Grounding System: Maynilad Pumping Station 16 JULY 22,2022
Grounding System: Maynilad Pumping Station 16 JULY 22,2022
OF
GROUNDING SYSTEM
AT
MAYNILAD PUMPING STATION 16
General Contractor : Link Energie
JULY 22,2022
GROUNDING (EARTH) TEST REPORT
Station : MAYNILAD PUMPING STATION NO.09 Area : MCC ROOM AND PERMITER
MANILA WATER COMPANY
Equipment ID.: GROUNDING SYSTEM Reason of Test : PREVENTIVE MAINTENANCE
A. SPECIFICATIONS
M ake / Type : COPPER
Ur :
Year :
M ax cont.current :
B. TEST DATA
I. GROUNDING RESISTANCE TEST
TEST SPECIMEN GROUND/RESISTANCE Readings in Ohms (Ω) REMARKS
GROUNDING PIT 1 0.22 Passed
GROUNDING PIT 2 0.26 Passed
GROUNDING PIT 3 0.37 Passed
GROUNDING PIT 4 0.38 Passed
GROUNDING PIT 5 0.38 Passed
GROUNDING PIT 6 0.43 Passed
GROUNDING PIT 7 0.37 Passed
Auto Bar Screen 1 ABS-101 Control Panel Ground 0.22 Passed
Auto Bar Screen 2 ABS-102 Control Panel Ground 0.24 Passed
Sewage pump control panel no.1,2 & 3Ground 0.38 Passed
Standby Generator set ground 0.06 Passed
Generator set-Grounding system bus 0.07 Passed
MCC room-Grounding system bus 0.08 Passed
MCC room-MCC Panel grounding bus 0.06 Passed
3 point - grounding system 0.21 Passed
Point 1 0.23 Passed
Point 2 0.20 Passed
Point 3 0.20 Passed
Remarks : Grounding Resistance (Earth) tested and within passing criteria, suitable for operation.
Florencio Enriquez
BestCor Phils. Inc. LINK ENERGIE