5. DRAINAGE
DRAINAGE LAYOUT FOR THE DEVELOPMENT AND DESIGN SUPPORTING CALCULATIONS FOR
SIZING OF ALL CONCRETE SURFACE AND UNDERGROUND DRAINS AND DETAILS WILL BE
SUBMITTED BY REGISTERED PROFESSIONAL CIVIL ENGINEER AT LATER STAGE.
7. BOMBA REQUIREMENT
E
2-WAY PILLAR TYPE FIRE HYDRANT SHALL BE PROVIDED AS SHOWN ON PLAN. THE SIZE OF THE
WATER MAIN WILL NOT BE LESS THAN 150MM DIA.
LOCATION OF THE FIRE HYDRANT WILL NOT BE MORE THAN 2M FROM THE ROADSIDE.
INSTALLATION WILL COMPLY TO THE JABATAN BOMBA MALAYSIA'S SPECIFICATIONS.
N ACCESS ROAD OF 6M WIDE AND WILL BE ABLE TO WITHSTAND 20 TONS FIRE ENGINE WILL BE
PROVIDED AS SHOWN. HAMMERHEAD TURNING PROVIDED AS SHOWN.
THREE (3) SETS OF THE PLAN INDICATING THE REQUIREMENTS OF THE JABATAN BOMBA WILL BE
SUBMITTED FOR APPROVAL AND ENDORSEMENT.
8. TELEKOM REQUIREMENT
COMPLIANCE TO THE REQUIREMENTS OF SYARIKAT TELEKOM MALAYSIA. THE DEVELOPER WILL
PROVIDE TELEPHONE SERVICE FACILITIES ACCORDING TO SPECIFICATIONS AND GUIDELINES OF
TELEKOM MALAYSIA BHD. DETAIL PLAN WILL BE SUBMITTED BY REGISTERED ENGINEER TO
TELEKOM MALAYSIA FOR APPROVAL BE WORKS COMMENCE.
LOCALITY PLAN
ARCHITECTURAL LEGENDS
PROPOSED PLATFORM LEVEL
R.C. DRAIN
16 MAY 2022
SEWER LINE
9KG DRY POWDER FIRE EXTINGUISHER
TO BOMBA APPROVED TYPE
BOUNDARY LINE APL/KB/BP-2103/01 & APL/KB/BP-2103/02
S.K KEPAYAN
SK. KEPAYAN
JA
LA
N
PA
HLA
WA
N
SIGNATURE .............................................................
NAME :
I.C
ANANG
EXISTING
G
ACADEMIC
JALAN
BUILDING
LEMBAGA Ar. Paul S S Liaw
ARKITEK
MALAYSIA
ARKITEK PROFESIONAL
No Pendaftaran LAM : A/L 267
PROPOSED NEW DOUBLE STOREY
SURAU ON EXISTING S.K KEPAYAN
LOT AT KEPAYAN KOTA
KINABALU, SABAH.
1
6764
A 6
S.K KEPAYAN
KIB
N 6100
SITE PLAN
3050