Professional Documents
Culture Documents
ELECTRICAL SYSTEM
20 OF 99
A 320 pilots QUESTIONNAIRE
A. AC BUS 1.
B. AC BUS 2.
C. STATIC INVERTER.
A. THE APU.
B. THE OTHER COMPUTER.
C. IS NOT REPLACED.
A. SPEED.
B. VOLTAGE.
C. FREQUENCY.
D. THE GENERATOR.
A. SHED.
B. SUPPLIED BY STATIC INVERTER WHEN L/G IS DOWN.
C. SUPPLIED BY STATIC INVERTER WHEN L/G IS UP.
21 OF 99
A 320 pilots QUESTIONNAIRE
A. ALWAYS.
B. WHEN A/C IS IN FLIGHT AND ON BATTERIES ONLY.
C. WHEN ONE MAIN GENERATOR FAILS.
11. THE EXTERNAL POWER HAS PRIORITY OVER THE APU GEN:
A. YES.
B. NO.
A. HOT BUS 2.
B. ESS TR.
C. BOTH.
A. EMER GEN.
B. AC BUS 2.
C. STATIC INVERTER.
22 OF 99
A 320 pilots QUESTIONNAIRE
A. YES.
B. NO.
15. WHEN YOU WANT TO CHECK BATTERY VOLTAGE YOU MUST SET THE
BAT P/B TO?
A. AUTO POSITION.
B. OFF POSITION.
C. ON POSITION.
A. AC BUS 1.
B. AC BUS 2.Atomatically if AC Bus 1 fail
C . BOTH A & B .are correct
A. 22 V.
B. 25 V.
C. 27.5 V.
19. ON GROUND WHAT HAPPENS WHEN THE “RAT AND EMER GEN MAN ON
P/B IS PRESSED IN”?
20. GEN 1 & GEN 2 WHEN OPERATING HAVE PRIORITY OVER APU GEN:
A. YES.
B. NO.
21. IN CASE OF TOTAL ELECTRICAL LOSS THE AC ESS BUS IS SUPPLIED BY:
A. STATIC INVERTER.
B. EMER GEN.
C. BOTH.
23 OF 99
A 320 pilots QUESTIONNAIRE
A. TO BE CONNECTED IN PARALLEL.
B. TO BE SUPPLIED BY ANY GENERATOR OR EXTERNAL POWER
C. TO BE SUPPLIED BY APU GEN OR EXT PWR ONLY.
24. IN FLIGHT, ON BATTERIES ONLY, THE AC ESS SHED BUS AND THE DC
ESS SHED BUS ARE LOST:
A. YES.
B. NO.
A. YES.
B. NO.
A. YES.
B. NO
24 OF 99
A 320 pilots QUESTIONNAIRE
ANSWERS
25 OF 99