TECHNICAL EVALUATION REPORT – DEMOLISHING OF EXISTING B+G+4 BUILDING AND CONSTRUCTION OF A NEW B+G+M+5

BUILDING AT HARAR

1. The construction project management team will be in charge of two responsibilities during the opening
of a new branch: Site work and Office work. Please explain the duties done during site work and as
well as in the office.
2. Describe the distinction between interim and final payments.
3. Explain the following two terms listed below:
A. Extension of Time
B. Variation work
4. As a construction project management team, there are routine tasks that the team handles, so make
a list of the tasks that the team handles.
5. Describe the distinction between maintenance and new construction.
6. Explain the difference between a performance bond guarantee and an advance guarantee.
7. Assume that the bank intends to open additional branches in Adama town, near the business center,
and that you have been assigned to visit the location and plan the branch layout. As a result, as an
engineer, you should develop an ideal branch layout with all of the components that future branches
will need to open.