for 1/c cables), or (B) Impervious
aluminum or interlocked steel sheath.

0100 W g) Outer Jacket Shall be sunlight and oil resistant; see 15-SAMSS-502 section 6
& 7 for details.

0110 W Shipping Per 15-SAMSS-502.

IR150200 Continued...
INSPECTION & TESTING REQUIREMENTS REVISION: 12/31/2018 CODE NUMBER: PAGE:
SAUDI ARAMCO FORM-175 REPLACES: 10/31/2016 IR150200 2 of 2
(1).VISUAL INSPECTION BY BUYER INSPECTION REPRESENTATIVE
(2) REVIEW AND VERIFICATION OF MATERIAL CERTIFICATES AND INSPECTION RECORDS
(3) SUBMISSION OF MANUFACTURING, INSPECTION AND QUALITY RECORDS
0120 W X Nameplates, marking and labeling Per 15-SAMSS-502.

0130 R X Product test certificates and records

0140 R X Certificate of Compliance

Notes:
(1) Refer detailed instruction sheet SA175 form IR000003 of inspection requirement for ideal use of this form.
(2) May only be waived by the responsible Saudi Aramco, ASC, AOC Inspection Offices.
(3) If the cable is buried under water table, sabkah area then water protection requirement, according to15-SAMSS-502 Section 8.

End of IR150200