You are on page 1of 22

DHIM C/S

Inner parts location of KVMG270

New Solar V

Customer Support Team, DHIM


Preface DHIM C/S

Effective Model
-S225LC-V
-S225NLC-V
-S255LC-V
-S255NLC-V
-S300LC-V
-S340LC-V
Location on Hydraulic Circuit DHIM C/S

1. Check valve for main relief


2. Check valve for main relief
3. Check valve to parallel line
4. Swing Priority(SP) valve
5. Check valve before SP
6. Orifice in SP drain
7. Arm Regeneration valve
8. Orifice Check valve for travel
9. Boom Priority(BP) valve
10. Check valve to Arm 2 parallel
11. PA, PT orifice
12. Boom Lock valve
13. Arm Lock valve
14. Foot Relief valve
0. Spool Array DHIM C/S

Arm 1 Arm 2

Boom 2 Boom 1

Swing Bucket

Option Travel(L)

Travel (R) Travel Straight


1 & 2. Check valves for main relief DHIM C/S

Main relief
3. Check valve to parallel line DHIM C/S
4. Swing Priority valve DHIM C/S
5. Check valve before SP DHIM C/S
6. Orifice in SP drain DHIM C/S
7. Arm Regeneration valve DHIM C/S
8. Orifice Check valve for travel DHIM C/S
9. Boom Priority valve DHIM C/S
10. Check valve to Arm 2 parallel line DHIM C/S
11. PA, PT Orifice DHIM C/S
12. Boom Lock valve DHIM C/S
13. Arm Lock valve DHIM C/S
14. Foot Relief valve DHIM C/S
15. Load Check valves (1/2) DHIM C/S

Dummy
15. Load Check valves (2/2) DHIM C/S
16. Sectional Drawing (1/3) DHIM C/S
16. Sectional Drawing (2/3) DHIM C/S
16. Sectional Drawing (3/3) DHIM C/S