Professional Documents
Culture Documents
Solar V Excavator
Feb, 2009
Overseas Product Support Team
Text No. HYD0006
KVMG270 Control Valve
2
KVMG270 Diagram
3
KVMG270 Schematic
4
KVMG270 Parts location
Fr
on
t
5
KVMG270 Parts location
6
KVMG270 Parts location
7
KVMG270 Parts location
8
KVMG270 Parts location
6. Drain orifice
Fr
on
t
9
KVMG270 Parts location
Fr
on
t
10
KVMG270 Parts location
Fr
on
t
11
KVMG270 Parts location
Fr
on
t
12
KVMG270 Parts location
Fr
on
t
13
KVMG270 Parts location
Fr
on
t
14
KVMG270 Parts location
Fr
on
t
15
KVMG270 Parts location
Fr
on
t
16
KVMG270 Parts location
Fr
on
t
17
KVMG270 Parts location
• Setting pressure
- Normal working :330 bar
- Pressure up ( Boost press.) : 350 bar
Fr
on
t
18
SPOOL ARRAY ON KVMG270
19
Location on Hydraulic Circuit
20
0. Spool Array
Arm 1 Arm 2
Boom 2 Boom 1
Swing Bucket
Option Travel(L)
21
1 & 2. Check valves for main relief
Main relief
22
3. Check valve to parallel line
23
4. Swing Priority valve
24
5. Check valve before SP
25
6. Orifice in SP drain
26
7. Arm Reneration valve
27
8. Orifice Check valve for travel
28
9. Boom Priority valve
29
10. Check valve to Arm 2 parallel line
30
11. PA, PT Orifice
1.0
0.8 0.8
31
12. Boom Lock valve
32
13. Arm Lock valve
33
14. Foot Relief valve
34
15. Load Check valves (1/2)
Dummy
35
15. Load Check valves (2/2)
36
16. Sectional Drawing (1/3)
37
16. Sectional Drawing (2/3)
38
16. Sectional Drawing (3/3)
39
Principle of Operation
40
Boom down logic (Regeneration)
41
Arm crowd logic I
42
Arm crowd logic II (Regeneration)
43
Holding valve (Lock)
44
Holding valve (Release)
45
Boom priority valve
46
Swing priority I (Off position)
47
Swing priority II (On position)
48
Main relief valve I
Normal pressure
Boost pressure
49
Main relief valve II
50
Negacon valve (Foot relief valve)
51
PA/PT Orifice
Front attach
Travel
T/S Valve
52
END OF DOCUMENT
53