PT KARTIKA SAMUDERA ADIJAYA (KSA)

FORM 01 - TECH 02 - REPAIR LIST (DRAFT) - REV 0


DOCKING AND DAMAGE REPAIR LIST
Name of Vessel / Nama Kapal Vessel size / Ukuran Dimensi Kapal Docking Type / Tipe Client / Pencharter Vessel Location / Lokasi Kapal
Pengedokan
LOA 26,25 M Special Survey
:
LBP
:
M Intermediate
Samarinda
Breath : 8.00 M Emergency
Depth : 3,80 M
Vessel Type / Tipe Kapal Draft reading
Tug Boat / Kapal Tunda PS SB Trim
Barge / Tongkang IMO Number BKI
Motor Tanker / Kapal Tanker
Floating Crane
* Coret yang tidak perlu / cross if not ncessary

Description (Condition)/Uraian (Kondisi)


No Equipment Name & Specification / Nama Peralatan Quantity & Dimension / Jumlah & Ukuran Photo reference / Referensi foto Remarks / Keterangan
& Specifikasinya
I Dry-docking
1 Docking and undocking 1 Ea
2 Each subsequent day dock hire 35 Days
3 Installation keel block 1 Ea
4 Tugboat assistance 1 Ea
5 Mooring and un mooring 1 Ea
6 Wharferage 1 Days
7 Open Manhole cover with cement 4 Pcs
8 open MH cover without cemet 2 Pcs
9 Fireline and fireman watch 35 Days
10 Security guard 35 Days
11 1 Set safety ladder acces to vessel 1 Ea
12 Tank gas free 6 Tank
II Hull preparation, painting and protection A ( M2 )
1 To hard scraped the hull below water line. 163,2 Sqm

2 HPFW to 3,000 PSI ( Complete hull exclude main deck) 347,2 Sqm

3 Underwater Hull: Grit blast & Painting (SA2.0) 163,2 Sqm


4 Topside Hull: Grit blast & Painting (SA2.0) 184 Sqm
5 3 layer painting (primer, sealer, an AF) 163,2 Sqm
6 Hull above water line 2 layer 184 Sqm
7 Painting plimsol 2 Set
8 Painting draught mark 4 Set
9 Cut old anode, and install new anode 44 Pcs

III Hull & Outfitting to replacement and maintenance L ( mm ) B ( mm ) T ( mm ) W ( Kg )


1 UT hull plate port side & starboard
2 Ut plat maindeck

3 Estimation for replating for UW area and other 10,000


4 Internal estimation 30% 3000

IV Windlass, anchor, Towing hook and chain lockers


1 Kalibarasi rantai jangkar kanan & kiri
2 Blasting jngkar dan rantai jangkar kanan & kiri
3 Instal permanent stopper chain
4 Build up gypsi
5 Service hand pump chain locker
6 Service towing hook
7 Timbang jangkar kanan & kiri
V Tanks
1 Ganti karet manhole 5 Tanki By crew
Crew
2 Cleaning tanki ballast water after peak & forepeak 3 Tanki

3 Cleaning tanki fuel daily dan storage 4 Tanki


4 Lengkapi baut manhole M19 40 Pcs Yard
5 Cleaning chain locker 2 Pcs
6 Cleaning FW tank dibawah crew room 2 Set

VI Watertight

1 Service
room
handle watertight door engine & akomodasi

2 Service handle cover emergency escape engine room


3 Ganti baru rubber watertight
4 Repair plate strip pintu yang keropos 25 mm x 2000 mm

5 Repair plate strip cover emergency escape yang keropos 25 mm x 4000 mm

VII Bollards
1 Perawatan bollard Good condition

VIII Steering gear


1 Ganti Limit switch kemudi 2 Pcs Rusak
2 Cleaning steering room 1 Ea
3 Ganti ramesh packing tube rudder 2 Set
4 Ganti stifner steering room yang keropos 1 Ea Keropos (AB Press) 400x15000 mm x 8 mm
5 Ganti bracket stiffner yang keropos
6 Ganti tangga steering room yang keropos 1 Set Tangga posisinya untuk dipindah tidak sejajar stiffener)

IX Bulwarks
1 Maintenance by crew kapal Good condition

X Fender and collision protection


1 Fabrikasi dan install box pushtug 1 Ea

XI Main mast, railing, and seating


1 Maintenance by crew

XII Main deck


1 UT maindeck 300 Spot (including deck, lambung and hatch)
2 Blasting & painting maindeck
3 Install fender tyre deck
- Suply fender 10 Pcs
- Suply galvanized 5/8 chain 15 Meter
Suply segel 3/4 8 Pcs
- Suply fgalvanized 3/4 chain 14 Meter
- Suply shackle 5/8 chain fender 20 Pcs
4 push pad area
- Install pad eye Push pad
5 Deck opening emergency escape E/R 1 Set
- Service togle
- Install rubber packing 40 x 40 mm
- Service hinge
6 Maind deck opening Emergency escape 1 Set
- Service togle
- Install rubber packing 40 x 40 mm

XIII Superstructure corrotion and protection


1 Zinch Anode
- Dismantle old anode 1 Set (Number off anode as per existing)
- Install new anode 1 Set (Total anode as per standart)

XIV Electrical equipment and ligthning


1 Megger test 1 Lot
XIV

- Bilges and GS pump elmot 2 Lot


- FO Pump Elmot 1 Lot
- Hydraulic steering 1 Lot
- Generator P and S 2 Lot
2 Check and replace if necessary emergency light 1 Lot
3 Check and replace if necessary lighting 1 Lot
4 Renew engine room lighting 10 Pcs Perlu pengantian lampu kamar mesin

5 Install new wire mast head 1 Set

XV Propeller and shafting


1 Propeller shaft port and starboard
a Dismantle shaft propeller P 1 Set
- Check tail shaft clearance with bearing, renew if
needed
- NDT tail shaft and intermediate shaft key
b Dismantle shaft propeller S 1 Set
- Check tail shaft clearance with bearing, renew if
needed
- NDT tail shaft and intermediate shaft key
2 Propeller blade 2 Set
- Dismantle propeller port and starboard
- Service propeller
- NDT check propeller
- Balancing propeller
- Install propeller
3 Dismantle rudder stock 2 Set
a. clearance rudder stock
b. Reinstall rudder stock

XVI General pipes and valve


1 Main line S/C
- Service valve main line S/C 2 Pcs
- Service strainer S/C 2 Pcs
2 Service ME Cooling line
- Service valve cooling ME P and S 2 Pcs
- Service SW cooling strainer, ME P and S 2 Pcs
3 Service O/B valve and other valve
- Service O/B valve Cooling S/W ME Port and starboard 2 Pcs
- Service O/B valve Cooling S/W AE Port and starboard 2 Pcs
- Service sewage O/B valve, Storm Valve 1 Pcs
- Service Sanitary O/B valve, Storm Valve 1 Pcs
- Service kitchen Sanitary O/B valve, Storm Valve 1 Pcs
- Service FO Valve bunker, 1 Pcs
- Service Emergency shut down FO valve 7 Pcs
4 Airvent
- Service air vent FO 5 Pcs
- Service air vent FW and ballast 5 Pcs
- Service air vent FP 4 Pcs
- Service air vent S/C include pipe 1 Pcs
5 Pipe hydrolic 1 Inchi 10 Meter

XVII General engine room repair


1 Cleaning engine room 1 EA
2 Service emergency stop FO quick closing 2 Pcs
3 service elmot blower(fan) E/R P.S 2 Unit

XVIII Machineries
1 Main engine port and starboard (Yanmar 6Y17P-GV) 2 Set
- General OH main engine port 2 Set
- Service ME cooling cover heat exchanger 2 Set
- General service alternator charger , and start 2 Set
2 Aux engine port annd starboard
- General OH AE port and starboard 2 Set
- Service dinmo starter AE 2 Set
3 Check safety device ME PS/STB

XX Other
1 Radio/HT 1 Pcs suply by tem KSA / Notyard
2 Perbaiki pelapon yang bocor 50 cm x 100 cm By yard
3 Ganti horn kapal 1 Pcs Suply by KSA install by crew
4 Repair handle lampu sorot 1 Pcs By yard
5 Perbiki kaca jendela anjungan yang pecah 1 Pcs By yard
6 Palu chipping 6 Pcs Suply by ksa
7 Mata gerinda 3 inch 10 Pcs Suply by ksa
8 Mata brush 10 Pcs Suply by ksa
9 Sarung tangan 2 Lusin Suply by ksa
10 Kacamata 10 Pcs Suply by ksa
11 Horden jendela anjungan (1 m x 2 m) 3 Pcs Suply by ksa
12 Intercom 5 Pcs Suply by ksa
13 Cat Suply by ksa
a. putih 15 Liter
b. kuning 10 Liter
c. merah 5 Liter
d. hijau 15 Liter
e. hitam 10 Liter
f. abu-abu 5 Liter
g. primer 10 Liter
14 Kain majum 50 Kg Suply by KSA
15 Lampu TL & Cover (Philips) 12 Set Suply by KSA install by crew

Prepared by / Disiapkan Oleh Acknowledged by / Diketahui oleh Approved by / Disetujui Oleh

Owner surveyor / FE and vessel crew Docking Manager General Manager Tech Director technical Chief Operating Officer

Date / Tgl: ……………….


Draft reading when survey
PS (m) SB (m) Trim (m) Trim (cm) TPC Total (ton) SAMPLE ONLY
FP 1.2 0.7 0.5 50 21.8 1090
MS 1.1 0.72 0.38 38 21.8 828.4
AP 0.95 0.78 0.17 17 21.8 370.6

You might also like