SITE APPRAISAL FORM


School: CENTRAL BULANAN ELEM. SCHOOL School ID: 130195
Address: CENTRAL BULANAN, MIDSAYAP, COTABATO Name of Principal: MERLY ARJENTINA P. TABIFRANCA
No. Street Baranggay City/Municipality Province

Division: COTABATO
Region: X11

I. SITE INFORMATION

Site Ownership: Titled under the name of Contract of Usufruct ∕ Deed of Donation Tax Declaration

DepED ∕ Private/Others With conditions Absolute DepED

LGU Perpectual Use With Condition LGU

Deed of Sale Presidential Proclamation Others/ specify:

Location: Urban Low land Island Coastal Others/ specify:

∕ Rural High land/Up land w/ about ____ km boat ride from the mainland

Distance to nearest public school:_ 2 KM Distance to nearest private schoo 4 KM


Name of nearest public school :_ DR. CH. DELES ELEM. SCHOOL Name of nearest private school MIDSAYAP MONTESORI CENTER

Topography: ∕ Level/ Flat Sloping Rolling w/ cut & fill works (_____m)/ needs site
Others/ specify: improvement

Flood Level: NONE (m) Often utilized as Evacuation Center during Disaster/Emergencies Yes ∕ No

Soil Condition: Rocky Sandy Clayey LOAM

Power Supply: NPC Line ∕ Cooperative Generator Others/ PELCO

Water Supply: ∕ Potable (drinking) Local Water District Spring Others/ specify:

Distance from Tapping Point: ______(m)

Not Potable Deepwell Shallow well

Depth: ______(m) Depth: ______(m)

Access: ∕ Cemented ____ 4 km.


KM Asphalt _______ km. Gravel bed _______ km. Rough _____ km

Hiking______km. Others/ specify: By boat _______ km.

Material Source: Distance from the school site: 4 KM.

II. SITE DEVELOPMENT PLAN Total lot area: ____ 10000 SQ.M Proposed total buildable space for construction:_______
5,000 SQ. M.
Calamansi
Orchard

pathwalk
access road
2 1 3 2 1 orientation
distance between bldgs.
Coconut, Banana and Mahogany

indicate set back


1
Proposed Building Area

Entry Gate

Baranggay Road

Sports Ground
Orchard

2
Flag
Pole
1
1
Covered
2 Court

1
Reading Centers
1
Stage

*To include the locations of proposed Electrical and Water Supply lay-out
III. FEASIBILITY

A. SCHOOL BUILDING

Condition
No. of
Type of Building For Remarks
Units Good Needs Replacement
Repair
Academic Classrooms 8 5 3 0 * Indicate justification on the following
Science Laboratory 0 conditions:
Home Economics 0 - needs replacement
Industrial Arts 0 - for demolition
Kindergarten 1 1 - for condemnation
Makeshift Classrooms 1 1 - heritage school building for
demolition/condemnation
Total: 11
Anxiliary Rooms
Admin Offices 1 1
Library 1 1
Canteen 1 1
Others
Total: 3 3
WASH Facilities
Attached Toilets 10 1
Urinals 0
Toilet 10 1
Toilet for PWD 0
Detached Toilets 2
Urinals 0
Toilet 2
Handwashing Facilities 2
Total: 6 2

B. AVAILABLE SPACE FOR CONSTRUCTION


(For this section, location/s of the available space for construction(if any)should be reflected in the Site Development Plan)

Building footprint can be accomodated in the Remarks (Additional Site


available space?* Information e.g.
No. of Units
Type of Building Embankment, Slope
(Building)
Yes, but with Protection, Hauling
Yes, but with etc.)
Yes design No
demolition
modification

2 1 STOREY MARCOS PRE-FAB ∕


1 1 STOREY BAGONG LIPUNAN BLDG ∕ DELAPIDATED W/ CRACKS
1 1 STOREY SCHOOL CANTEEN-MAKESHIFT ∕ DELAPIDATED W/ CRACKS
1 1 STOREY BAGONG LIPUNAN BLDG ∕ DELAPIDATED W/ CRACKS
1 1 STOREY ARMY TYPE ∕ DELAPIDATED W/ CRACKS
1 1 COVERED COURT ∕
* If the site will require demolition of an old or condemnable structure, specify in the remarks column the type and number of buildings and classrooms to be demolished. If the site will require some modifications in the
design,specify in the remarks columns the particular modifications to be made in the design of the building.

C. SCHOOL PROFILE
Student Population : ____ 254 No. of Classes: ___ 7

ELEMENTARY Kinder I II III IV V VI Total

No of Enrollment 36 25 44 42 45 33 29 254

No. of Sections 1 1 2 1 1 1 1 8

SECONDARY Y1 Y2 Y3 Y4 Total
No of Enrollment

No. of Sections

SENIOR HIGH Y1 Y2 Total


No of Enrollment

No. of Sections

Additional Remarks (if any):

Appraised by: Noted:

MERLY ARJENTINA P. TABIFRANCA


DepEd Engineer School Head/ Principal/Teacher-in-charge Date of Inspection