CORE INSTITUTE OF TECHNOLOGY, INC.

3rd Flr. JCMM Bldg., San Pedro St., Davao City


Tel. no. (082)221-8172 e-mail: coreinstituteoftechnology@gmail.com

Template & guide in creating Training matrix

Venue
Facilities/Tools Date &
Training Activity Trainee Remarks
and Equipment (Workstation/ Time
Area)
Prayer
Recap of Activities 8:00 AM
All to 8:30
Unfreezing Activities AM
trainees
Feedback of Training

Rejoinder/Motivation
observations
(List down all
on the
Facilities/Tools
(Specific Activities of progress of
and Equipment Name of
each Trainee for the each trainee
needed for the Workstation1
day here) for the day
workstation
will be
and activities
written here
here)

(Specific Activities of observations


(List down all
each Trainee here) on the
Facilities/Tools
progress of
and Equipment Name of
each trainee
needed for the Workstation 2
for the day
workstation
will be
and activities
written here
here)
observations
(List down all
on the
Facilities/Tools
(Specific Activities of progress of
and Name of
each Trainee for the each trainee
Equipment Workstation 3
day here) for the day
needed for the
will be
workstation and
written here
activities here)

observations
(List down all
on the
Facilities/Tools
(Specific Activities of progress of
and Equipment Name of
each Trainee for the each trainee
needed for the Workstation 4
day here) for the day
workstation
will be
and activities
written here
here)
CORE INSTITUTE OF TECHNOLOGY, INC.
3rd Flr. JCMM Bldg., San Pedro St., Davao City
Tel. no. (082)221-8172 e-mail: coreinstituteoftechnology@gmail.com

SAMPLE TRAINING MATRIX PORTFOLIO

TRAINING ACTIVITY MATRIX


Training Trainee Facilities/ Venue Date Remarks
Activity Tools and (Workstation/ &
Equipment Area) Time

 Prayer All 7:30AM


 Recap of trainees to
Activities 8:00AM
 Unfreezing
Activities
 Feedback of
Training
 Rejoinder
/ Motivation
 Assemble Grado 1. Computer Practical Aug 1 –  Assembled
computer Lamsin unit and Work Area – Aug 9, computer
hardware Layaog * peripherals Computer 2019 hardware
 Prepare Leonor 2. Tools  Prepared
Laboratory
installer Maldo 3. Windows installer
Ofamen installer 8:00AM
 Install UC 1 Install  Installed
operating Pajo * 4. Device to operating
and
system and driver 5:00PM system and
installer Configure
drivers for drivers for
5. Computer
peripherals/ peripheral/
devices Application Systems devices
 Install software  Installed
application installer application
software 6. software
 Conduct Diagnostic  Conducted
testing and tools testing and
documentation documentation

 Install Agustin 1. Computer Practical Aug 12  Installed


network cables Ajero units Work Area – – Aug network
 Set network Balane 2. LAN Computer 20, cables
configuration Bangi tester  Set network
Laboratory 2019
 Set Buligan 3. Crimping configuration
router/Wi-Fi/ Cainglet tools UC 2 Set-up 8:00AM  Set
wireless access 4. UTP cable router/Wi-
Computer to
point/repeater 5. Switch
6. WAP Networks 5:00PM Fi/ wireless
configuration access
 Inspect and 7. RJ45 point/
test the 8. Patch repeater
configured panel configuration
computer  Inspected
CORE INSTITUTE OF TECHNOLOGY, INC.
3rd Flr. JCMM Bldg., San Pedro St., Davao City
Tel. no. (082)221-8172 e-mail: coreinstituteoftechnology@gmail.com

networks and tested


the
configured
computer
networks

 Set-up user Casicas 1. Computer Practical Aug 22  Set-up user


access Corda units Work Area – – Aug access
 Configure Evidientes2. Server Computer 27,  Configured
network Espinosa installer network
Laboratory 2019
services Gadia 3. LAN services
 Perform Gomez tester UC 3 Set-up 8:00AM  Performed
testing, 4. Crimping Computer testing,
to
documentation, tools
5. UTP cable Server 5:00PM documentation
and pre- and pre-
deployment 6. Switch deployment
procedures 7. WAP procedures
8. RJ45
9. Patch
panel
 Plan and Ratay 1. Computer Practical Aug 28  Planned
prepare for Rodriguez units, Work Area – – Sep 2, and prepared
maintenance Sab peripherals Computer 2019 for
and repair Torres and maintenance
Laboratory
 Maintain Tuquib equipment 8:00AM and repair
computer Valle 2. Tools UC 4 to  Maintained
systems and 3. Accom- Maintain and 5:00PM computer
networks plishment systems and
Repair
 Diagnose report form networks
faults of Computer
 Diagnosed
computer Systems and faults of
systems and Networks computer
networks systems and
 Rectify/correct networks
defects in  Rectified/
computer corrected
systems and defects in
networks computer
 Inspect and systems and
test the networks
computer  Inspected
systems and and tested
networks the computer
systems and
networks