NO KONTRAK : JKNS/C/2021/37
LAPORAN KEMAJUAN BILANGAN: 5 (Recovery Plan)
TARIKH: 23 MAY – 30 JUNE 2022
DISEMAK Jabatan
OLEH: Kesihatan .................................................................................
Negeri Sabah BAHAGIAN KEJURUTERAAN
JABATAN KESIHATAN NEGERI SABAH
KERJA – KERJA PENGANTIAN DAN MEMBAIKPULIH SISTEM HAWA DINGIN DAN PENGUDARAAN BAGI
MENGURANGKAN RISIKO PERTUMBUHAN KULAT DI BANGUNAN WAD 6 TINGKAT HOSPITAL
DUCHESS OF KENT SANDAKAN, SABAH
ISI KANDUNGAN
No TAJUK
1. MAKLUMAT PROJEK
CARTA ORGANISASI
2. RINGKASAN STATUS KEMAJUAN PROJEK
3. LAPORAN KEMAJUAN TERPERINCI KEWANGAN
4. LAPORAN KEMAJUAN FIZIKAL
5. CARTA PROGRAM TERPERINCI
5.1 KEMAJUAN KEWANGAN CARTA
S-CURVE
5.2 KEMAJUAN FIZIKAL CARTA
S-CURVE
6. KERJA YANG DISIAPKAN BULAN INI
KERJA – KERJA PENGANTIAN DAN MEMBAIKPULIH SISTEM HAWA DINGIN DAN PENGUDARAAN BAGI
MENGURANGKAN RISIKO PERTUMBUHAN KULAT DI BANGUNAN WAD 6 TINGKAT HOSPITAL
DUCHESS OF KENT SANDAKAN, SABAH
1. MAKLUMAT PROJEK
1 Nama Projek Kerja – Kerja Pengantian dan Membaikpulih
Sistem Hawa Dingin dan Pengudaraan bagi
Mengurangkan Risiko Pertumbuhan Kulat
Di Bangunan Wad 6 Tingkat Hospital
Duchess of Kent Sandakan, Sabah.
PROJECT DIRECTOR
ABDULLAH RASYID BIN ARPA
014 - 5632077
KEWANGAN % 43 18 -25
FIZIKAL % 33 21 -12
KERJA – KERJA PENGANTIAN DAN MEMBAIKPULIH SISTEM HAWA DINGIN DAN PENGUDARAAN BAGI
MENGURANGKAN RISIKO PERTUMBUHAN KULAT DI BANGUNAN WAD 6 TINGKAT HOSPITAL
DUCHESS OF KENT SANDAKAN, SABAH
2.3 ARCHITECTURE, CIVIL AND STRUCTURAL WORKS RM298,700.00 10.29% 298,700.00 100.00% 42,700.00 0.00% 100.00% 0.00%
Install new Polyurethane (PU) foam insulation at the soffit of slab,
D2 RM58,000.00 2.00% 58,000.00 100.00% - 0.00% 100.00% 0.00%
beam and sides Blok A
Install new 9.5mm PVC laminated gypsum board ceiling (suspended
D3 RM70,000.00 2.41% 70,000.00 100.00% - 0.00% 100.00% 0.00%
ceiling system) Blok A
Remove old paint & make good plastering (with wall sealer) existing
D5 RM35,000.00 1.21% 35,000.00 100.00% - 0.00% 100.00% 0.00%
internal building wall Blok A
Remove old paint & make good plastering (with wall sealer) existing
D6 RM38,500.00 23/5/2022 23/6/2022 1.33% 38,500.00 100.00% 38,500.00 100.00% 0.00% 1.33%
external building wall Blok A
Fill clay brick, paster and screed both side all existing wall openings
D12 RM10,000.00 0.34% 10,000.00 100.00% - 0.00% 100.00% 0.00%
(fresh air intake) located above ceiling
D7 Install new Thermal Wall Panel for Internal Building Wall RM15,000.00 0.52% 15,000.00 100.00% - 0.00% 100.00% 0.00%
Apply one layer undercoat and two coats of PU Paint for new
D8 RM10,000.00 0.34% 10,000.00 100.00% - 0.00% 100.00% 0.00%
installed thermal wall panel
D9 Make good/ replace the affected vinyl flooring RM58,000.00 2.00% 58,000.00 100.00% - 0.00% 100.00% 0.00%
D13 Items not included in the above but shown in the drawings RM4,200.00 23/5/2022 23/6/2022 0.14% 4,200.00 100.00% 4,200.00 100.00% 0.00% 0.14%
3 LEVEL 4 445,350.00 15.33% 312,000.00 100.00% 36,700.00 0.00% 100.00% 0.00%
3.1 DISMANTLING WORKS RM23,150.00 0.80% 23,150.00 100.00% - 0.00% 100.00% 0.00%
B3 Dismantle existing ceiling RM20,500.00 0.71% 20,500.00 100.00% - 0.00% 100.00% 0.00%
B1 Dismantle existing Fan Coil Unit (FCU) RM1,950.00 0.07% 1,950.00 100.00% - 0.00% 100.00% 0.00%
B2 Dismantle existing Ventilation System (Exhaust Fan) RM700.00 0.02% 700.00 100.00% - 0.00% 100.00% 0.00%
3.2 MECHANICAL & ELECTRICAL WORKS RM155,500.00 5.35% 155,500.00 100.00% - 0.00% 100.00% 0.00%
C1 Install new Fan Coil Unit (FCU) RM71,500.00 2.46% 71,500.00 100.00% - 0.00% 100.00% 0.00%
C2 Install new Pre-fabricated air duct RM15,000.00 0.52% 15,000.00 100.00% - 0.00% 100.00% 0.00%
C3 Install new Ventilation System (Ducted Exhaust Fan) RM30,000.00 1.03% 30,000.00 100.00% - 0.00% 100.00% 0.00%
C4 Install wall mounted fungus risk monitor RM39,000.00 1.34% 39,000.00 100.00% - 0.00% 100.00% 0.00%
3.3 ARCHITECTURE, CIVIL AND STRUCTURAL WORKS RM266,700.00 9.18% 133,350.00 50.00% 36,700.00 0.00% 50.00% 0.00%
Install new Polyurethane (PU) foam insulation at the soffit of slab,
D2 RM53,000.00 1.82% 26,500.00 50.00% - 0.00% 50.00% 0.00%
beam and sides Blok A
Install new 9.5mm PVC laminated gypsum board ceiling (suspended
D3 RM60,000.00 2.07% 30,000.00 50.00% - 0.00% 50.00% 0.00%
ceiling system) Blok A
Remove old paint & make good plastering (with wall sealer) existing
D5 RM30,000.00 1.03% 15,000.00 50.00% - 0.00% 50.00% 0.00%
internal building wall Blok A
Remove old paint & make good plastering (with wall sealer) existing
D6 RM32,500.00 23/5/2022 23/6/2022 1.12% 16,250.00 50.00% 32,500.00 100.00% -50.00% 1.12%
external building wall Blok A
Fill clay brick, paster and screed both side all existing wall openings
D12 RM9,000.00 0.31% 4,500.00 50.00% - 0.00% 50.00% 0.00%
(fresh air intake) located above ceiling
D7 Install new Thermal Wall Panel for Internal Building Wall RM15,000.00 0.52% 7,500.00 50.00% - 0.00% 50.00% 0.00%
Apply one layer undercoat and two coats of PU Paint for new
D8 RM10,000.00 0.34% 5,000.00 50.00% - 0.00% 50.00% 0.00%
installed thermal wall panel
D9 Make good/ replace the affected vinyl flooring RM53,000.00 1.82% 26,500.00 50.00% - 0.00% 50.00% 0.00%
D13 Items not included in the above but shown in the drawings RM4,200.00 23/5/2022 23/6/2022 0.14% 2,100.00 50.00% 4,200.00 100.00% -50.00% 0.14%
PYHSICAL PROGRESS REPORT
Apply one layer undercoat and two coats of PU Paint for new
D8 RM10,000.00 0.34% - 0.00% - 0.00% 0.00% 0.00%
installed thermal wall panel
D9 Make good/ replace the affected vinyl flooring RM43,000.00 1.48% - 0.00% - 0.00% 0.00% 0.00%
D13 Items not included in the above but shown in the drawings RM4,000.00 23/5/2022 23/6/2022 0.14% - 0.00% 4,000.00 100.00% -100.00% 0.14%
6 LEVEL 1 486,800.00 16.76% - 0.00% 18,700.00 0.00% 0.00% 0.00%
6.1 DISMANTLING WORKS RM23,100.00 0.80% - 0.00% - 0.00% 0.00% 0.00%
B3 Dismantle existing ceiling RM20,500.00 0.71% - 0.00% - 0.00% 0.00% 0.00%
B1 Dismantle existing Fan Coil Unit (FCU) RM1,800.00 0.06% - 0.00% - 0.00% 0.00% 0.00%
B2 Dismantle existing Ventilation System (Exhaust Fan) RM800.00 0.03% - 0.00% - 0.00% 0.00% 0.00%
6.2 MECHANICAL & ELECTRICAL WORKS RM153,000.00 5.27% - 0.00% - 0.00% 0.00% 0.00%
C1 Install new Fan Coil Unit (FCU) RM66,000.00 2.27% - 0.00% - 0.00% 0.00% 0.00%
C2 Install new Pre-fabricated air duct RM15,000.00 0.52% - 0.00% - 0.00% 0.00% 0.00%
C3 Install new Ventilation System (Ducted Exhaust Fan) RM36,000.00 1.24% - 0.00% - 0.00% 0.00% 0.00%
C4 Install wall mounted fungus risk monitor RM36,000.00 1.24% - 0.00% - 0.00% 0.00% 0.00%
6.3 ARCHITECTURE, CIVIL AND STRUCTURAL WORKS RM310,700.00 10.70% - 0.00% 18,700.00 0.00% 0.00% 0.00%
Install new 9.5mm PVC laminated gypsum board ceiling (suspended
D3 RM30,000.00 1.03% - 0.00% - 0.00% 0.00% 0.00%
ceiling system) Blok A
Install new 9.5mm gypsum board ceiling (suspended ceiling system)
D4 RM175,000.00 6.03% - 0.00% - 0.00% 0.00% 0.00%
in all non air conditioned room area
Remove old paint & make good plastering (with wall sealer) existing
D5 RM15,000.00 0.52% - 0.00% - 0.00% 0.00% 0.00%
internal building wall Blok A
Remove old paint & make good plastering (with wall sealer) existing
D6 RM14,500.00 23/5/2022 23/6/2022 0.50% - 0.00% 14,500.00 100.00% -100.00% 0.50%
external building wall Blok A
Fill clay brick, paster and screed both side all existing wall openings
D12 RM9,000.00 0.31% - 0.00% - 0.00% 0.00% 0.00%
(fresh air intake) located above ceiling
D7 Install new Thermal Wall Panel for Internal Building Wall RM15,000.00 0.52% - 0.00% - 0.00% 0.00% 0.00%
Apply one layer undercoat and two coats of PU Paint for new
D8 RM10,000.00 0.34% - 0.00% - 0.00% 0.00% 0.00%
installed thermal wall panel
D9 Make good/ replace the affected vinyl flooring RM38,000.00 1.31% - 0.00% - 0.00% 0.00% 0.00%
D13 Items not included in the above but shown in the drawings RM4,200.00 23/5/2022 23/6/2022 0.14% - 0.00% 4,200.00 100.00% -100.00% 0.14%
7 LOWER LEVEL 38,000.00 1.31% - 0.00% 38,000.00 0.00% 0.00% 0.00%
Install new Polyurethane (PU) foam insulation at the soffit of slab,
D2 RM38,000.00 23/5/2022 30/6/2022 1.31% - 0.00% 38,000.00 100.00% -100.00% 1.31%
beam and sides Blok B
8 CLEANING AND DECONTAMINATION WORKS 50,000.00 1.72% 0.00% 1,500.00 0.00% 0.00% 0.00%
E1 Clean & decontamination works at all level RM15,000.00 0.52% 0.00% 1,500.00 10.00% -10.00% 0.05%
E2 One off indoor Air Quality Pre and Post sampling all level RM10,000.00 0.34% 0.00% 0.00% 0.00% 0.00%
E3 Item not included in the above RM25,000.00 0.86% 0.00% 0.00% 0.00% 0.00%
KERJA – KERJA PENGANTIAN DAN MEMBAIKPULIH SISTEM HAWA DINGIN DAN PENGUDARAAN BAGI
MENGURANGKAN RISIKO PERTUMBUHAN KULAT DI BANGUNAN WAD 6 TINGKAT HOSPITAL
DUCHESS OF KENT SANDAKAN, SABAH
100.0% 100%
95%
90.0% 90%
85%
80.0% 80%
70.0% 70%
60.0% 60%
50.0% 50%
45%
40.0% 40%
35%
30.0% 30%
25%
20.0% 20%
18.00%
15%
M11
M12
M13
M14
M15
M16
M17
M18
M19
M1
M2
M3
M4
M5
M6
M7
M8
M9
Month
May-22
May-23
Mar-22
Mar-23
Aug-22
Nov-21
Nov-22
Apr-22
Apr-23
Jun-22
Feb-22
Feb-23
Jan-22
Jan-23
Dec-21
Dec-22
Sep-22
Oct-22
Jul-22
100%
10%
15%
20%
25%
30%
35%
40%
45%
50%
60%
70%
80%
85%
90%
95%
0%
3%
5%
Schedule
10.00%
18.00%
2.38%
2.92%
4.80%
6.00%
7.39%
2%
Actual
RM134,724.38
RM66,458.25
RM53,040.00
RM39,520.00
RM55,590.00
RM24,400.00
RM80,135.62
Actual RM
KERJA – KERJA PENGANTIAN DAN MEMBAIKPULIH SISTEM HAWA DINGIN DAN PENGUDARAAN BAGI
MENGURANGKAN RISIKO PERTUMBUHAN KULAT DI BANGUNAN WAD 6 TINGKAT HOSPITAL
DUCHESS OF KENT SANDAKAN, SABAH
100.0% 100%
93%
90.0%
88%
80.0%
78%
73%
70.0%
68%
60.0%
58%
50.0%
48%
43%
40.0%
38%
33%
30.0%
28%
23%
20.0% 21.00%
18%
12% 11.00%
10.0%
8% 8.30%
7.00%
5.70%
3.00% 4.00%
3%
2.04%
0.0% 0% 1%
Nov-21 Dec-21 Jan-22 Feb-22 Mar-22 Apr-22 May-22 Jun-22 Jul-22 Aug-22 Sep-22 Oct-22 Nov-22 Dec-22 Jan-23 Feb-23 Mar-23 Apr-23 May-23
M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M13 M14 M15 M16 M17 M18 M19
Schedule 0% 1% 3% 8% 12% 18% 23% 28% 33% 38% 43% 48% 58% 68% 73% 78% 88% 93% 100%
Actual 2.04% 3.00% 4.00% 5.70% 7.00% 8.30% 11.00% 21.00%
M10
M11
M12
M13
M14
M15
M16
M17
M18
M19
M1
M2
M3
M4
M5
M6
M7
M8
M9
Month
May-22
May-23
Nov-21
Nov-22
Aug-22
Mar-22
Mar-23
Dec-21
Dec-22
Apr-22
Apr-23
Feb-22
Sep-22
Feb-23
Oct-22
Jun-22
Jan-22
Jan-23
Jul-22
100%
12%
18%
23%
28%
33%
38%
43%
48%
58%
68%
73%
78%
88%
93%
0%
1%
3%
8%
Schedule
11.00%
21.00%
2.04%
3.00%
4.00%
5.70%
7.00%
8.30%
Actual
KERJA – KERJA PENGANTIAN DAN MEMBAIKPULIH SISTEM HAWA DINGIN DAN PENGUDARAAN BAGI
MENGURANGKAN RISIKO PERTUMBUHAN KULAT DI BANGUNAN WAD 6 TINGKAT HOSPITAL
DUCHESS OF KENT SANDAKAN, SABAH