GENERAL NOTES

1. DIMENSIONS 7. ALIGNMENT AND GRADES ARE SUBJECT TO ADJUSTMENT TO SUIT EXISTING FIELD CONDITIONS.
A. DIMENSIONS ARE IN MILLIMETERS / METERS UNLESS OTHERWISE INDICATED.
B. STATIONS ARE GIVEN IN KILOMETERS AND METERS 8. DISTANCES AND ELEVATIONS ARE IN METERS UNLESS INDICATED OTHERWISE.
C. RADII TRANSITION CURVES, AND ELEVATIONS ARE GIVEN IN METERS.
9. GRADES SHOWN ARE TOP OF FINISHED PORTLAND CEMENT CONCRETE PAVEMENT.
2. STATIONING:
A. ROAD STATIONS AND ELEMENTS ARE RELATIVE TO THE CENTERLINE OF THE ROAD UNLESS OTHERWISE INDICATED. 10. ALL WORKS SHALL COMPLY WITH THE " DPWH DESIGN GUIDELINES CRITERIA AND STANDARDS" VOL.II
B. STATIONS ARE LOCATED AT; EDITION,"GENERAL SPECIFICATIONS FOR ROADS AND BRIDGES" 1976 AND "AASHTO INTERIM GUIDE
a. EVERY 20.0 METERS FOR DESIGN OF PAVEMENT STRUCTURES" 1972.
b. EVERY BRIDGE ABUTMENT AND
c. EVERY POINT OF HORIZONTAL GEOMETRY 11. BEFORE THE START IF ACTUAL CONSTRUCTION, THE AS-STAKED PLAN SHOULD BE SUBMITTED TO
THE REGIONAL OFFICE IN ORDER THAT IMMEDIATE STEPS MAY BE UNDERTAKEN TO CORRECT OR
3. ELEVATIONS AND GRADES: ADJUST WHATEVER APPRECIABLE DEVIATION THERE MAY BE FROM THE ORIGINAL PLAN.
A. ELEVATIONS GIVEN IN THE COLUMN " FINISHED GRADE" REFER TO THE FINISHED GRADE LEVEL AS SHOWN IN ROAD
CROSS SECTIONS. 12. PRIOR TO CONSTRUCTION, THE ADEQUACY/ APPROPRIATENESS OF THE THICKNESS OF PAVEMENT
B. THE ELEVATIONS GIVEN IN THE COLUMN "ORIGINAL GROUND" REFER TO THE EXISTING GROUND PROFILE AT THE STRUCTURE SHALL BE VALIDATED BY UNDERTAKING PAVEMENT DESIGN ANALYSIS TAKING INTO
ROAD GEOMETRIC CENTERLINE. CONSIDERATION THE ACTUAL CBR & TRAFFIC (ESAL.) ALONG THE ROAD SECTION.

4. ROAD SIGNS: 13. THIS PLAN IS INTENDED FOR BIDDING AND CONSTRUCTION PURPOSES AND THE REQUIRED SURVEY
A. THE MATERIAL, DIMENSIONS, SHAPES, COLORS, SIZE OF NUMERALS, LETTERS AND INSTALLATION SHALL BE IN DATA AND TECHNICAL INFORMATION IN ACCORDANCE WITH THE DPWH GUIDELINES WILL BE
THE ACCORDANCE WITH THE PHILIPPINE ROAD SIGN MANUAL, 1997. DETERMINED / VERIFIED DURING PRE-CONSTRUCTION SURVEY.

5.PAVEMENT MARKINGS:
A. THE DIMENSIONS, SHAPES, COLORS, SIZE OF NUMERALS, LETTERS AND INSTALLATION SHALL BE IN ACCORDANCE
WITH THE SPECIFICATIONS OF DPWH MANUAL ON PAVEMENT MARKINGS, 1980.

6. SPECIFICATIONS:
- DPWH SPECIFICAION FOR HIGHWAYS, BRIDGES AND AIRPORTS, VOL. II -2013
- SPECIAL PROVISIONS
- SUPPLEMENTAL SPECIFICATIONS

2013 A A D T DATA DESIGN DATA SYMBOLS ABBREVIATIONS


TRAFFIC STATION: PORTLAND CEMENT CONCRETE BEG. BEGINNING
ROAD SECTION ID: Design Life = 20 Years PAVEMENT BH BORE HOLE
CONC. CONCRETE
SECTION IN EARTH
Assumed Traffic Growth, TGR = 4.00 % ELEV. ELEVATION
MOTOR-TRICYLCE = ENGR. ENGINEER
R = 85.00 % SECTION IN STONE MASONRY
F.G.E FINISHED GRADE ELEVATION
PASSENGER CAR = O.G.E ORIGINAL GROUND ELEVATION/ TOP OF EXISTING
ZR = -1.037 SECTION IN GRANULAR BEDDING PAVEMENT
PASSENGER UTILITY = H HEIGHT
Overall Standard Deviation, S0 = 0.35 LIMITS OF DIMENSION HOR. HORIZONTAL
GOODS UTILITY = KM KILOMETER
W18 = 2.206 x 10 (18 KIP ESAL) CENTERLINE L LENGTH
SMALL BUS = LVC LENGTH OF CURVE
pt = 2.50 DIAMETER M/m METER
LARGE BUS = M.O MIDDLE ORDINATE

RIGID TRUCKS 2 AXLES =


= 2.00 PERCENT % mm
PCCP
MILLIMETER
PORTLAND CEMENT CONCRETE PAVEMENT

RIGID TRUCKS 3 AXLES =


S'c = 751 psi AND
& PIVC
RCBC
POINT OF INTERSECTION OF VERTICAL CURVE
REINFORCED CONCRETE BOX CULVERT
Cd = 1.00
TRUCK SEMI TRAILER =
AT @ RCPC
RSB
REINFORCED CONCRETE PIPE CULVERT
REINFORCING STEEL BAR
3 & 4 AXLES J = 3.80 NORTHING g GRADE/ SLOPE
e SUPER ELEVATION
TRUCK SEMI TRAILER = Ec = 3.605 x 10 PS w WIDENING
5 AXLES I A PCCP AREA OF PORTLAND CEMENT CONCRETE PAVEMENT
k = pci A CUT AREA CUT CONCURRED :
TRUCK TRAILER = A FILL AREA FILL
4 AXLES DESIGN CBR = STA. STATION
THK. THICK CAPTAIN JIM C. SYDIONGCO
TRUCK TRAILER = DESIGN CESAL = VERT. VERTICAL DIRECTOR GENERAL
DATE :
5 AXLES & AND
PREPARED : PROJECT NAME AND LOCATION : SHEET CONTENTS : CHECKED : SUBMITTED : REVIEWED : RECOMMENDED : APPROVED : SET NO. SHEET NO.

ALPHA & OMEGA GEN. AS-STAKED PLAN REPUBLIC OF THE PHILIPPINES


CONTRACTOR & DEV'T CORP./ G
RUNWAY STRIP GRADE CORRECTION OF GENERAL NOTES, LEGENDS, AND DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS SABENIANO D. CALIAO, JR. ZENAIDA T. TAN 6
ABIB BUILDERS ENTERPRISES CEZARAH ROWENA C. DISCAYA OZAMIZ CITY AIRPORT ROAD, MISAMIS ABBREVIATIONS REGION - X
ADELINO T. TANGAPA, DM VIRGIE G. NAYVE REY PETER B. GILLE
AUTHORIZED MANAGING PROJECT ENGINEER III CHIEF, CONSTRUCTION DIVISION CHIEF, PLANNING AND DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR 8
(JV) OFFICER
OCCIDENTAL OFFICE OF THE REGIONAL DIRECTOR
ENGINEER'S HILL, BULUA, CAGAYAN DE ORO CITY
4 74
DATE : DATE : DATE : DATE : DATE :

DATE :