You are on page 1of 53

Control Valve KVMG270

Solar V Excavator

Feb, 2009
Overseas Product Support Team
Text No. HYD0006
KVMG270 Control Valve

Applied Model : S225LC-V


S255LC-V
S300LC-V
S340LC-V

2
KVMG270 Diagram

3
KVMG270 Schematic

1.2. Check valve


3. Check valve for parallel line
4. Swing priority valve
5. Check valve before SP valve
6. Drain orifice
7. Arm regeneration valve
8. Orifice check valve for travel
9. Boom priority valve
10. Check valve for arm 2 spool
11. PA/PT Orifice
12.13. Holding valve
14. Negacon (Foot relief) valve
15. Main relief valve

4
KVMG270 Parts location

1.2 Check valve

Fr
on
t

5
KVMG270 Parts location

3. Check valve for parallel line


Fr
on
t

6
KVMG270 Parts location

4. Swing priority valve


Fr
on
t

7
KVMG270 Parts location

5. Check valve before SP valve


Fr
on
t

8
KVMG270 Parts location

6. Drain orifice

Fr
on
t

9
KVMG270 Parts location

7. Arm regeneration valve

Fr
on
t

10
KVMG270 Parts location

8. Orifice check valve for travel

Fr
on
t

11
KVMG270 Parts location

9. Boom priority valve

Fr
on
t

12
KVMG270 Parts location

10. Check valve for arm 2 spool

Fr
on
t

13
KVMG270 Parts location

11. PA/PT orifice

Fr
on
t

14
KVMG270 Parts location

12. Boom holding valve

Fr
on
t

15
KVMG270 Parts location

13. Arm holding valve

Fr
on
t

16
KVMG270 Parts location

14. Negacon (Foot relief) valve

Fr
on
t

17
KVMG270 Parts location

15. Main relief valve

• Setting pressure
- Normal working :330 bar
- Pressure up ( Boost press.) : 350 bar

Fr
on
t

18
SPOOL ARRAY ON KVMG270

19
Location on Hydraulic Circuit

1. Check valve for main relief


2. Check valve for main relief
3. Check valve to parallel line
4. Swing Priority(SP) valve
5. Check valve before SP
6. Orifice in SP drain
7. Arm Regeneration valve
8. Orifice Check valve for travel
9. Boom Priority(BP) valve
10. Check valve to Arm 2 parallel
11. PA, PT orifice
12. Boom Lock valve
13. Arm Lock valve
14. Foot Relief valve

20
0. Spool Array

Arm 1 Arm 2

Boom 2 Boom 1

Swing Bucket

Option Travel(L)

Travel (R) Travel Straight

21
1 & 2. Check valves for main relief

Main relief

22
3. Check valve to parallel line

23
4. Swing Priority valve

24
5. Check valve before SP

25
6. Orifice in SP drain

26
7. Arm Reneration valve

27
8. Orifice Check valve for travel

28
9. Boom Priority valve

29
10. Check valve to Arm 2 parallel line

30
11. PA, PT Orifice

1.0

0.8 0.8

31
12. Boom Lock valve

32
13. Arm Lock valve

33
14. Foot Relief valve

34
15. Load Check valves (1/2)

Dummy

35
15. Load Check valves (2/2)

36
16. Sectional Drawing (1/3)

37
16. Sectional Drawing (2/3)

38
16. Sectional Drawing (3/3)

39
Principle of Operation

40
Boom down logic (Regeneration)

41
Arm crowd logic I

42
Arm crowd logic II (Regeneration)

43
Holding valve (Lock)

44
Holding valve (Release)

45
Boom priority valve

46
Swing priority I (Off position)

47
Swing priority II (On position)

48
Main relief valve I

Normal pressure

Boost pressure

49
Main relief valve II

50
Negacon valve (Foot relief valve)

51
PA/PT Orifice

Front attach

Travel
T/S Valve

52
END OF DOCUMENT

53

You might also like