Professional Documents
Culture Documents
Electrical Equipment-2
<contents>
1、Equipment arrangement-Pump room
2、Pump room electric arrangement
3、Pump proportion valve
4、High pressure sensor
5、Hyd, temperature sensor
6、SOL block
7、Travel straight unload SOL
8、Radiator coolant level SW
1
1、Arrangement
SV・PSV
2
2、Main pump equipment
PSV-P1: PSV-P2:
Pump proportion valve Pump proportion valve
SE-23:
High pressure sensor
3
3-1、Pump proportional valve
4
3-2、Change of pump proportional valve
YN35V00052F1 → YN35V00052F2
<Back ground>
Big pulse generation is done to the second pump
proportion valve pressure at the high temperature.
5
4、High Pressure sensor
6
5-1、Warning Hyd. Temp (running change)
Externals
Resistivity
Suction line
8
6-1、SOL Block
Lever lock
Arm 2 speed
Swing parking
T2
P2 P1
11
8、Coolant level switch
*13t・・・N/A
・Observational coolant level in Radiator *80t・・・Equipped sub tank
To controller
To ground